Page images
PDF
EPUB

such costs shall be reimbursed for travel from place of abode to assigned station in the Cooperating Country and returned, only if the dependent remains in the Cooperating Country for at least 9 months or one-half of the required tour of duty of the contractor, whichever is greater, except as otherwise authorized hereunder for education, medical or emergency visitation travel. If the dependent is eligible for educational travel pursuant to the "Differential and Allowances" clause of this contract, time spent away from post resulting from educational travel will be counted as time at post.

(g) Delays Enroute. The contractor may be granted reasonable delays enroute while in travel status when such delays are caused by events beyond the control of the contractor and are not due to circuitous routine. It is understood that if delay is caused by physical incapacitation, he/she shall be eligible for such sick leave as provided under the "Leave and Holidays" clause of this contract.

(h) Travel by Privately Owned Automobile (POV). If travel by POV is authorized in the contract schedule or approved by the Contracting Officer, the contractor shall be reimbursed for the cost of travel performed in his/her POV at a rate not to exceed that authorized in the Federal Travel Regulations plus authorized per diem for the employee and for each of the authorized dependents traveling in the POV, if the POV is being driven to or from the Cooperating Country as authorized under the contract, provided that the total cost of the mileage and the per diem paid to all authorized travelers shall not exceed the total constructive cost of fare and normal per diem by all authorized travelers by surface common carrier or authorized air fare, whichever is less.

(1) Emergency and Irregular Travel and Transportation. Emergency transportation costs and travel allowances while enroute, as provided in this section, will be reimbursed not to exceed amounts authorized by the Foreign Service Travel Regulations for USAID-direct hire employees in like circumstances under the following conditions:

(1) The costs of going from post of duty in the Cooperating Country to the employee's permanent, legal place of residence at the time he or she was employed for work under this contract or other location for contractor employees and dependents and returning to the post of duty, subject to the prior written approval of the Mission Director that such travel is necessary for one of the following reasons.

(i) Need for medical care beyond that available within the area to which the employee is assigned, or serious effect on physical or mental health if residence is continued at assigned post of duty. The Mission Director may authorize a medical attendant to accompany the employee at contract ex

pense if, based on medical opinion, such an attendant is necessary.

(ii) Death, or serious illness or injury of a member of the immediate family of the employee or the immediate family of the employee's spouse.

(2) When, for any reason, the Mission Director determines it is necessary to evacuate the contractor or contractor's dependents, the contractor will be reimbursed for travel and transportation expenses and travel allowance while enroute, for the cost of the individuals going from post of duty in the Cooperating Country to the employee's permanent, legal place of residence at the time he or she was employed for work under this contract or other approved location. The return of such employees and dependents may also be authorized by the Mission Director when, in his/her discretion, he/she determines it is prudent to do so.

(3) The Mission Director may also authorize emergency or irregular travel and transportation in other situations, when in his/her opinion, the circumstances warrant such action. The authorization shall include the kind of leave to be used and appropriate restrictions as to time away from post, transportation of personal and household effects, etc.

(j) Home Leave Travel. To the extend that home leave has been authorized as provided in the "Leave and Holidays" clause of this contract, the cost of travel for home leave is reimbursable for travel costs and travel allowances of travelers from the post of duty in the Cooperating Country to place of residence in the United States (or other location provided that the cost of such travel does not exceed the cost of travel to the contractor's residence in the United States) and return to the post of duty in the Cooperating Country. Reimbursement for travel will be in accordance with the Uniform State/USAID/ USIA Foreign Service Travel Regulations, as from time to time amended, and will be limited to the cost of travel by the most direct and expeditious route. Travel allowances for travelers shall be in accordance with the rates authorized in the Standardized Regulations as from time to time amended, for not more than the travel time required by scheduled commercial air carrier using the most expeditious route using economy class. One stopover enroute for a period of not to exceed 24 hours is allowable when the traveler uses economy class accommodations for a trip of 14 hours or more of scheduled duration. Such stopover shall not be authorized when travel is by indirect route or is delayed for the convenience of the traveler or the traveler uses other than economy class. Per diem during such stopover shall be paid in accordance with the Standardized Regulations.

