25. TOTAL COST, LAND, BUILDINGS, AND OTHER STRUCTURES AND FACILITIES 26. REMARKS (Use reverse il mere space is required) $1,000. 178,010. (E) 25. TOTAL COST, LAND, BUILDINGS, AND OTHER STRUCTURES AND FACILITIES. 24. REMARKS (Use reverse II more space is required) 16,390.(E) 6. REVISION 30. DATE 9/16/59 GSA FORM 1166 MAY 1958 25. TOTAL COST, LAND, BUILDINGS, AND OTHER STRUCTURES AND FACILITIES. 26. REMARKS (Use reverse 1 more space le required) 78 11,000. (E) |