Page images
PDF
EPUB

OTHER INFORMATION:

Planning was suspended the following
Remaining funds were revoked and the project was reclassified, "Inactive.'
Funds to initiate planning were appropriated in FY 1955.
Funds to resume planning were appropriated in FY 1966 and to initiate construction in FY 1967.
year due to lack of local support.

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

1/ Includes an allowance for estimated inflation through the construction period.

/ Includes $152,000.00 for adjustments in the estimated inflation allowance through the construction period.

[blocks in formation]
[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][merged small][merged small][merged small][merged small][merged small]
[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed]

APPROPRIATION TITLE:

PROJECT:

Construction, General

Local Protection Projects (Flood Control) Missouri River Levee System, Iowa, Nebraska, Kansas and Missouri (Active Units) (Continuing) LOCATION: Along both sides of the Missouri River, Sioux City, Iowa, to the Mouth.

AUTHORIZATION:

1941 and 1944 Flood Control Acts

BENEFIT-COST RATIO: The remaining benefit remaining cost ratio is 1.5 to 1 at 2 1/2 percent. This project was a part of the comprehensive plan for the Missouri River Basin for which the benefit-cost ratio was 1.5 to 1 in support of the initial construction appropriation requested in FY 1948.

[blocks in formation]

Scheduled Balance to Complete after FY 1986

Unscheduled Balance to Complete after FY 1986

$86,984,000

900,000

1,250,000 2/ 88,234,000

850,000 3,034,000 182,882,000 3/

32

22

32

14 feet

540 miles 427,000 acres

1/ In addition, numerous flood control works have been constructed over many years by individuals and groups as
land along the Missouri River has been developed for agricultural use. The total cost of these improvements is

2/

[ocr errors]

unknown.

Reflects transfer of $350,000 to the project.

3/ Preconstruction planning for Unit L385 is scheduled to be completed in FY 1987, and for Units L330-345, L319325, and L15 in FY 1991, after which they will be considered for construction under the cost-sharing policy in effect at that time.

[blocks in formation]

Missouri River Levee System, Iowa, Nebraska, Kansas and Missouri

« PreviousContinue »