awarded to a contractor that does not meet these standards;

previously

(10) Volume of work awarded to the firm by the Agency, with the object of effecting an equitable distribution of architect-engineer contracts among qualified firms. Each architect-engineer evaluation board shall give favorable consideration, to the fullest extent practicable to the most highly qualified firms that have not had prior experience on Government projects (including small business firms and firms owned by the socially and/or economically deprived).

(c) The evaluation board shall prepare a selection memorandum for the approval of the head of the contracting activity. The selection memorandum will be signed by the board chairman and cleared by each board member. The selection memorandum shall include the following information:

(1) A listing by name of all firms reviewed by the board;

(2) A listing of the evaluation criteria applied;

(3) An analysis of the selection showing the rationale for the board's recommendation;

(4) The board's recommendation of the three most highly qualified firms, in order of preference;

(5) An independent Government cost estimate. The evaluation board shall require the project engineer to develop an independent Government estimate of the cost of the required architect-engineer services. Consideration shall be given to the estimated value of the services to be rendered, the scope, complexity, and the nature of the project and the estimated costs expected to be generated by the work. The independent Government estimate shall be revised as required during negotiations to correct noted deficiencies and reflect changes in or clarification of, the scope of the work to be performed by the architect-engineer. A cost estimate based on the application of percentage factors to cost estimates of the various segments of the work involved, e.g.,

construction project, may be developed for comparison purposes, but such a cost estimate shall not be used as a substitute for the independent Government estimate.

736.602-4 Selection authority.

(a) The head of the contracting activity or his/her authorized designee shall review the selection memorandum and shall either approve it or return it to the board for reconsideration for specified reasons.

(b) Approval of the selection memorandum by the head of the contracting activity or his/her authorized designee shall serve as authorization for the contracting office to commence negotiation.

736.602-5 Short selection process for procurements not to exceed the simplified acquisition threshold. References to FAR 36.602-3 and 36.6024 contained in FAR 36.602-5 shall be construed as references to 736.602-3 and 736.602-4 of this subpart.

[49 FR 13254, Apr. 3, 1984, as amended at 61 FR 39095, July 26, 1996]

736.603 Collecting data on and appraising firms' qualifications.

An USAID Consultant Registry Information System (ACRIS) is maintained in Washington by the USAID Office of Small and Disadvantaged Business Utilization. Architect-engineers wishing to perform contracts for USAID should file the appropriate form with that office, as provided in section 705.002. Procurements are publicized in the Commerce Business Daily, as provided in FAR part 5.

[49 FR 13254, Apr. 3, 1984, as amended at 52 FR 21059, June 4, 1987; 53 FR 50631, Dec. 16, 1988]

736.605 Government cost estimate for architect-engineer work.

See 736.602-3(c)(5).

PART 737 [RESERVED]

SUBCHAPTER G-CONTRACT MANAGEMENT

PART 742-CONTRACT

ADMINISTRATION

AUTHORITY: Sec. 621, Pub. L. 87-195, 75 Stat. 445, (22 U.S.C. 2381) as amended; E.O. 12163, Sept. 29, 1979, 44 FR 56673; 3 CFR, 1979 Comp., p. 435.

Subpart 742.7-Indirect Cost Rates

742.770 Negotiated indirect cost rate

agreement.

Except for educational institutions having a cognizant agency (as defined in OMB Circular A-88, 44 FR 70094, 12/5/ 79) other than USAID, USAID may establish negotiated overhead rates in a Negotiated Indirect Cost Rate Agreement, executed by both parties. The Negotiated Indirect Cost Rate Agreement is automatically incorporated in each contract between the parties and shall specify: (a) The final rate(s), (b) the base(s) to which the rate(s) apply, (c) the period(s) for which the rate(s) apply, (d) the items treated as direct costs, and (e) the contract(s) to which the rate(s) apply. The Negotiated Indirect Cost Rate Agreement shall not change any monetary ceiling, obligation, or specific cost allowance or disallowance provided for in each contract between the parties.