(k) Rest and Recuperations Travel. If approved in writing by the Mission Director,

the contractor and his/her dependents shall be allowed rest and recuperation travel on the same basis as authorized USAID directhire Mission employees and their dependents.

(1) Transportation of Motor Vehicles, Personal Effects and Household Goods.

(1) Transportation costs will be paid on the same basis as for USAID direct-hire employees serving the same length tour of duty, as authorized in the schedule. Transportation, including packing and crating costs, will be paid for shipping from the point of origin in the United States (or other location as approved by the Contracting Officer) to post of duty in the Cooperating Country and return to point of origin in the United States (or other location as approved by the Contracting Officer) of one privately-owned vehicle for the contractor, personal effects of the contractor and authorized dependents, and household goods of the contractor not to exceed the limitations in effect for such shipments for USAID direct-hire employees in accordance with the Foreign Service Travel Regulations in effect at the time shipment is made. These limitations may be obtained from the Contracting Officer.

(2) The cost of transporting motor vehicles and household goods shall not exceed the cost of packing, crating, and transportation by surface common carrier. In the event that the carrier does not require boxing or crating of motor vehicles for shipment to the Cooperating Country, the cost of boxing or crating is not reimbursable. The transportation of a privately owned motor vehicle for a contractor may be authorized as a replacement of the last such motor vehicle shipped under this contract for such contractor when the Mission Director determines, in advance, and so notifies the contractor in writing, that the replacement is necessary for reasons not due to the negligence or malfeasance of the contractor. The determination shall be made under the same rules and regulations that apply to authorized Mission U.S. citizen direct-hire employees.

(m) Unaccompanied Baggage. Unaccompanied baggage is considered to be those personal belongings needed by the traveler immediately upon arrival of the contractor and dependents, and consideration should be given to advance shipments of unaccompanied baggage. The contractor will be reimbursed for costs of shipment of unaccompanied baggage (in addition to the weight allowance for household effects) not to exceed the limitations in effect for USAID directhire employees in accordance with the Foreign Service Travel Regulations as in effect when shipment is made. These limitations are available from the Contracting Officer. This unaccompanied baggage may be shipped as air freight by the most direct route between authorized points of origin and destination regardless of the modes of travel

used. This provision is applicable to home leave travel when authorized by the terms of this contract.

(n) International Ocean Transportation. (1)(i) Transportaiton of things. Where U.S. flag vessels are not available, or their use would result in a significant delay, the contractor may obtain a release from the requirement to use U.S. flag vessels from the Transportation Division, Office of Procurement, U.S. Agency for International Development, Washington, D.C. 20523-1419, or the Mission Director, as appropriate, giving the basis for the request.

(ii) Transportation of persons. Where U.S. flag vessels are not available, or their use would result in a significant delay, the contractor may obtain a release from the requirement to use U.S. flag vessels from the Contracting Officer or the Mission Director, as appropriate.

(2) Transportation of foreign-made vehicles. Reimbursement of the costs of transporting a foreign-made motor vehicle will be made in accordance with the provisions of the Foreign Service Travel Regulations.

(3) Reduced rates on U.S.-flag carriers are in effect for shipments of household goods and personal effects of USAID contractors between certain locations. These reduced rates are available provided the shipper furnishes to the carrier at the time of the issuance of the Bill of Lading documentary evidence that the shipment is for the account of USAID. The Contracting Officer will, on request, furnish to the contractor current information concerning the availability of a reduced rate with respect to any proposed shipment. The contractor will not be reimbursed for shipments of household goods or personal effects in amounts in excess of the reduced rates which are available in accordance with the foregoing.

(0) Storage of household effects. The cost of storage charges (including packing, crating, and drayage costs) in the U.S. of household goods of the contractor will be permitted in lieu of transportation of all or any part of such goods to the Cooperating Country under paragraph (1) above provided that the total amount of effects shipped to the Cooperating Country or stored in the U.S. shall not exceed the amount authorized for USAID direct-hire employees under the Uniform Foreign Service Travel Regulations. These amounts are available from the Contracting Officer.

