Justification of the budget estimates, active forces and defense agenciesU.S. Government Printing Office, 1979 - United States |
From inside the book
Results 1-5 of 100
Page 4
... Treatment Redstone Arsenal Barracks Complex Radar Operation Facility Add Secondary Waste Treatment Security Fence and Lighting Control Tower and Non - directional Beacon Shelter Fort Rucker Electronic Equipment Maintenance Facility ...
... Treatment Redstone Arsenal Barracks Complex Radar Operation Facility Add Secondary Waste Treatment Security Fence and Lighting Control Tower and Non - directional Beacon Shelter Fort Rucker Electronic Equipment Maintenance Facility ...
Page 5
... Treatment 4.050 AIR FORCE Elmendorf AFB 13.400 Add to and Alter Fire Station 1.300 Alter Unaccompanied Enlisted Personnel Housing 3.500 Add to and Alter Regional Opera- tions Control Center 8.600 ARIZONA 15.410 ARMY Fort Huachuca 1.300 ...
... Treatment 4.050 AIR FORCE Elmendorf AFB 13.400 Add to and Alter Fire Station 1.300 Alter Unaccompanied Enlisted Personnel Housing 3.500 Add to and Alter Regional Opera- tions Control Center 8.600 ARIZONA 15.410 ARMY Fort Huachuca 1.300 ...
Page 8
... Treatment 4.350 4.350 Naval Weapons Station , Concord 3.950 Unaccompanied Enlisted Personnel Housing and Dining Facility 3.950 Naval Amphibious Base , Coronado 1.600 Air Emission Control 1.600 Naval Air Station , Lemoore 6.500 Lighting ...
... Treatment 4.350 4.350 Naval Weapons Station , Concord 3.950 Unaccompanied Enlisted Personnel Housing and Dining Facility 3.950 Naval Amphibious Base , Coronado 1.600 Air Emission Control 1.600 Naval Air Station , Lemoore 6.500 Lighting ...
Page 14
... Treatment Navy Fuel Depot , Jacksonville Oil Spill Prevention Naval Air Station , Pensacola Oil Spill Prevention Naval Air Rework Facility , Pensacola Egress Improvements Naval Air Station , Whiting Field Sanitary Sewage Collection and ...
... Treatment Navy Fuel Depot , Jacksonville Oil Spill Prevention Naval Air Station , Pensacola Oil Spill Prevention Naval Air Rework Facility , Pensacola Egress Improvements Naval Air Station , Whiting Field Sanitary Sewage Collection and ...
Page 19
... Treatment .330 Industrial Waste Treatment Medium Caliber Loading Plant .720 Fort Benjamin Harrison 4.450 Insulate Controls 1.650 Emission Control - Boiler Plant 2.800 Indiana AAP 11.500 Miscellaneous Pollution Abatement Facilities 1.010 ...
... Treatment .330 Industrial Waste Treatment Medium Caliber Loading Plant .720 Fort Benjamin Harrison 4.450 Insulate Controls 1.650 Emission Control - Boiler Plant 2.800 Indiana AAP 11.500 Miscellaneous Pollution Abatement Facilities 1.010 ...
Other editions - View all
Common terms and phrases
1390 SUPPLEMENTAL DATA 19 80 MILITARY 1980 MILITARY CONSTRUCTION ADDITIONAL PERSONNEL NECESSARY Air Pollution APPROPRIATED OR REQUESTED AUTHORIZATION REQUESTED Barracks Building CATEGORY CODE COMMAND COMPONENT ARMY FY CONSTRUCTION PROJECT DATA COST ESTIMATES ITEM COST OF BACKLOG COST TO OPERATE DATE 30 Jan DATE FY DESCRIPTION OF PROPOSED Design Completed DESIGN STATUS ESTIMATED Energy Conservation EQUIPMENT ASSOCIATED ESTIMATED ANNUAL COST ESTIMATED LIFE-CYCLE COST EXISTING FACILITY FORM 1390 SUPPLEMENTAL FY 1980 MILITARY INCLUDED IN FOLLOWING Inspection & Overhead INSTALLATION AND LOCATION INSTALLATION/LOCATION KINGS BAY MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT NATO NUMBER OF ADDITIONAL OFFICER ENLISTED CIVILIAN OPERATE AND MAINTAIN OPERATE THE PROPOSED Pollution Abatement PREVIOUS EDITIONS PROGRAM ELEMENT PROJECT COST PROJECT DATA ARMY PROJECT NUMBER PROJECT TITLE PROPOSED FACILITY PROVIDED QUANTITY UNIT COST Real Property Categories REMAINING DEFICIENCY SIMILAR UNUSED SPACE storage SUPPLEMENTAL DATA FY Total Contract Cost Total Request Rounded UNIT COST COST Water Pollution
Popular passages
Page 997 - SF 3,300 10. Mission or Major Functions; Maintain and operate facilities and provide services and material to support operations of a Marine Aircraft wing, or units thereof, and other activities and units as designated by the Commandant of the Marine Corps in coordination with the Chief of Naval Operations.
Page 182 - SEC. 301. The Secretary of the Air Force may establish or develop military Installations and facilities by acquiring, constructing, converting, rehabilitating. or Installing permanent or temporary public works, Including site preparation, appurtenances, utilities, and equipment, for the following projects : INSIDE THE UNITED STATES AIR DEFENSE COMMAND Ent Air Force Base, Colorado Springs, Colorado : Operational facilities, maintenance facilities, and troop housing, $1,767,000.
Page 212 - For acquisition, construction, installation, and equipment of temporary or permanent public works, military installations, facilities, and real property for the Army as currently authorized by law...
Page 168 - Force may establish or develop classified military installations and facilities by acquiring, constructing, converting, rehabilitating, or installing permanent or temporary public works, including land acquisition, site preparation, appurtenances, utilities, and equipment in the total amount of $317,263,000.
Page 166 - Budget advises that, from the standpoint of the administration's program, there is no objection to the presentation of this proposal for the consideration of the Congress. The Department of the...
Page 842 - Boiler Plant Modifications The majority of the central steam plants for heating and process load requirements were designed and built prior to or during World War II and do not meet modern efficiency standards for energy conservation. Significant quantities of energy can be saved through improvement of boiler controls, plant modifications including boiler water treatment and economizers, and installation of small local boilers to eliminate deteriorated steam lines.
Page 442 - D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT _ ($000) E.
Page 213 - ENVIRONMENTAL PROTECTION: In accordance with Section 102 (2) (c) of the National Environmental Policy Act of 1969 (PL 91-190), the environmental impact analysis process has been completed or is actively underway for all projects in the Military Construction Program.
Page 1712 - Military Construction, Defense Agencies (Including Transfer of Funds) For acquisition construction, installation, and equipment of temporary or permanent public works, installations, facilities, and real property for activities and agencies of the Department of Defense (other than the military departments), as currently authorized by law, ($302,198,000) $309,600,000, to remain available until September 30, (1989) 1990.
Page 1012 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE. PROPOSED FACILITY B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY C.