[49 FR 13256, Apr. 3, 1984; 53 FR 50631, Dec. 16, 1988]

[blocks in formation]
[blocks in formation]

Subpart 749.1-General Principles

749.100 Scope of subpart.

The Foreign Aid and Related Agencies Appropriation Act, 1963, and subsequent appropriation Acts, have imposed the following requirement:

None of the funds appropriated or made available pursuant to this Act for carrying out the Foreign Assistance Act of 1961, as amended, may be used for making payments on any contract for procurement to which the United States is a party entered into after the date of enactment of this Act which does not contain a provision authorizing the termination of such contract for the convenience of the United States.

See, for example, section 110 of the Foreign Assistance and Related Agencies Appropriation Act, 1965.

749.111 Review of proposed settlements.

749.111-70 Termination settlement review boards.

(a) The USAID Settlement Review Board shall be composed of the following members or their delegates (except as provided under 749.111-71(b)): (1) M/OP Director; (2) Controller;

(3) General Counsel.

(b) The M/OP Director or his/her delegate shall be designated as chairman of the board. Delegate members of the board shall have broad business and contracting experience and shall be senior USAID officials. Each member or his/her delegate must be in attendance in order to conduct business, and the board shall act by majority vote. No individual shall serve as a member of a board for the review of a proposed settlement if he/she has theretofore reviewed, approved or disapproved or recommended approval, disapproval or other action with respect to any substantive element of such settlement proposal.

(c) The chairman shall appoint a nonvoting recorder who shall be responsible for receiving cases, scheduling and recording the proceedings at meetings, maintaining a log of all cases re

ceived by him/her for the board, and other duties as assigned by the board.

[49 FR 13256, Apr. 3, 1984, as amended at 64 FR 42040, Aug. 3, 1999]

749.111-71 Required review and approval.

(a) When required. The USAID Settlement Review Board shall receive and approve all USAID/W and Mission proposed settlements or determinations if: (1) The amount of settlement, by agreement or determination, involves $100,000 or more;

(2) The settlement or determination is limited to adjustment of the fee of a cost-reimbursement contract or subcontract and: (i) In the case of complete termination, the fee, as adjusted, with respect to the terminated portion of the contract or subcontract $100,000 or more; or (ii) in the case of a partial termination, the fee, as adjusted, with respect to the terminated portion of the contract or subcontract is $100,000 or more;

is

(3) The head of the contracting activity concerned determines that a review of a specific case or class of cases is desirable; or

(4) The contracting officer, in his/her discretion, desires review by the board.

(b) Level of review. Proposed settlements in excess of $5 million shall be reviewed and approved by a board consisting of the M/OP Director, the General Counsel, and the Controller, without power of redelegation.

(c) Submission of information. The contracting officer shall submit to the board a statement of the proposed settlement agreement or determination, supported by such detailed information as is required for an adequate review. This information should normally include copies of: (1) The contractor's or subcontractor's settlement proposal, (2) the audit report, (3) the property disposal report and any required approvals in connection therewith, and (4) the contracting officer's memorandum explaining the settlement. The board may, in its discretion, require

[blocks in formation]

750.7106-3 Mistakes.

750.7106-4 Informal commitments.

750.7107 Limitations upon exercise of authority.

750.7108 Contractual requirements.

750.7109 Submission of requests by contractors.

750.7109-1 Filing requests.

750.7109-2 Form of requests by contractors. 750.7109-3 Facts and evidence. 750.7110 Processing cases.

750.7110-1 Investigation.

750.7110-2 Office of General Counsel coordination.

750.7110-3 Submission of cases to the M/OP Director.

750.7110-4 Processing by M/OP Director. 750.7110-5 Contract files.

750.7110-6 Inter-agency coordination.