11. Payment (Aug 1996)

(a) Once each month, or at more frequent intervals, if approved by the paying office indicated on the Cover Page, the contractor may submit to such office form SF 1034 "Public Voucher for Purchases and Services Other Than Personal" (original) and SF 1034A (three copies), or whatever other form is locally required or accepted. Each voucher

shall be identified by the USAID contract number and properly executed in the amount of dollars claimed during the period covered. The voucher forms shall be supported by:

(1) The contractor's detailed invoice, in original and two copies, indicating for each amount claimed the paragraph of the contract under which payment is to be made, supported when applicable as follows:

(1) For compensation-a statement showing period covered, days worked, and days when contractor was in authorized travel, leave, or stopover status for which compensation is claimed. All claims for compensation will be accompanied by, or will incorporate, a certification signed by the Project Officer covering days or hours worked, or authorized travel or leave time for which compensation is claimed.

(ii) For travel and transportation-a statement of itinerary with attached carrier's receipt and/or passenger's coupons, as appropriate.

reimbursable

expenses-an

(iii) For itemized statement supported by original receipts.

(2) The first voucher submitted shall account for, and liquidate the unexpended balance of any funds advanced to the contractor.

(b) A final voucher shall be submitted by the contractor promptly following completion of the duties under this contract but in no event later than 120 days (or such longer period as the Contracting Officer may in his/ her discretion approve in writing) from the date of such completion. The contractor's claim, which includes his/her final settlement of compensation, shall not be paid until after the performance of the duties required under the terms of this contract has been approved by USAID. On receipt and approval of the voucher designated by the contractor as the "final voucher" submitted on Form SF 1034 (original) and SF 1034-A (three copies), together with a refund check for the balance remaining on hand of any funds which may have been advanced to the contractor, the Government shall pay any amounts due and owing the contractor.

(c) If approved by the paying office time and attendance may be submitted for PSCs in the same manner as is approved for directhire personnel.

12. Conversion of U.S. Dollars to Local
Currency (Dec 1985)

Upon arrival in the Cooperating Country, and from time to time as appropriate, the contractor shall consult with the Mission Director or his/her authorized representative who shall provide, in writing, the policy the contractor shall follow in the conversion of U.S. dollars to local currency. This may include, but not be limited to the conversion of said currency through the cognizant U.S.

Disbursing Officer, or Mission Controller, as appropriate.

13. Post of Assignment Privileges (July 1993)

Privileges such as the use of APO, PX's, commissaries and officers clubs are established at posts abroad under agreements between the U.S. and host governments. These facilities are intended for and usually limited to members of the official U.S. establishment including the Embassy, USAID Mission, U.S. Information Service and the Military. Normally, the agreements do not permit these facilities to be made available to non-official Americans. However, in those cases where facilities are open to non-official Americans, they may be used.

14. Security Requirements (June 1990) (a) This entire provision shall apply to the extent that this contract involves access to classified information (“Confidential", "Secret", or "Top Secret") or access to administratively controlled information ("Limited Official Use"). Contractors that are not U.S. citizens shall not have access to classified or administratively controlled information.

(b) The contractor (1) shall be responsible for safeguarding all classified or administratively controlled information in accordance with appropriate instructions furnished by the USAID Office of Security (IG/SEC), as referenced in paragraph (d) of this provision and shall not supply, disclose, or otherwise permit access to classified information or administratively controlled information to any unauthorized person; (2) shall not make or permit to be made any reproductions of classified information or administratively controlled information except with the prior written authorization of the Contracting Officer or Mission Director; (3) shall submit to the Contracting Officer, at such times as the Contracting Officer may direct, an accounting of all reproductions of classified or administratively controlled information; and (4) shall not incorporate in any other project any matter which will disclose classified and/or administratively controlled information except with the prior written authorization of the Contracting Officer.

(c) The contractor shall follow the procedures for classifying, marking, handling, transmitting, disseminating, storing, and destroying official material in accordance with the regulations in the Foreign Affairs Manual, Chapter 5 (5 FAM 900), a copy of which will be furnished by the Contracting Officer or Mission Director.

