rules and regulations

This section of the FEDERAL REGISTER contains regulatory documents having gencral applicability and legal effect most of which aro keyed to and codified in the Code of Federal Regulations, which is published under 50 titles pursuant to 44 U.S.C. 1510.

The Code of Federal Regulations is sold by the Superintendent of Documents. Prices of new books are listed in the first FEDERAL REGISTER issue of each month.

Title 4-Accounts

CHAPTER I-GENERAL ACCOUNTING

OFFICE

SUBCHAPTER A-GENERAL PROCEDURES PART 20-BID PROTEST PROCEDURES

In deciding protests against procurement actions by agencies of the Federal Government, the General Accounting Office recognizes that the expeditious handling of bid protests is indispensable to the orderly process of Government procurement and to the protection of protesters and other parties. Detailed procedures providing for consideration of bld protests are necessary to insure equality of treatment for all parties. These bid protest procedures apply to both formally advertised and negotiated procurements and sales. They are intended to provide fair consideration of bid protests in a timely manner.

These procedures supersede the "Interim Bid Protest Procedures and Standards" promulgated on December 23, 1971, and effective as of February 7, 1972. The experience obtained under those procedures during the past 3 years provides the basis for the revisions made. These new procedures also reflect the requirements expected to be set forth in the regulations applicable to the various Federal contracting agencies. This approach is intended to provide a comprehensive regulatory scheme for processing bid protests.

Based on our experience with the Interim procedures, the requirement for a 5-day period for filing bid protests with the General Accounting Office should be changed. We are now establishing a 10day period. Our experience also indicates that the requirement for issuing decisions within 20 days of receipt of all necessary information should be replaced and we are substituting a goal of 25 days.

Other changes include clarification of provisions dealing with bid protest conferences and the effect of judicial proceedings and the addition of a provision applicable to requests for reconsideration

of bid protest decisions.

The procedures apply to bid protests received by the General Accounting Office on or after June 2, 1975.

Part 20, including the part heading, is

revised as follows:

[blocks in formation]
[blocks in formation]

(a) All "days" referred to in this part are deemed to be "working days" of the Federal Government. The term "file" or "submit" in all sections except § 20.2 and § 20.9(b) refers to the date of transmission.

(b) "Adverse agency action" is any action or inaction on the part of a contracting agency which is prejudicial to the position taken in a protest filed with an agency. It may include but is not limited to: a decision on the merits of the protest; a procurement action such as the award of a contract or the rejection of a bid despite the pendency of a protest; or contracting agency acquiescence in and active support of continued and substantial contract performance. § 20.1 Filing of protest.

(a) An interested party may protest to the General Accounting Office the award or the proposed award of a formally advertised or negotiated contract of procurement or sale by or for an agency of the Federal Government whose accounts are subject to settlement by the General Accounting Office.

(b) Such protests must be in writing General Accounting Once, Washington, and addressed to the General Counsel, D.C. 20548. To expedite handling within the General Accounting Office, the address should include "Attn: Bid Protest Control Unit."

(c) The initial protest filed with the General Accounting Office shall (1) include the name and address of the protester, (2) identify the contracting activity and the number of the solicitation

of the grounds of protest, and (4) specifiand/or contract, (3) contain a statement cally request a ruling by the Comptroller be filed concurrently with the contracting General. A copy of the protest shall also officer and the communication to the General Accounting Office should so indicate. The grounds for protest filed with the General Accounting Office must be fully supported to the extent feasible. See 20.2(d) with respect to time for filing any additional statement required in support of an initial protest.

(d) No formal briefs or other technical forms of pleading or motion are re

quired, but a protest and other submissions should be concise, logically arranged, and direct.

§ 20.2 Time for filing.

(a) Protesters are urged to seek resolution of their complaints initially with the contracting agency. If a protest has been filed initially with the contracting agency, any subsequent protest to the General Accounting Office filed within 10 days of formal notification of or actual or constructive knowledge of initial adverse agency action will be considered provided the initial protest to the agency was filed in accordance with the time limits prescribed in paragraph (b) of this section, unless the contracting agency imposes a more stringent time for filing, in which case the agency's time for filing will control. In any case, a protest will be considered if filed with the General Accounting Office within the time limits prescribed in paragraph (b).

