FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: DISPOSITION/STATUS AS OF 25 JANUARY 1985 AS OF SEPTEMBER 1984 GENERAL INVESTIGATIONS - ONGOING STUDIES 25 Jan. 1985 0933D For list of studies showing estimated date of transmittal of conditional cost sharing contract, see pages 23 and 24. as of 1 February, 5 contracts have been executed, the contracts transmitted to ASA (OW) and initial feasibility funds have been allotted. $100 allotted to Kansas and $110 allotted to Oklahoma in FY 1985. No consideration being given to additional allocations. Recon report is scheduled for completion in the 3rd Quarter of FY 1985. $500 allotted to Passaic River Basin, P-1 for FY 1985. $200 allotted. FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: AS OF SEPTEMBER 1984 GENERAL INVESTIGATIONS ONGOING STUDIES (cont.) shoreline study using up to 25 Jan. 1985 0933D Continue study in FY 1985 ($250). Complete recon. phase ($35). Complete study with budgeted $400 allotted in FY 1985. $30 allotted in FY 1985 to complete recon. report. $200 allotted to complete study. Inadvertantly ommitted from original report. Study is for protection of shoreline for recreation; low Fully funded - The $100K allotted No change. Draft recon report scheduled for completion in the 3rd Quarter of FY 1985. Defer action pending review of results of FY 84 program. Phase I (FY 84) contract extended at no cost. results to be available 3rd Quarter FY 85. Review of 3 FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING (Dollar Amounts In Thounandin) 25 Jan. 1985 09330 Hugo Lake Hydropower, OK MISSOURI RIVER RA $200 $165 allotted to complete recon report, scheduled for (Not included in previous report) $100 allotted for evaluation of alternatives and selection of plans for system optimization. Add'l $75 to be allotted in FY 1985 to continue studies. $350 allotted for technical assistance on the Platte Cont im contact me with tex21 ml the tale of th Dakota concerning need tor tunis. Transter will be made to US, if needed. Do not combine since Oakland Outer No change. Allocate $90K of available funds to proceed with the development of the optimum flood control plan for the basin. $90 allotted in FY 1985. FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: 25 Jan. 1985 09330 Allocate funds based on status of survey report. No funding, if Division Engineer notice not issued. During BERH review, fund to answer BERH questions; if BERH has acted favorably, fund unless no Federal interest has been determined or is expected to be determined. Studies not funded Maumee Bay State Park, OH Reason Provide no funding based on No change. The solution to the New York metropolitan area FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES NEW CPLE FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: (Dollar Amounts In Thousands) 25 Jan. 1985 0933D Corps would accept funds from the Commonwealth of Virginia for P&S if offered for update; Section 14 emergency program inappropriate for protection of runway. To date no funds have been offered by the Commonwealth of Virginia. 300 3/ Although Act authorizes and directs the work, funds are not included in Act language. listing in the Conference report. Funds are included in the project by project |