(d) The contractor agrees to submit immediately to the Mission Director or Contracting Officer a complete detailed report, appropriately classified, of any information which the contractor may have concerning existing or threatened espionage, sabotage, or subversive activity.

[ocr errors]

(e) The Government agrees that, when necessary, it shall indicate by security classification or administratively controlled designation, the degree of importance to the national defense of information to be furnished by the contractor to the Government or by the Government to the contractor, and the Government shall give written notice of such security classification or administratively controlled designation to the contractor and of any subsequent changes thereof. The contractor is authorized to rely on any letter or other written instrument signed by the Contracting Officer changing a security classification or administratively controlled designation of information.

(f) The contractor agrees to certify after completion of his/her assignment under this contract that he/she has surrendered or disposed of all classified and/or administratively controlled information in his/her custody in accordance with applicable security instructions.

15. Contractor-Mission Relationships (Dec

1985)

(a) The contractor acknowledges that this contract is an important part of the U.S. Foreign Assistance Program and agrees that his/her duties will be carried out in such a manner as to be fully commensurate with the responsibilities which this entails.

(b) While in the Cooperating Country, the contractor is expected to show respect for the conventions, customs, and institutions of the Cooperating Country and not interfere in its political affairs.

(c) If the contractor's conduct is not in accordance with paragraph (b) of this provision, the contract may be terminated under General Provision 16 of this contract. The Contractor recognizes the right of the U.S. Ambassador to direct his/her immediate removal from any country when, in the discretion of the Ambassador, the interests of the United States so require.

(d) The Mission Director is the chief representative of USAID in the Cooperating Country. In this capacity, he/she is responsible for the total USAID Program in the Cooperating Country including certain administrative responsibilities set forth in this contract and for advising USAID regarding the performance of the work under the contract and its effect on the U.S. Foreign Assistance Program. The contractor will be responsible for performing his/her duties in accordance with the statement of duties called for by the contract. However, he/she shall be under the general policy guidance of the Mission Director, and shall keep the Mission Director or his/her designated representative currently informed of the progress of the work under this contract.

16. Termination (Nov 1989)

(This is an approved deviation to be used in place of the clause specified in FAR 52.24912.)

(a) The Government may terminate performance of work under this contract in whole or, from time to time, in part:

(1) For cause, which may be effected immediately after establishing the facts warranting the termination, by giving written notice and a statement of reasons to the contractor in the event (i) the Contractor commits a breach or violation of any obligations herein contained, (ii) a fraud was committed in obtaining this contract, or (iii) the contractor is guilty (as determined by USAID) of misconduct in the Cooperating Country. Upon such a termination, the contractor's right to compensation shall cease when the period specified in such notice expires or the last day on which the contractor performs services hereunder, whichever is earlier. No costs of any kind incurred by the contractor after the date such notice is delivered shall be reimbursed hereunder except the cost of return transportation (not including travel allowances), if approved by the Contracting Officer. If any costs relating to the period subsequent to such date have been paid by USAID, the contractor shall promptly refund to USAID any such prepayment as directed by the Contracting Officer.

(2) For the convenience of USAID, by giving not less than 15 calendar days advance written notice to the contractor. Upon such a termination, contractor's right to compensation shall cease when the period specified in such notice expires except that the contractor shall be entitled to any unused vacation leave, return transportation costs and travel allowances and transportation of unaccompanied baggage costs at the rate specified in the contract and subject to the limitations which apply to authorized travel status.

(3) For the convenience of USAID, when the contractor is unable to complete performance of his/her services under the contract by reason of sickness or physical or emotional incapacity based upon a certification of such circumstances by a duly qualified doctor of medicine approved by the Mission. The contract shall be deemed terminated upon delivery to the Contractor of a termination notice. Upon such a termination, the contractor shall not be entitled to compensation except to the extent of any unused vacation or sick leave but shall be entitled to return transportation, travel allowances, and unaccompanied baggage costs at rates specified in the contract and subject to the limitations which apply to authorized travel status.

[ocr errors]

(b) The contractor, with the written consent of the Contracting Officer, may terminate this contract upon at least 15 days' written notice to the Contracting Officer.