(b) (1) Protests based upon alleged improprieties in any type of solicitation which are apparent prior to bid opening or the closing date for receipt of initial proposals shall be filed prior to bid opening or the closing date for receipt of initial proposals. In the case of negotiated procurements, alleged improprieties which do not exist in the initial solicitation but which are subsequently incorporated therein must be protested not later than the next closing date for receipt of proposals following the incorporation.

(2) In cases other than those covered in paragraph 1, bid protests shall be filed not later than 10 days after the basis for protest is known or should have been known, whichever is earlier.

(3) The term "filed" as used in this section means receipt in the contracting agency or in the General Accounting Office as the case may be. Protesters are cautioned that protests should be transmitted or delivered in the manner which will assure earliest receipt. Except as provided in paragraph (c) of this section, any protest received in the General Accounting Office after the time limits prescribed in this subsection shall not be tered or certified mail not later than the considered unless it was sent by regisfifth day, or by mailgram not later than the third day, prior to the final date for filing a protest as specifled herein. The only acceptable evidence to establish the date of mailing shall be the U.S. Postal Service postmark on the wrapper or on the original receipt from the U.S. Postal Service. The only acceptable evidence to establish the date of transmission by mailgram shall be the automatic date indication appearing on the mailgram.

Tf the postmark in the case of mail or the automatic date indication in the case of a mailgram is illegible, the protest shall be deemed to have been filed late.

(c) The Comptroller General, for good cause shown, or where he determines that a protest raises issues significant to procurement practices or procedures, may consider any protests which is not filed timely.

(d) If an additional statement in support of the initial protest is required by the General Accounting Office, one copy shall be mailed or otherwise furnished to the General Counsel, General Accounting Office, and a copy shall be mailed or otherwise furnished to the contracting officer, not later than 5 days after receipt of notification from the General Accounting Office of the need for such additional statement.

$20.3 Notice of protest, submission of

agency report and time for filing of comments on report.

(a) The General Accounting Office shall notify the contracting agency by telephone and in writing within one day of the receipt of a protest, requesting the agency to give notice of the protest to the contractor if award has been made cr, if no award has been made, to all bidders or proposers who appear to have a substantial and reasonable prospect of receiving an award if the protest is denied. The agency shall be requested to furnish in accordance with applicable procurement regulations copies of the protest documents to such parties with instructions to communicate further directly with the General Accounting

Office.

(b) Material submitted by a protestor will not be withheld from any interested party outside the Government or from any Government agency which may be involved in the protest except to the extent that the withholding of information is permitted or required by law or regulation. If the protester considers that the protest contains material which should be withheld, a statement advising of this fact must be affixed to the front page of the protests document and the allegedly proprietary information must be SO identified wherever it appears.

(c) The Office of General Counsel shall request the agency to submit a complete report on the protest to the General Accounting Office as expeditiously as possible (generally within 25 working days) in accordance with applicable procurement regulations, and to furnish a copy of the report to the protester and other interested parties.

(d) Comments on the agency report shall be filed with the Office of General Counsel within 10 days after receipt of the report, with a copy to the agency ofice which furnished the report and to other interested parties. Any rebuttal a protester or interested partics may care to make shall be filed with the Office

of General Counsel, General Accounting Oface, within 5 days after receipt of the comments to which rebuttal is directed, with a copy to the agency office which furnished the report, the protester, and

RULES AND REGULATIONS

interested parties, as the case may be. Unsolicited agency rebuttals shall be considered if filed within 5 days after receipt by the Agency of the cominents to which rebuttal is directed.

(e) The failure of a protester or any interested party to comply with the time limits stated in this section may result in resoluion of the protest without consideration of the comments untimely filed.

§ 20. Withholding of award.

