.PY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:

DISPOSITION/STATUS OF ITEMS PROPOSED FOR PUNDING

(Dollar Amounts In Thousands)

[blocks in formation]
[blocks in formation]

25 Jan. 1985 0933D

50

Do not prepare a preliminary
master plan under the rec-
reation facilities at completed
projects program; there is no
Federal interest in developing a
city park on non-Federal lands.

9,750 3/ Modify project by widening
bends at three locations at
a cost of $1,600. Contract
awarded 4 September 1984.
Keep project in operational

1,530

status.

No change.

No change.

Problem areas, such as clearing wreck from one

bend, should be complete by mid March 1985.

Project being kept operational in FY 1985.

ALA

851

RLA

1,882

Operate project to provide releases for white water recreation.

Project being operated to provide releases for white water.

Do not provide supplement to master plan on the basis that there is no Federal interest. Access roads on project lands considered adequate, roads not on project lands are not a Federal responsibility.

No change.

North Branch Chicano

RA

River, 11.. Not Inkjete.

150 3/ Remove trees and debt in from channel.

$110 allotted.

Added without languaje.

17

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:
DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING -

[blocks in formation]
[blocks in formation]

DISPOSITION/STATUS

AS OF 25 JANUARY 1985

AS OF SEPTEMBER 1984

OPERATION & MAINTENANCE, GENERAL (cont.)

25 Jan. 1985 09330

[blocks in formation]

Funds will be allotted for construction of the elevated
walkway. Implementing Memorandum of Understanding setting
forth extent of Federal and non-Federal responsibilies now
being prepared.

[blocks in formation]

Pending detailed review, no funds are to be allotted for construction and maintenance.

Funds required for construction ($450) up to maximum allowed by law, and maintenance ($16) allotted.

Undertake a study to control
the erosion that is
jeopardizing the existing
flood protection works.

Expenditures should be limited
to study costs estimated at
$220 pending determination of
suitable authority or enactment
of authorizing legislation.

Funds allotted, study underway.

2/ Increase the monetary limit specified by Sec. 1301 of

P.L. 98-181 from $2,000 to
$3,000 for refurbishment,
restoration, and O&M of the
Dredge Kennedy at the
Louisiana World Exposition.

18

Limit was increased. Exposition closed Nov. 1984. Ultimate disposition of Dredge Kennedy not determined.

DIV/ITEM & DESCRIPTION

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:

DISPOSITION/STATUS OF ITEMS PROPOSED POR FUNDING

(Dollar Amounts In Thousands)

[blocks in formation]
[blocks in formation]

25 Jan. 1985 09330

Current estimated cost $629. Scheduled for award June 1985.

If economically justified, dredge 210,000 CY. for

the channel around Harbor Isl. Last channel maint. in 1948.

Current estimated cost of channel around Harbor Island (only) $700. Scheduled for award July 1985.

Project is authorized and no new construction under project authority has been done. Erosion control work done under Sec 32 was incorporated by project authorization. Accordingly no funds are to be obligated.

The September 1984 position is being reviewed.

* Allocate funds for operation of system.

$680 allotted for construction of system. Addl. funds to be allotted as needed. System not yet operational.

Allocate funds to dredge harbor as necessary.

Allocate funds to dredge harbor as necessary.

$1,331 allotted to date. Addl. funds will be allotted if needed.

$623 allotted.

Hold decision to allocate funds until NPD provides report on total cost and justification for work.

Additional funds allotted. Work to eliminate safety hazards is underway.

19

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING

(Dollar Amounts In Thousands)

25 Jan. 1985 0933D

DIV/TTEM & DESCRIPTION

[ocr errors]
[blocks in formation]

Report Language and Allocation, AL Act Language, ALA Act Language and

Source: RA= Report Allocation, RL = Report Language, RLA =
Allocation
Within available funds.

Although Act authorizes and directs the work, funds are not included in Act language. Funds are included in the project by project listing in the Conference report.

4/ $12,500 is allotted in Conference and Senate report language, with language to spend approximately $16,000 with the balance coming from within available funds.

20

[blocks in formation]

Louisiana Coastal Area (Land Loss & Marsh Creation), LA
Louisiana Coastal Area (Water Supply), LA

Louisiana Coastal Area (Shore & Barrier Island Erosion), LA

[blocks in formation]

Mar 85

Feb 85

Jan 85

Jan 85

26 Dec 84

26 Dec 84

26 Dec 84

Apr 85
Jun 85

2/3/4/

Ark. River & Tribs, South Central & Southeast Areas of OK
Red River Basin, AR, TX, LA & OK

Mar 85

Mar 85

[blocks in formation]