Page images
PDF
EPUB
[blocks in formation]

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS

Long Beach (CSMS) 13 miles

2. DATE

1 Jan 80

4. AREA CONSTR COST INDEX 1.07

ARNG

USAR

Ft MacArthur

[blocks in formation]

15 miles

[blocks in formation]

10 miles

[blocks in formation]

12 miles

[blocks in formation]

14 miles

[blocks in formation]

PROJECT TITLE

[blocks in formation]
[blocks in formation]

Facilities identified in Item 6 have been examined by the
State Reserve Forces Facilities Board for possible joint use/
expansion. The Board recommendations are to proceed as proposed herein.

9. LAND ACQUISITION REQUIRED

Site Selection Survey conducted 21 Jul 77 at LOSAL AFRC

10. PROJECTS PLANNED IN NEXT FOUR YEARS

[blocks in formation]

None (Number of Acres)

[blocks in formation]
[blocks in formation]

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

Measure

- 0

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

with

Rehabilitate/alter existing buildings to meet functional space requirements
of occupying units. Construct a new Arms Vault/ Printing Plant
concrete foundations and floors, poured and masonry walls and asphaltic
built-up roof. Air conditioning None
11. REQUIREMENT: 92,414

Adequate

Substandard 83,124 SF

a. PROJECT: Alters 83,124 SF of substandard space to fit and provides adequate storage and arms vault for USAR units at USAFRC.

D. REQUIREMENT: Required to provide assigned units with the minimum adequate functional areas required for the attainment and maintenance of individual/unit training and readiness standards. The existing USAR buildings_ on the AFRC require alteration and rehabilitation for units to be relocated to the AFRC from Fort MacArthur, Hazard Park, Los Angeles, and Bell, CA. The project also provides new construction of a USAR Printing Plant and arms vault. c. CURRENT SITUATION: The existing USARC portion of the AFRC consists of a total of 83,124 SF of permanent, semi-permanent and temporary WW II and later vintage buildings. There is insufficient admin, classroom, classroom support areas, admin area, unit storage, special training areas and is lacking arms storage. This project has been delayed due to the base realignment studies regarding Fort MacArthur and its impact on the LOSAL AFRC.

d. IMPACT IF NOT PROVIDED: If this project is not approved, the existing facilities would continue to be functionally inadequate for unit training administration and there would be insufficient functional space to accommodate all the Army Reserve units planned for relocation to the Los Alamitos as a result of the closure of Fort MacArthur by the end of FY 82. Closure and excessing would be delayed indefinitely if this project is not approved.

MAY

[blocks in formation]

4. PROJECT TITLE

5. PROJECT NUMBER

Alterations to Existing USAR Facilities and New Arms
Vault/Printing Plant

CA 368-03

SUPPLEMENTAL DATA

A.

3.

ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

110

($000)

-0(PEOPLE)

3885

(S000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

N/A

(S000)

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment

Nomenclature

Procuring
Appropriation

None

Fiscal Year
Appropriated
Or Requested

(month and year)

Cost ($000)

« PreviousContinue »