Page images
PDF
EPUB

(b) The regulations in this part do not cover the exploration for oil and gas or the issuance of leases, or operations thereunder, for oil and gas under the mineral leasing acts, which are covered by regulations in Subpart 3107 and Part 3120 of this title and 30 CFR Part 221; neither do they cover minerals underlying Indian tribal or allotted lanes, which are subject to regulations in Title 25 CFR, nor minerals subject to the general mining laws (30 U.S.C. 21-54); nor minerals under the Materials Act which are under the jurisdiction of the Secretary of Agriculture (74 Stat. 205); nor minerals underlying lands, the surface of which is not owned by the U.S. Government; nor minerals or operations subject to the provisions of 43 CFR Subpart 3041.

NOTE: See Redesignation Table 2 of 43 CFR Part 4000 to End, for appropriate sections of former Subpart 3107 and Part 3120 referred to in the above paragraph (b).

(c) When more than one permit or contract is expected to be issued to dispose of materials in a particular deposit or tract of land, such as community pits or common use areas, no requirement for reclamation will be made in such permits or contracts and the burden of reclamation will be assumed by the Government. In such cases where reclamation is not required in the permit or contract, the permittee or contracting party shall, in addition to payment of the sales price required under his permit or contract, make a reasonable contribution, as determined by the authorized officer, to defray the cost to the Government of reclamation of the land. Such contribution will be deposited in a separate account. In computing such added contribution, the authorized officer shall establish the estimated cost of reclamation upon completion of extractive operations for the deposit and the estimated total volume of material to be extracted. The contribution shall be a proportionate share of the estimated cost of reclamation in the same ratio as the material sold under the permit or contract bears to the total estimated volume of the deposit which is expected to be extracted.

(d) The regulations in this part shall apply only to permits, leases, or con

tracts issued subsequent to the date on which the regulations become effective.

[34 FR 852, Jan. 18, 1969, as amended at 37 FR 12801, June 29, 1972; 41 FR 20273, May 17, 1976]

§ 23.3 Definitions.

As used in the regulations in this part:

(a) "Mineral leasing acts" means the Mineral Leasing Act of February 25, 1920, as amended and supplemented (30 U.S.C. 181-287) and the Mineral Leasing Act for Acquired Lands (30 U.S.C. 351-359);

(b) "Materials Act" means the Act of July 31, 1947, as amended (30 U.S.C. 601-604);

(c) "Mining Supervisor" means the Area Mining Supervisor, or his authorized representative, of the Geological Survey authorized as provided in 30 CFR 211.3 and 231.2 to supervise operations on the land covered by a permit or lease;

(d) "District manager" means the manager of the district office or other authorized officer of the Bureau of Land Management having administrative jurisdiction of and responsibility for the land covered by a permit, lease, contract, application, or offer;

(e) "Overburden" means all the earth and other materials which lie above a natural deposit of minerals and such earth and other materials after removal from their natural state in the process of mining;

(f) "Area of land to be affected" or "area of land affected" means the area of land from which overburden is to be or has been removed and upon which the overburden or waste is to be or has been deposited, and includes all lands affected by the construction of new roads or the improvement or use of existing roads to gain access to an operation and for haulage;

(g) "Operation" means all of the premises, facilities, roads, and equipment used in the process of determining the location, composition or quality of a mineral deposit, or in developing, extracting, or onsite processing of a mineral deposit in a designated area; (h) "Method of operation" means the method or manner by which a cut

or open pit is made, the overburden is placed or handled, water is controlled or affected and other pacts performed by the operator in the process of exploring or uncovering and removing or onsite processing of a mineral deposit;

(i) "Holder" or "Operator" means the permittee, leasee, or contractor designated in a permit, lease, or contract;

(j) "Reclamation" means measures undertaken to bring about the necessary reconditioning or restoration of land or water that has been affected by exploration or mineral development, mining or onsite processing operations, and waste disposal, in ways which will prevent or control onsite and offsite damage to the environment.

[34 FR 852, Jan. 18, 1969, as amended at 38 FR 10009, Apr. 23, 1973]

§ 23.4 Application for permission to conduct exploration operations.

No person shall, in any manner or by any means which will cause the surface of lands to be disturbed, explore, test, or prospect for minerals (other than oil and gas) subject to disposition under the mineral leasing acts or the Materials Act without first filing an application for, and obtaining, a permit, lease or contract which authorizes such exploring, testing, or prospecting.

§ 23.5 Technical examination of prospective surface exploration and mining operations.

(a)(1) In connection with an application for a permit or lease under the mineral leasing acts or an application for a permit or an offer to make a contract under the Materials Act, the district manager shall make, or cause to be made, a technical examination of the prospective effects of the proposed exploration or surface mining operations upon the environment. The technical examination shall take into consideration the need for the preservation and protection of other resources, including recreational, scenic, historic, and ecological values; the control of erosion, flooding, and pollution of water; the isolation of toxic materials; the prevention of air pollution; the reclamation by revegetation, replace

of

ment of soil, or by other means, lands affected by the exploration or mining operations; the prevention of slides; the protection of fish and wildlife and their habitat; and the prevention of hazards to public health and safety.