When a protest has been filed before award the agency will not make an award prior to resolution of the protest except as provided in the applicable procurement regulations. In the event the agency determines that award is to be made during the pendency of a protest, the agency will notify the Comptroller

General.

[blocks in formation]

The Office of General Counsel, General Accounting Office, shall, upon request, make available to any interested party information bearing on the substance of the protest which has been submitted by interested parties or agencies, except to the extent that withholding of information is permitted or required by law or regulation. Any comments thereon shall be submitted within a maximum of 10 days.

§ 20.6 Time for submission of additional information.

Any additional information requested by the Office of General Counsel, General Accounting Office, from the protestor or interested parties shall be submitted no later than 5 days after the receipt of such request. If it is necessary to obtain additional information from the agency, the General Accounting Office will request that such information be furnished as expeditiously as possible. $ 20.7

Conference.

(a) A conference on the merits of the protest with members of the Office of General Counsel, General Accounting Office, may be held at the request of the protester, any other interested party, or an agency official. Request for a conference should be made prior to the expiration of the time period allowed for filing comments on the agency report (see § 20.3(d)). Except in unusual circumstances. requests for a conference received after such time will not be honored.

(b) Conferences normally will be held prior to expiration of the period allowed for filing comments on the agency report. All interested parties shall be invited to attend the conference. Ordinarily, only one conference will be held on a bid protest.

(c) Any written comments to be submitted and as deemed appropriate by the General Accounting Office as a result of the conference must be received in the General Accounting Office within 5 days of the date on which the conference wa held.

§ 20.8

Time for decision by Comptroller General,

The Comptroller General establishes a goal of 25 days for issuing a decision on a protest after receipt of all informa. tion submitted by all parties and the conclusion of any conference.

$ 20.9 Request for reconsideration.

(a) Reconsideration of a decision of the Comptroller General may be requested by the protester, any interested party who submitted comments during consideration of the protest, and any agency involved in the protest. The request for reconsideration shall contain a detailed statement of the factual and legal grounds upon which reversal or ifying any errors of law made or inmodification is deemed warranted, specformation not previously considered.

(b) Request for reconsideration of a decision of the Comptroller General shall be filed not later than 10 days after the basis for reconsideration is known or should have been known, whichever is earlier. The term “filed” as used in this section means receipt in the General Accounting Office.

(c) A request for reconsideration shall be subject to these bid protest procedures consistent with the need for prompt resolution of the matter. § 20.10 Effect of judicial proceedings.

The Comptroller General may refuse to decide any protest where the matter involved is the subject of litigation before a court of competent jurisdiction or has been decided on the merits by such a court. The foregoing shall not apply where the court requests, expects, or otherwise expresses interest in the Comptroller General's decision. (SEAL]

ELMER B. STAATS,
Comptroller General
of the United States.
[FR Doc.75-10702 Filed 4-23-75;8:45 am]

105.1

STANDARD FORM 23-A

OCT. 1969 EDITION

GENERAL SERVICES ADMINISTRATION

FED. PROC. REG. (41 CFR) 1–16.401 23-205

GENERAL PROVISIONS

(Construction Contract)

EXHIBIT 31

1. DEFINITIONS

(a) The term "head of the agency" or "Secretary" as used herein means the Secretary, the Under Secretary, any Assistant Secretary, or any other head or assistant head of the executive or military department or other Federal agency; and the term "his duly authorized representative" means any person or persons or board (other than the Contracting Officer) authorized to act for the head of the agency or the Secretary.

(b) The term "Contracting Officer" as used herein means the person executing this contract on behalf of the Government and includes a duly appointed successor or authorized representative.

2. SPECIFICATIONS AND DRAWINGS

The Contractor shall keep on the work a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy either in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at his own risk and expense. The Contracting Officer shall furnish from time to time such detail drawings and other information as he may consider necessary, unless otherwise provided.