AUTHORITY: Sec. 621, Pub. L. 87-195, 75 Stat. 445, (22 U.S.C. 2381) as amended; E.O. 12163, Sept. 29, 1979, 44 FR 56673; 3 CFR, 1979 Comp., p. 435.

SOURCE: 49 FR 13257, Apr. 3, 1984, unless otherwise noted.

750.000 Scope of part.

USAID is not among the agencies named in the Act or authorized by the President to take actions under it; however, see Subpart 750.71-Extraordinary Contractual Actions to Protect Foreign Policy Interests of the United States.

[blocks in formation]

750.7101 Authority.

Under section 633 of the Foreign Assistance Act of 1961, 75 Stat. 454 (22 U.S.C. 2933), as amended; Executive Order 11223, dated May 12, 1965 (30 FR 6635), as amended; and Executive Order 12163, dated September 29, 1979 (44 FR 56673), as amended, the Administrator of the U.S. Agency for International Development has been granted authority to provide extraordinary contractual relief. The Authority is set forth in sections 3 and 4 of Executive Order 11223, as follows:

Section 3. With respect to cost-type contracts heretofore or hereafter made with non-profit institutions under which no fee is charged or paid, amendments or modifications of such contracts may be made with or without consideration and may be utilized to accomplish the same things as any original contract could have accomplished, irrespective of the time or circumstances of the making, or of the form of the contract amended or modified, or of the amending or modifying contract and irrespective of rights which may have accrued under the contract or the amendments or modifications thereof. Section 4. With respect to contracts heretofore or hereafter made, other than those described in section 3 of this order, amendments and modifications of such contracts may be made with or without consideration and may be utilized to accomplish the same things as any original contract could have accomplished, irrespective of the time or circumstances of the making, or the form of the contract amended or modified, or of the amending or modifying contract, and irrespective of rights which may have accrued under the contract or the amendments or modifications thereof, if the Secretary of State or the Director of the United States International Development Cooperation Agency (with respect to functions vested in or delegated to Director) determines in each case that such action is necessary to protect

[blocks in formation]

(a) The term approving authority as used in this subpart means an officer or official having been delegated authority to approve actions under the Executive Order. This authority is distinguished from authority to take appropriate contractual action pursuant to such approval.

(b) The term the Executive Order shall mean Executive Order 11223 (30 FR 6635) as amended, unless otherwise stated.

(c) The term the Act shall mean the Foreign Assistance Act of 1961, as amended.

[49 FR 13257, Apr. 3, 1984, as amended at 49 FR 49472, Dec. 20, 1984]

[blocks in formation]

as

itself, a sufficient basis for the exercise of the authority conferred by the Executive Order. Whether, in a particular case, appropriate action such amendment without consideration, correction of a mistake or ambiguity in a contract, or formalization of an informal commitment, will protect the foreign policy interests of the United States is a matter of sound judgment to be made on the basis of all of the facts of such case. Although it is obviously impossible to predict or enumerate all the types of cases with respect to which action may be appropriate, examples of certain cases ог types of cases where action may be proper are set forth in sections 750.71062 through 750.7106 4. Even if all of the factors contained in any of the examples are present, other factors or considerations in a particular case may warrant denial of the request. These examples are not intended to exclude other cases where the approving authority determines that the circumstances warrant action.

750.7106-2 Amendments without consideration.

(a) Where an actual or threatened loss under a foreign assistance contract, however caused, will impair the productive ability of a contractor whose continued performance of any foreign assistance contract or whose continued operation as a source of supply is found to be essential to protect the foreign policy interests of the United States, the contract may be adjusted but only to the extent necessary to avoid such impairment to the contractor's productive ability.

(b) Where a contractor suffers a loss (not merely a diminution of anticipated profits) on a foreign assistance contract as a result of Government action, the character of the Government action will generally determine whether any adjustment in the contract will be made and its extent. Where the Government action is directed primarily at the contractor and is taken by the Government in its capacity as the other contracting party, the contract may be adjusted if fairness so requires; thus where such Government action, although not creating any liability on