10 DESCRIPTION OF PROPOSED CONSTRUCTION Construction of a permanent, non-combustible building with masonry dividing partitions, humidity controls, fire protection system, communications, required utilities, paving, storm drainage, and site improvements. Heating from an existing plant in adjacent building. Not sited on a flood plain. Air Conditioning 5 tons. 11. REQUIREMENT: 5,723 SF Adequate: None Substandard: 1,930 SF PROJECT: This project will provide a secure facility for the storage and repair of small arms and range target mechanisms. REQUIREMENT: An adequate, easily secured facility is required in which to efficiently and economically store and repair small arms for troop units undergoing training or being equipped for deployment. Provision for the installation of an intrusion detection system using FY 80 OMA funds is required. The normal average storage of rifles, pistols, machine guns, rocket launchers and mortars is 1,700 items at any one time. Storage space is also required for electro-mechanical range target mechanisms. CURRENT SITUATION: Small arms storage and repair activities are poorly accommodated in portions of two World War II temporary wooden buildings built for other purposes. Extremely crowded conditions exist with items stored on top of one another. Target mechanisms, maintained by the activity, are inadequately stored in buildings on the ranges. Dust infiltration, lack of humidity control and wide dispersion of present facilities contribute to inefficient management and control. Security for the weapons storage and repair areas is provided at all times, except normal duty hours by six Military Police guards whose services will not be required after provision of this project with an intrusion detection system.

MAY

[blocks in formation]

11. REQUIREMENT (Continued)

IMPACT IF NOT PROVIDED: Existing inadequate and dispersed facilities, not complying with current security requirements will continue in use with adverse impact in the installation's training and equipment supply mission.

DD1391c

PREVIOUS EDITIONS MAY BE USED INTERNALLY

122

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

19

($000)

0

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

($000)

[merged small][ocr errors]

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT....

[blocks in formation]

F.

Design Completed....

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

Mar 77

100 %

100 %

Aug 79

[blocks in formation]

MAY

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

MAY

ARMY COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1980 MILITARY CONSTRUCTION PROGRAM

(DOLLARS IN THOUSANDS)

Camp Perry, OH
INSTALLATION/LOCATION

30 Jan 1979

TRADOC
COMMAND

A. ESTIMATED COST OF BACKLOG OF REAL PROPERTY MAINTENANCE (BMAR):*

[blocks in formation]