3. CHANGES

(a) The Contracting Officer may, at any time, without notice to the sureties, by written order designated or indicated to be a change order, make any change in the work within the general scope of the contract, including but not limited to changes:

(i) In the specifications (including drawings and designs); (ii) In the method or manner of performance of the work; (iii) In the Government-furnished facilities, equipment, materials, services, or site; or

(iv) Directing acceleration in the performance of the work. (b) Any other written order or an oral order (which terms as used in this paragraph (b) shall include direction, instruction, interpretation, or determination) from the Contracting Officer, which causes any such change, shall be treated as a change order under this clause, provided that the Contractor gives the Contracting Officer written notice stating the date, circumstances, and source of the order and that the Contractor regards the order as a change order.

(c) Except as herein provided, no order, statement, or conduct of the Contracting Officer shall be treated as a change under this clause or entitle the Contractor to an equitable adjustment hereunder.

(d) If any change under this clause causes an increase or decrease in the Contractor's cost of, or the time required for, the performance of any part of the work under this contract, whether or not changed by any order, an equitable adjustment shall be made and the contract modified in writing accordingly: Provided, however, That except for claims based on defective specifications, no claim for any change under (b) above shall be allowed for any costs incurred more than 20 days before the Contractor gives written notice as therein required: And provided further, That in the case of defective specifications for which the Government is responsible, the equitable adjustment, shall include any increased cost reasonably incurred by the Contractor in attempting to comply with such defective specifications.

(e) If the Contractor intends to assert a claim for an equitable adjustment under this clause, he must, within 30 days after receipt of a written change order under (a) above or the furnishing of a written notice under (b) above, submit to the Contracting Officer a written statement setting forth the general nature and monetary extent of such claim,

unless this period is extended by the Government. The statement of claim hereunder may be included in the notice under (b) above.

(f) No claim by the Contractor for an equitable adjustment hereunder shall be allowed if asserted after final payment under this contract.

4. DIFFERING SITE CONDITIONS

(a) The Contractor shall promptly, and before such conditions are disturbed, notify the Contracting Officer in writing of: (1) Subsurface or latent physical conditions at the site differing materially from those indicated in this contract, or (2) unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in this contract. The Contracting Officer shall promptly investigate the conditions, and if he finds that such conditions do materially so differ and cause an increase or decrease in the Contractor's cost of, or the time required for, performance of any part of the work under this contract, whether or not changed as a result of such conditions, an equitable adjustment shall be made and the contract modified in writing accordingly.

(b) No claim of the Contractor under this clause shall be allowed unless the Contractor has given the notice required in (a) above; provided, however, the time prescribed therefor may be extended by the Government.

(c) No claim by the Contractor for an equitable adjustment hereunder shall be allowed if asserted after final payment under this contract.

5. TERMINATION FOR DEFAULT-DAMAGES FOR DELAY-TIME EXTENSIONS

(a) If the Contractor refuses or fails to prosecute the work, or any separable part thereof, with such diligence as will insure its completion within the time specified in this contract, or any extension thereof, or fails to complete said work within such time, the Government may, by written notice to the Contractor, terminate his right to proceed with the work or such part of the work as to which there has been delay. In such event the Government may take over the work and prosecute the same to completion, by contract or otherwise, and may take possession of and utilize in completing the work such materials, appliances, and plant as may be on the site of the work and necessary therefor. Whether or not the Contractor's right to proceed with the work is terminated, he and his sureties shall be liable for any damage to the Govern ment resulting from his refusal or failure to complete the work within the specified time.

(b) If fixed and agreed liquidated damages are provided in the contract and if the Government so terminates the Contractor's right to proceed, the resulting damage will consist of such liquidated damages until such reasonable time as may be required for final completion of the work together with any increased costs occasioned the Government in completing the work.

(c) If fixed and agreed liquidated damages are provided in the contract and if the Government does not so terminate the Contractor's right to proceed, the resulting damage will consist of such liquidated damages until the work is completed or accepted.

