Investigation of Project Ranger: Hearings Before the Subcommittee on NASA Oversight of the Committee on Science and Astronautics, U. S. House of Representatives, Eighty-eighth Congress, Second Session ...Committee Serial No. 3. Hearing includes California Institute of Technology Jet Propulsion Laboratory reports "Ranger VI Failure Analysis and Supporting Investigations," March 27, 1964 (p. 247-457); "Ranger 5 Flight Report," Jan. 4, 1963 (p. 501-584); "Ranger Block III Project Development Plan," Oct. 31, 1963 (p. 669-777). |
From inside the book
Results 1-5 of 38
Page 84
... continued test operations through the flight of Ranger 9. The PTM has progressed through several revisions and will be continually modified as necessary through the block III program . The purpose of the PTM is to verify the spacecraft ...
... continued test operations through the flight of Ranger 9. The PTM has progressed through several revisions and will be continually modified as necessary through the block III program . The purpose of the PTM is to verify the spacecraft ...
Page 96
... continued to function normally on battery power and several hours of highly precise two - way doppler tracking data were obtained before the battery was exhausted . After that time , the DSIF sta- tions tracked the lunar capsule ...
... continued to function normally on battery power and several hours of highly precise two - way doppler tracking data were obtained before the battery was exhausted . After that time , the DSIF sta- tions tracked the lunar capsule ...
Page 99
... continued . A continuing documentation effort was pursued , especially in the area of standard and nonstandard proce- dures . A method of controlling changes to hardware and computer programs was instituted and specifications were ...
... continued . A continuing documentation effort was pursued , especially in the area of standard and nonstandard proce- dures . A method of controlling changes to hardware and computer programs was instituted and specifications were ...
Page 111
... continued with graduate studies at the University of Southern California , Los Angeles ( 1949-57 , on part - time basis ) . Mr. and Mrs. Nicks with their four children live at 7206 Denton Road , Bethesda , Md . Mr. KARTH . At this time ...
... continued with graduate studies at the University of Southern California , Los Angeles ( 1949-57 , on part - time basis ) . Mr. and Mrs. Nicks with their four children live at 7206 Denton Road , Bethesda , Md . Mr. KARTH . At this time ...
Page 121
... an acceptable component , the SCR is being carried in the design . Backup efforts based upon a relay or a transistor switch are being continued . ( b ) Recommendation : Clean up cabling to eliminate INVESTIGATION OF PROJECT RANGER 121.
... an acceptable component , the SCR is being carried in the design . Backup efforts based upon a relay or a transistor switch are being continued . ( b ) Recommendation : Clean up cabling to eliminate INVESTIGATION OF PROJECT RANGER 121.
Other editions - View all
Common terms and phrases
acceleration Accelerometer Agena analysis antenna approximately backup battery voltage booster Cal Tech cameras capacitor CC&S centers Chairman Channel 8 telemetry circuit clause command switch connector Contracting Officer Contractor CORTRIGHT cost cruise mode data encoder event failure Figure frequency G rms gamma ray Government GURNEY inadvertent turn-on indicated initiated input Jet Propulsion Laboratory KARTH KREUZER launch vehicle lunar malfunction measurements midcourse maneuver minutes mission monitor NASA NEWELL NICKS noise normal operation output performance period phase PICKERING Power Spectral Density project manager pulse Ranger Block Ranger program Ranger project records regulator relay reset result schedule SCHURMEIER sequence solar panel spacecraft subcontract sun acquisition tape Task Order technical Telemetry Data temperature terminal maneuver transmitter transponder turn-off TV Subsystem vibration voltage volts warmup WEBB Woomera
Popular passages
Page 623 - Payroll records will be maintained during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records will contain the name and address of each such employee, his correct classification, rate of pay, daily and weekly number of hours worked, deductions made and actual wages paid.
Page 617 - ... against the United States in the Court of Claims for the recovery of his reasonable and entire compensation for such use and manufacture.
Page 618 - Data now or hereafter covered by copyright and not originated in the performance of this contract, such license shall be only to the extent that the Contractor, its employees, or any individual or concern specifically employed or assigned by the Contractor to originate and prepare such Data under this contract, now has, or prior to completion or final settlement of this contract may acquire, the right to grant such license without becoming liable to pay compensation to others solely because of such...
Page 618 - The provisions of this clause shall be applicable only If the amount of this contract exceeds $10,000. (a) The Contractor shall report to the Contracting Officer, promptly and In reasonable written detail, each notice or claim of patent or copyright infringement based on the per50-091—71 12 formance of this contract of which the Contractor has knowledge.
Page 618 - Data" as used herein includes writings, sound recordings, pictorial reproductions, drawings or other graphical representations, and works of any similar nature (whether or not copyrighted) which are specified to be delivered under this contract. The term does not include financial reports, cost analyses and other information incidental to contract administration. (b) All Subject Data first produced in the performance of this contract shall be the sole property of the Government.
Page 623 - Payrolls and basic records relating thereto will be maintained during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records will contain the name and address of each such employee, his correct classification...
Page 618 - Instituted, on account of any alleged patent or copyright infringement arising out of the performance of this contract or out of the use of any supplies furnished or work or...
Page 49 - Organization and other specialized agencies and governmental and non-governmental organizations, such as the Committee on Space Research of the International Council of Scientific Unions...
Page 619 - Nothing contained in this clause shall imply a license to the Government under any patent or be construed as affecting the scope of any license or other right otherwise granted to the Government under any patent.
Page 628 - Stat. 41.) (b) In no event shall copies of this contract or of any plans, specifications, or other similar documents relating to work under this contract, if marked "Top Secret,