17. Release of Information (Dec 1985)

All rights in data and reports shall become the property of the U.S. Government. All information gathered under this contract by the Contractor and all reports and recommendations hereunder shall be treated as confidential by the Contractor and shall not, without the prior written approval of the Contracting Officer, be made available to any person, party, or government, other than USAID, except as otherwise expressly provided in this contract.

18. Notices (Dec 1985)

Any notice, given by any of the parties hereunder, shall be sufficient only if in writing and delivered in person or sent by telegraph, telegram, registered, or regular mail as follows:

To USAID: Administrator, U.S. Agency for International Development, Washington, D.C. 20523-0001, Attention: Contracting Offi

cer.

(name of the cognizant Contracting Officer with a copy to the appropriate Mission Director).

To Contractor:

At his/her post of duty while in the Cooperating Country and at the Contractor's address shown on the Cover Page of this contract or to such other address as either of such parties shall designate by notice given as herein required. Notices hereunder shall be effective in accordance with this clause or on the effective date of the notice, whichever is later.

19. Reports (June 1987)

(a) The Contractor shall prepare and submit 2 copies of each technical report required by the schedule of this contract to the Bureau for Program and Policy Coordination, Center for Development Information and Evaluation, Development Information Division (PPC/CDIE/DI). All documents should be mailed to:

PPC/CDIE/DI, Acquisitions, Room 209, SA18, U.S. Agency for International Development, Washington, D.C. 20523-1802.

The title page of all reports forwarded to PPC/CDIE/DI pursuant to this paragraph shall include a descriptive title, the author's name(s), contract number, project number and title, contractor's name, name of the USAID project office, and the publication or insurance date of the report.

(b) When preparing reports, the contractor shall refrain from using elaborate art work, multicolor printing and expensive paper/ binding, unless it is specifically authorized in the Contract Schedule. Wherever possible,

pages should be printed on both sides using single spaced type.

20. Use of Pouch Facilities (July 1993) (a) Use of diplomatic pouch is controlled by the Department of State. The Department of State has authorized the use of pouch facilities for USAID contractors and their employees as a general policy, as detailed in paragraphs (a)(1) through (a)(6) of this provision. However, the final decision regarding use of pouch facilities rests with the Embassy or USAID Mission. In consideration of the use of pouch facilities as hereinafter stated, the Contractor agrees to indemnify and hold harmless the Department of State and USAID for loss or damage occurring in pouch transmission.

(1) Contractors are authorized use of the pouch for transmission and receipt of up to a maximum of 0.90 kilogram/2 pounds per shipment of correspondence and documents needed in the administration of foreign assistance programs.

(2) U.S. citizen contractors are authorized use of the pouch for personal mail up to a maximum of 0.45 kilogram/one pound per shipment (but see (a)(3) below). Non-U.S. citizen Contractors are not permitted use of the pouch for personal mail except to the extent that such use may be authorized by the Chief of Mission.

(3) Merchandise, parcels, magazines, or newspapers are not considered to be personal mail for purpose of this clause, and are not authorized to be sent or received by pouch.

(4) Official and personal mail under paragraphs (a) (1) and (2) of this provision, sent by pouch, should be addressed as follows:

Individual's Name (C), U.S. Agency for International Development, Washington, D.C. 20523-0001.

(5) Mail sent via the diplomatic pouch may not be in violation of U.S. Postal laws and may not contain material ineligible for pouch transmission.

(6) Use of military postal facilities (APO/ FPO) is authorized to U.S. contractors on the same basis as approved for direct-hire employees at the USAID Mission. Posts having access to APO/FPO facilities and using such for diplomatic pouch dispatch, may, however, accept official and personal mail for the pouch provided, of course, adequate postage is affixed when onward transmission (mail to other than USAID/W) through U.S. postal channels is required.

(b) The contractor shall be responsible for compliance with these guidelines and limitations on use of pouch facilities.

(c) Specific additional guidance on use of pouch facilities in accordance with this clause is available from the Post Communication Center at the Embassy or USAID Mission.

« PreviousContinue »