(d) The Contractor's right to proceed shall not be so terminated nor the Contractor charged with resulting damage if:

(1) The delay in the completion of the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to, acts of God, acts of the public enemy, acts of the Government in either its sovereign or contractual capacity, acts of another contractor in the performance of a contract with the Government, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, unusually severe weather, or delays of subcontractors or suppliers arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and

such subcontractors or suppliers; and

(2) The Contractor, within 10 days from the beginning of any such delay (unless the Contracting Officer grants a further period of time before the date of final payment under the contract), notifies the Contracting Officer in writing of the causes of delay.

The Contracting Officer shall ascertain the facts and the extent of the delay and extend the time for completing the work when, in his judgment, the findings of fact justify such an extension, and his findings of fact shall be final and conclusive on the parties, subject only to appeal as provided in Clause 6 of these General Provisions.

(e) If, after notice of termination of the Contractor's right to proceed under the provisions of this clause, it is determined for any reason that the Contractor was not in default under the provisions of this clause, or that the delay was excusable under the provisions of this clause, the rights and obligations of the parties shall, if the contract contains a clause providing for termination for convenience of the Government, be the same as if the notice of termination had been issued pursuant to such clause. If, in the foregoing circumstances, this contract does not contain a clause providing for termination for convenience of the Government, the contract shall be equitably adjusted to compensate for such termination and the contract modified accordingly; failure to agree to any such adjustment shall be a dispute concerning a question of fact within the meaning of the clause of this contract entitled "Disputes."

(f) The rights and remedies of the Government provided in this clause are in addition to any other rights and remedies provided by law or under this contract.

(g) As used in Paragraph (d)(1) of this clause, the term "subcontractors or suppliers" means subcontractors or suppliers at any tier.

6. DISPUTES

(a) Except as otherwise provided in this contract, any dispute concerning a question of fact arising under this contract which is not disposed of by agreement shall be decided by the Contracting Officer, who shall reduce his decision to writing and mail or otherwise furnish a copy thereof to the Contractor. The decision of the Contracting Officer shall be final and conclusive unless, within 30 days from the date of receipt of such copy, the Contractor mails or otherwise furnishes to the Contracting Officer a written appeal addressed to the head of the agency involved. The decision of the head of the agency or his duly authorized representative for the determination of such appeals shall be final and conclusive. This provision shall not be pleaded in any suit involving a question of fact arising under this contract as limiting judicial review of any such decision to cases where fraud by such official or his representative or board is alleged: Provided, however, That any such decision shall be final and conclusive unless the same is fraudulent or capricious or arbitrary or so grossly erroneous as necessarily to imply bad faith or is not supported by substantial evidence. In connection with any appeal proceeding under this clause, the Contractor shall be afforded an opportunity to be heard and to offer evidence in support of his appeal. Pending final decision of a dispute hereunder, the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision.

(b) This Disputes clause does not preclude consideration of questions of law in connection with decisions provided for in paragraph (a) above. Nothing in this contract, however, shall be construed as making final the decision of any administrative official, representative, or board on a question of law. 7. PAYMENTS TO CONTRACTOR

(a) The Government will pay the contract price as hereinafter provided.

(b) The Government will make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates approved by the Contracting Officer. If requested by the Contracting Officer, the Contractor shall furnish a breakdown of the total contract price showing the amount included therein for each principal category of the work, in such detail as requested, to provide a basis for determining progress payments. In the preparation of estimates the Contracting Officer, at his discretion, may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site may also be taken into consideration (1) if such consideration

STANDARD FORM 23-A OCTOBER 1969 EDITION

is specifically authorized by the contract and (2) if the Contractor furnishes satisfactory evidence that he has acquired title to such material and that it will be utilized on the work covered by this contract.

(c) In making such progress payments, there shall be retained 10 percent of the estimated amount until final completion and acceptance of the contract work. However, if the Contracting Officer, at any time after 50 percent of the work has been completed, finds that satisfactory progress is being made, he may authorize any of the remaining progress payments to be made in full. Also, whenever the work is substantially complete, the Contracting Officer, if he considers the amount retained to be in excess of the amount adequate for the protection of the Government, at his discretion, may release to the Contractor all or a portion of such excess amount. Furthermore, on completion and acceptance of each separate building, public work, or other division of the contract, on which the price is stated separately in the contract, payment may be made therefor without retention of a percentage.