(2) A technical examination of an area should be made with the recognition that actual potential mining sites and mining operations vary widely with respect to topography, climate, surrounding land uses, proximity to densely used areas, and other environmental influences and that mining and reclamation requirements should provide sufficient flexibility to permit adjustment to local conditions.

(b) Based upon the technical examination, the district manager shall formulate the general requirements which the applicant must meet for the protection of nonmineral resources during the conduct of exploration or mining operations and for the reclamation of lands or waters affected by exploration or mining operations. The general requirements shall be made known in writing to the applicant before the issuance of a permit or lease or the making of a contract, and upon acceptance thereof by the applicant, shall be incorporated in the permit, lease, or contract. If an application or offer is made under the Mineral Leasing Act for Acquired Lands and if the lands are under the jurisdiction of an agency other than the Department of the Interior, the requirements must incorporate provisions prescribed by that agency. If the application or offer is made under the Mineral Leasing Act of February 25, 1920, or the Materials Act, and if the lands are under the jurisdiction of an agency other than the Department of the Interior, the district manager shall consult representatives of the agency administering the land and obtain their recommendations for provisions to be incorporated in the general requirements. If the district manager does not concur in the recommendations, the issues shall be referred for resolution to the Under Secretary of the Department of the Interior and the comparable officer of the agency submitting the recommendations. In the case of disagreement on the issues

which are so referred, the Secretary of the Interior shall make a determination on the recommendations which shall be final and binding.

(c) In each instance in which an application or offer is made under the mineral leasing acts, the mining supervisor shall participate in the technical examination and in the formulation of the general requirements. If the lands covered by an application or offer are under the jurisdiction of a bureau of the Department of the Interior other than the Bureau of Land Management, the district manager shall consult representatives of the bureau administering the land. If the lands covered by the application or offer are under the jurisdiction of an agency other than the Department of the Interior and that agency makes a technical examination of the type provided for in paragraph (a) of this section, district managers and mining supervisors are authorized to participate in that examination.

(d) Whenever it is determined that any part of the area described in an application or offer for a permit, lease, or contract is such that previous experience under similar conditions has shown that operations cannot feasibly be conducted by any known methods or measures to avoid

(1) Rock or landslides which would be a hazard to human lives or endanger or destroy private or public property; or

(2) Substantial deposition of sediment and silt into streams, lakes, reservoirs; or

(3) A lowering of water quality below standards established by the appropriate State water pollution control agency, or by the Secretary of the Interior; or

(4) A lowering of the quality of waters whose quality exceeds that required by the established standardsunless and until it has been affirmatively demonstrated to the State water pollution control agency and to the Department of the Interior that such lowering of quality is necessary to economic and social development and will not preclude any assigned uses made of such waters; or

(5) The destruction of key wildlife habitat or important scenic, historical,

or other natural or cultural features; the district manager may prohibit or otherwise restrict operations on such part of an area.

(e) If, on the basis of a technical examination, the district manager determines that there is a likelihood that there will be a lowering of water quality as described in paragraphs (d) (3) and (4) of this section caused by the operation, no lease or permit shall be issued or contract made until after consultation with the Federal Water Pollution Control Administration and a finding by the Administration that the proposed operation would not be in violation of the Federal Water Pollution Control Act, as amended (33 U.S.C. sec. 466 et seq.) or of Executive Order No. 11288 (31 FR 9261). Where a permit or lease is involved the district manager's determination shall be made in consultation with the mining supervisor.

(f) Each notice of a proposed appropriation of a materials site filed by the Department of Transportation under 23 U.S.C. 317 shall be transmitted to the proper district manager. The district manager shall cause a technical examination to be made as provided in paragraph (a) of this section and shall formulate the requirements which the State highway department or its nominee must meet. If the land covered by the proposed appropriation is under the jurisdiction of a bureau of the Department other than the Bureau of Land Management, the district manager shall consult representatives of the bureau administering the land. If the district manager determines, or, in an instance in which the land is administered by another bureau, a representative of that bureau determines that the proposed appropriation is contrary to the public interest or is inconsistent with the purposes for which such land or materials are reserved, the district manager shall promptly submit the matter to the Secretary of the Interior for his decision. In other instances, the district manager shall notify the Department of Transportation of the requirements and conditions which the State highway department or its nominee must meet.

[blocks in formation]

§ 23.7 Approval of exploration plan.

(a) Before commencing any surface disturbing operations to explore, test, or prospect for minerals covered by the mineral leasing acts the operator shall file with the mining supervisor a plan for the proposed exploration operations. The mining supervisor shall consult with the district manager with respect to the surface protection and reclamation aspects before approving said plan.

(b) Before commencing any surface disturbing operations to explore, test, or prospect for materials covered by the Materials Act the operator shall file with the district manager a plan for the proposed exploration operations.

