specifications necessary to support armory and nonarmory projects in the MCARNG program.

11.

REQUIREMENT: For design of necessary projects in the MCARNG program.

FORM

DD1 DEC 1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO

1-106

[blocks in formation]

10

DESCRIPTION OF PROPOSED CONSTRUCTION Construction of urgently needed minor construction projects (projects costing less than $100,000). REQUIREMENT: Necessary to support the ARNG mission.

11.

[blocks in formation]
[blocks in formation]

10. DESCRIPTION OF PROPOSED CONSTRUCTION Install storm windows/doors and additional insulation in 87 locations in 17 States. These are all maintenance and logistical facilities and are used at least 5 days a week. The States are: AK, IA, ME, MI, MN, MO, MT, NE, NH, ND, OH, SD, VT, UT, WV, WI, WY. 11. REQUIREMENT:

PROJECT: energy.

Provides mechanical and structural modifications to conserve

REQUIREMENT: Shortages of all types of energy sources dictate the need to reduce energy loss and consumption to an absolute minimum.

CURRENT SITUATION: Existing structures require large quantities of energy to operate due to inadequate insulation. Existing low efficiency mechanical systems use much larger quantities of energy than modern systems. IMPACT IF NOT PROVIDED:

in fuel costs.

Construction costs will be amortized by savings