(d) All material and work covered by progress payments made shall thereupon become the sole property of the Government, but this provision shall not be construed as relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work, or as waiving the right of the Government to require the fulfillment of all of the terms of the contract.

(e) Upon completion and acceptance of all work, the amount due the Contractor under this contract shall be paid upon the presentation of a properly executed voucher and after the Contractor shall have furnished the Government with a

release, if required, of all claims against the Government arising by virtue of this contract, other than claims in stated amounts as may be specifically excepted by the Contractor from the operation of the release. If the Contractor's claim to amounts payable under the contract has been assigned under the Assignment of Claims Act of 1940, as amended (31 U.S.C. 203, 41 U.S.C. 15), a release may also be required of the assignee.

8. ASSIGNMENT OF CLAIMS

(a) Pursuant to the provisions of the Assignment of Claims Act of 1940, as amended (31 U.S.C. 203, 41 U.S.C. 15), if this contract provides for payments aggregating $1,000 or more, claims for moneys due or to become due the Contractor from the Government under this contract may be assigned to a bank, trust company, or other financing institution, including any Federal lending agency, and may thereafter be further assigned and reassigned to any such institution. Any such assignment or reassignment shall cover all amounts payable under this contract and not already paid, and shall not be made to more than one party, except that any such assignment or reassignment may be made to one party as agent or trustee for two or more parties participating in such financing. Unless otherwise provided in this contract, payments to an assignee of any moneys due or to become due under this contract shall not, to the extent provided in said Act, as amended, be subject to reduction or setoff. (The preceding sentence applies only if this contract is made in time of war or national emergency as defined in said Act; and is with the Department of Defense, the General Services Administration, the Atomic Energy Commission, the National Aeronautics and Space Administration, the Federal Aviation Agency, or any other department or agency of the United States designated by the President pursuant to Clause 4 of the proviso of section 1 of the Assignment of Claims Act of 1940, as amended by the Act of May 15, 1951, 65 Stat. 41.)

(b) In no event shall copies of this contract or of any plans, specifications, or other similar documents relating to work under this contract, if marked "Top Secret," "Secret," or "Confidential," be furnished to any assignee of any claim arising under this contract or to any other person not entitled to receive the same. However, a copy of any part or all of this contract so marked may be furnished, or any information contained therein may be disclosed, to such assignee upon the prior written authorization of the Contracting Officer.

9. MATERIAL AND WORKMANSHIP

(a) Unless otherwise specifically provided in this contract, all equipment, material, and articles incorporated in the work covered by this contract are to be new and of the most

107

suitable grade for the purpose intended. Unless otherwise specifically provided in this contract, reference to any equipment, material, article, or patented process, by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition, and the Contractor may, at his option, use any equipment, material, article, or process which, in the judgment of the Contracting Officer, is equal to that named. The Contractor shall furnish to the Contracting Officer for his approval the name of the manufacturer, the model number, and other identifying data and information respecting the performance, capacity, nature, and rating of the machinery and mechanical and other equipment which the Contractor contemplates incorporating in the work. When required by this contract or when called for by the Contracting Officer, the Contractor shall furnish the Contracting Officer for approval full information concerning the material or articles which he contemplates incorporating in the work. When so directed, samples shall be submitted for approval at the Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material, and articles installed or used without required approval shall be at the risk of subsequent rejection.

(b) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may, in writing, require the Contractor to remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

10. INSPECTION AND ACCEPTANCE

(a) Except as otherwise provided in this contract, inspection and test by the Government of material and workmanship required by this contract shall be made at reasonable times and at the site of the work, unless the Contracting Officer determines that such inspection or test of material which is to be incorporated in the work shall be made at the place of production, manufacture, or shipment of such material. To the extent specified by the Contracting Officer at the time of determining to make off-site inspection or test, such inspection or test shall be conclusive as to whether the material involved conforms to the contract requirements. Such off-site inspection or test shall not relieve the Contractor of responsibility for damage to or loss of the material prior to acceptance, nor in any way affect the continuing rights of the Government after acceptance of the completed work under the terms of paragraph (f) of this clause, except as hereinabove provided.