(c) Depending upon the size and nature of the operation and the requirements established pursuant to § 23.5 the mining supervisor or the district manager may require that the exploration plan submitted by the operator include any or all of the following:

(1) A description of the area within which exploration is to be conducted;

(2) Two copies of a suitable map or aerial photograph showing topographic, cultural and drainage features;

(3) A statement of proposed exploration methods, i.e. drilling, trenching, etc., and the location of primary support roads and facilities;

(4) A description of measures to be taken to prevent or control fire, soil erosion, pollution of surface and ground water, damage to fish and wildlife or other natural resources, and hazards to public health and

safety both during and upon abandonment of exploration activities.

(d) The mining supervisor or the district manager shall promptly review the exploration plan submitted to him by the operator and shall indicate to the operator any changes, additions, or amendments necessary to meet the requirements formulated pursuant to § 23.5, the provisions of the regulations in this part, and the terms of the permit.

(e) The operator shall comply with the provisions of an approved exploration plan. The mining supervisor and the district manager may, with respect to such a plan, exercise the authority provided by paragraphs (f) and (g) of § 23.8 respecting a mining plan.

§ 23.8 Approval of mining plan.

(a) (1) Before surface mining operations may commence under any permit or lease issued under the mineral leasing acts the operator must file a mining plan with the mining supervisor and obtain his approval of the plan. Paragraphs (b) through (g) of this section confer authority upon mining supervisors with respect to mining plans pertaining to permits or leases issued under the mineral leasing acts. The mining supervisor shall consult with the district manager with respect to the surface protection and reclamation aspects before approving said plan.

(2) Before surface mining operations may commence under any permit issued or contract made under the Materials Act, the operator must file a mining plan with the district manager and obtain his approval of the plan. Paragraphs (b) through (g) of this section confer authority upon district managers with respect to mining plans pertaining to permits issued or contracts made under the Materials Act.

(b) Depending on the size and nature of the operation and the requirements established pursuant to § 23.5, the mining supervisor or the district manager may require that the mining plan submitted by the operator include any or all of the following:

(1) A description of the location and area to be affected by the operations;

(2) Two copies of a suitable map, or aerial photograph showing the topography, the area covered by the permit, lease, or contract, the name and location of major topographic and cultural features, and the drainage plan away from the area to be affected;

(3) A statement of proposed methods of operating, including a description of proposed roads or vehicular trails; the size and location of structures and facilities to be built;

(4) An estimate of the quantity of water to be used and pollutants that are expected to enter any receiving waters;

(5) A design for the necessary impoundment, treatment or control of all runoff water and drainage from workings so as to reduce soil erosion and sedimentation and to prevent the pollution of receiving waters;

(6) A description of measures to be taken to prevent or control fire, soil erosion, pollution of surface and ground water, damage to fish and wildlife, and hazards to public health and safety; and

(7) A statement of the proposed manner and time of performance of work to reclaim areas disturbed by the holder's operation.

(c) In those instances in which the permit, lease, or contract requires the revegetation of an area of land to be affected the mining plan shall show:

(1) Proposed methods of preparation and fertilizing the soil prior to replanting;

(2) Types and mixtures of shrubs, trees, or tree seedlings, grasses or legumes to be planted; and

(3) Types and methods of planting, including the amount of grasses or legumes per acre, or the number and spacing of trees, or tree seedlings, or combinations of grasses and trees.

(d) In those instances in which the permit, lease, or contract requires regrading and backfilling, the mining plan shall show the proposed methods and the timing of grading and backfilling of areas to be affected by the operation.

(e) The mining supervisor or the district manager shall review the mining plan submitted to him by the operator and shall promptly indicate to the operator any changes, additions,

or

amendments necessary to meet the requirements formulated pursuant to § 23.5, the provisions of the regulations in this part and the terms of the permit, lease, or contract. The operator shall comply with the provisions of an approved mining plan.

(f) A mining plan may be changed by mutual consent of the mining supervisor or the district manager and the operator at any time to adjust to changed conditions or to correct any oversight. To obtain approval of a change or supplemental plan the operator shall submit a written statement of the proposed changes or supplement and the justification for the changes proposed. The mining supervisor or the district manager shall promptly notify the operator that he consents to the proposed changes or supplement or, in the event he does not consent, he shall specify the modifications thereto under which the proposed changes or supplement would be acceptable. After mutual acceptance of a change of a plan the operator shall not depart therefrom without further approval.

(g) If circumstances warrant, or if development of a mining plan for the entire operation is dependent upon unknown factors which cannot or will not be determined except during the progress of the operations, a partial plan may be approved and supplemented from time to time. The operator shall not, however, perform any operation except under an approved plan.

§ 23.9 Performance bond.

(a) (1) Upon approval of an exploration plan or mining plan, the operator shall be required to file a suitable performance bond of not less than $2,000 with satisfactory surety, payable to the Secretary of the Interior, and the bond shall be conditioned upon the faithful compliance with applicable regulations, the terms and conditions of the permit, lease, or contract, and the exploration or mining plan as approved, amended or supplemented. The bond shall be in an amount sufficient to satisfy the reclamation requirements of an approved exploration or mining plan, or an approved partial

« PreviousContinue »