FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:

DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING

(Dollar Amounts In Thousands)

[blocks in formation]
[blocks in formation]

25 Jan. 1985 0933D

[blocks in formation]

For list of studies showing estimated date of transmittal of conditional cost sharing contract, see pages 23 and 24. as of 1 February, 5 contracts have been executed, the contracts transmitted to ASA (CW) and initial feasibility funds have been allotted.

[blocks in formation]

$100 allotted to Kansas and $110 allotted to Oklahoma in FY 1985. No consideration being given to additional allocations.

[blocks in formation]

Compl. recon report w/funds already allotted and fund restudy in FY 85 if recon report justifies further funding.

[blocks in formation]

Recon report is scheduled for completion in the 3rd Quarter of FY 1985.

$500 allotted to Passaic River Basin, PH-1 for FY 1985.
No CP&E funds allotted, since survey report is not
complete.

$200 allotted.

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING

[blocks in formation]
[blocks in formation]

AS OF SEPTEMBER 1984

DISPOSITION/STATUS

AS OF 25 JANUARY 1985

GENERAL INVESTIGATIONS - ONGOING STUDIES (cont.)

200

25 Jan. 1985 0933D

Continue study in FY 1985 ($250).

Complete recon. phase ($35).
Initiate feasibility study
in accord with the general
policy reflected under item
1, page 2..

Complete study with budgeted funds, provide $200 from available funds, if needed.

$400 allotted in FY 1985.

$30 allotted in FY 1985 to complete recon. report.
Additional $400 scheduled to be allotted March 1985 to
initiate feasibility study.

$200 allotted to complete study.

[blocks in formation]

Study is for protection of shoreline for recreation; low
priority output. $50 allotted to bring study to logical
completion point to provide useful information to local
interests for their implementation.

No change. Draft recon report scheduled for completion in the 3rd Quarter of FY 1985.

[blocks in formation]
[blocks in formation]

Phase I (FY 84) contract extended at no cost. Review of results to be available 3rd Quarter FY 85.

[graphic]

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:
DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING -

[blocks in formation]
[blocks in formation]

AS OF SEPTEMBER 1984

[blocks in formation]

25 Jan. 1985 09330

GENERAL INVESTIGATIONS - ONGOING STUDIES (cont.)

Initiate feasibility study in
accord with the general policy
reflected under item 1, page 2.

$165 allotted to complete recon report, scheduled for
March 1985. Funds will be allotted to initiate
feasibility study upon transmittal of conditional cost
sharing contract.

(Not included in previous report) $100 allotted for evaluation of alternatives and

selection of plans for system optimization. Add'l $75 to be allotted in FY 1985 to continue studies.

[blocks in formation]

$350 allotted for technical assistance on the Platte
River, NE. The activities under the authority of Section
55 of Public Law 93-251, along the Platte River in NE are
to be executed in accordance with the guidance set forth
in A/ASA (CW) letter to Congresswoman Smith, dated 3 Oct.
1984, which is in accord with understandings reached by
Congresswoman Smith and OMB officials.

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Cont Imme contact mob with tex21 ml the tale of th
Dakota concerning need for tunds. Transter will be made
to USCS, if needed.

[blocks in formation]
[graphic]

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS:
DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING -

[blocks in formation]

25 Jan. 1985 09330

Allocate funds based on status of survey report. No funding, if Division Engineer notice not issued. During BERH review, fund to answer BERH questions; if BERH has acted favorably, fund unless no Federal interest has been determined or is expected to be determined.

Studies not funded Maumee Bay State Park, OH

[blocks in formation]

Reason

[blocks in formation]

Provide no funding based on
a lack of Federal interest.

No change. The solution to the New York metropolitan area
water supply problem is single purpose in nature. Such
solutions are a local responsibility.

FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES NEW CPLE

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][graphic]
[graphic]

FY 1985 ENERGY AND WATER DEVELOPMENT APPROPRIATION ACT AND REPORTS: DISPOSITION/STATUS OF ITEMS PROPOSED FOR FUNDING

(Dollar Amounts In Thousands)

[blocks in formation]

25 Jan. 1985 0933D

[blocks in formation]

To date no funds have been offered by the Commonwealth of Virginia.

[blocks in formation]

listing in the Conference report. 3/ Although Act authorizes and directs the work, funds are not included in Act language. Funds are included in the project by project