(b) The Contractor shall, without charge, replace any material or correct any workmanship found by the Government not to conform to the contract requirements, unless in the public interest the Government consents to accept such material or workmanship with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(c) If the Contractor does not promptly replace rejected material or correct rejected workmanship, the Government (1) may, by contract or otherwise, replace such material or correct such workmanship and charge the cost thereof to the Contractor, or (2) may terminate the Contractor's right to proceed in accordance with Clause 5 of these General Provisions.

(d) The Contractor shall furnish promptly, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspection and test as may be required by the Contracting Officer. All inspection and test by the Government shall be performed in such manner as not unnecessarily to delay the work. Special, full size, and performance tests shall be performed as described in this contract. The Contractor shall be charged with any additional cost of inspection when material and workmanship are not ready at the time specified by the Contractor for its inspection.

(e) Should it be considered necessary or advisable by the Government at any time before acceptance of the entire work to make an examination of work already completed, by removing or tearing out same, the Contractor shall, on request, promptly furnish all necessary facilities, labor, and material. If such work is found to be defective or nonconforming in any material respect, due to the fault of the Contractor or his subcontractors, he shall defray all the expenses of such examination and of satisfactory reconstruction. If, however, such work if found to meet the requirements of the contract, an equitable adjustment shall be made in the contract price to compensate the Contractor for the additional services in

STANDARD FORM 23-A OCTOBER 1969 EDITION

volved in such examination and reconstruction and, if completion of the work has been delayed thereby, he shall, in addition, be granted a suitable extension of time.

(f) Unless otherwise provided in this contract, acceptance by the Government shall be made as promptly as practicable after completion and inspection of all work required by this contract. Acceptance shall be final and conclusive except as regards latent defects, fraud, or such gross mistakes as may amount to fraud, or as regards the Government's rights under any warranty or guarantee.

11. SUPERINTENDENCE BY CONTRACTOR

The Contractor shall give his personal superintendence to the work or have a competent foreman or superintendent, satisfactory to the Contracting Officer, on the work at all times during progress, with authority to act for him. 12. PERMITS AND RESPONSIBILITIES

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State, and municipal laws, codes, and regulations, in connection with the prosecution of the work. He shall be similarly responsible for all damages to persons or property that occur as a result of his fault or negligence. He shall take proper safety and health precautions to protect the work, the workers, the public, and the property of others. He shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire construction work, except for any completed unit of construction thereof which theretofore may have been accepted.

13. CONDITIONS AFFECTING THE WORK

The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Any failure by the Contractor to do so will not relieve him from responsibility for successfully performing the work without additional expense to the Government. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of this contract, unless such understanding or representations by the Government are expressly stated in the contract.

14. OTHER CONTRACTS

The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees and carefully fit his own work to such additional work as may be directed by the Contracting Officer. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by Government employees.

15. PATENT INDEMNITY

Except as otherwise provided, the Contractor agrees to indemnify the Government and its officers, agents, and employees against liability, including costs and expenses, for infringement upon any Letters Patent of the United States (except Letters Patent issued upon an application which is now or may hereafter be, for reasons of national security, ordered by the Government to be kept secret or otherwise withheld from issue) arising out of the performance of this contract or out of the use or disposal by or for the account of the Government of supplies furnished or construction work performed hereunder.

16. ADDITIONAL BOND SECURITY

If any surety upon any bond furnished in connection with this contract becomes unacceptable to the Government, or if any such surety fails to furnish reports as to his financial condition from time to time as requested by the Government, the Contractor shall promptly furnish such additional security as may be required from time to time to protect the interests of the Government and of persons supplying labor or materials in the prosecution of the work contemplated by this contract.

17. COVENANT AGAINST CONTINGENT FEES

The Contractor warrants that no person or selling agency has been employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting bona fide