FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:
DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING -

[blocks in formation]
[blocks in formation]

DISPOSITION/STATUS

AS OF 25 JANUARY 1985

AS OF SEPTEMBER 1984

GENERAL INVESTIGATIONS - ONGOING STUDIES

25 Jan. 1985 0933D

[blocks in formation]

For list of studies showing estimated date of transmittal of conditional cost sharing contract, see pages 23 and 24. as of 1 February, 5 contracts have been executed, the contracts transmitted to ASA (OW) and initial feasibility funds have been allotted.

[blocks in formation]

$100 allotted to Kansas and $110 allotted to Oklahoma in FY 1985. No consideration being given to additional allocations.

[blocks in formation]

Recon report is scheduled for completion in the 3rd Quarter of FY 1985.

$500 allotted to Passaic River Basin, P-1 for FY 1985.
No CP&E funds allotted, since survey report is not
complete.

$200 allotted.

[blocks in formation]

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:
DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING

[blocks in formation]
[blocks in formation]

AS OF SEPTEMBER 1984

[blocks in formation]

GENERAL INVESTIGATIONS ONGOING STUDIES (cont.)

shoreline study using up to

[blocks in formation]

25 Jan. 1985 0933D

Continue study in FY 1985 ($250).

Complete recon. phase ($35).
Initiate feasibility study
in accord with the general
policy reflected under item
1, page 2..

Complete study with budgeted
funds, provide $200 from
available funds, if needed.

$400 allotted in FY 1985.

$30 allotted in FY 1985 to complete recon. report.
Additional $400 scheduled to be allotted March 1985 to
initiate feasibility study.

$200 allotted to complete study.

[blocks in formation]

Inadvertantly ommitted from original report.

Study is for protection of shoreline for recreation; low
priority output. $50 allotted to bring study to logical
completion point to provide useful information to local
interests for their implementation.

Fully funded - The $100K allotted
to date was provided to continue
coordination with State of
Missouri, update the scope of
study, and complete a recon study
which will: evaluate existing and
future water supply and demand;
provide an analysis of local demo-
graphics, economics, and infra-
structure; and identify possible
water conservation measures. Re-
visit stulyafter recon complete.

No change. Draft recon report scheduled for completion in the 3rd Quarter of FY 1985.

Defer action pending review of results of FY 84 program.

Phase I (FY 84) contract extended at no cost. results to be available 3rd Quarter FY 85.

Review of

[graphic]

3

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING

(Dollar Amounts In Thounandin)

[blocks in formation]

25 Jan. 1985 09330

[blocks in formation]

Hugo Lake Hydropower, OK
Increase of $100 over budget
request.

MISSOURI RIVER

RA

$200

$165 allotted to complete recon report, scheduled for
March 1985. Funds will be allotted to initiate
feasibility study upon transmittal of conditional cost
sharing contract.

(Not included in previous report) $100 allotted for evaluation of alternatives and

selection of plans for system optimization. Add'l $75 to be allotted in FY 1985 to continue studies.

[merged small][merged small][merged small][subsumed][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

$350 allotted for technical assistance on the Platte
River, NE. The activities under the authority of Section
55 of Public Law 93-251, along the Platte River in NE are
to be executed in accordance with the guidance set forth
in A/ASA (CW) letter to Congresswoman Smith, dated 3 Oct.
1984, which is in accord with understandings reached by
Congresswoman Smith and OMB officials.

Cont im contact me

with tex21 ml the tale of th

Dakota concerning need tor tunis. Transter will be made to US, if needed.

Do not combine since Oakland Outer No change.
Harbor is being considered as new
construction start and Oakland
Inner Harbor is in CPLE status.

Allocate $90K of available funds to proceed with the development of the optimum flood control plan for the basin.

$90 allotted in FY 1985.

[graphic]

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:
DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING -

[blocks in formation]

25 Jan. 1985 09330

Allocate funds based on status of survey report. No funding, if Division Engineer notice not issued. During BERH review, fund to answer BERH questions; if BERH has acted favorably, fund unless no Federal interest has been determined or is expected to be determined.

Studies not funded Maumee Bay State Park, OH

[blocks in formation]

Reason

[blocks in formation]

Provide no funding based on
a lack of Federal interest.

No change. The solution to the New York metropolitan area
water supply problem is single purpose in nature. Such
solutions are a local responsibility.

FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES NEW CPLE

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][graphic]
[graphic]

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:
DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING -

(Dollar Amounts In Thousands)

[blocks in formation]
[blocks in formation]

25 Jan. 1985 0933D

Corps would accept funds from the Commonwealth of Virginia for P&S if offered for update; Section 14 emergency program inappropriate for protection of runway.

To date no funds have been offered by the Commonwealth of Virginia.

300

[blocks in formation]
[ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

3/ Although Act authorizes and directs the work, funds are not included in Act language. listing in the Conference report.

Funds are included in the project by project