Grain Bins--Department of Agriculture: Hearings Before the Permanent Subcommittee on Investigations of the Committee on Government Operations, United States Senate, Eighty-fourth Congress, First Session, July 22, August 2, 3, and 4, 1955 |
From inside the book
Results 1-5 of 100
Page 4
... correct ? Mr. LOCRAFT . That is correct . On this May 6 trip I was accompanied by several representatives from the Washington office and several local departmental personnel at each bin site visited . There were several men from the ...
... correct ? Mr. LOCRAFT . That is correct . On this May 6 trip I was accompanied by several representatives from the Washington office and several local departmental personnel at each bin site visited . There were several men from the ...
Page 5
... correct . Mr. KENNEDY . Under three contracts , Mr. Chairman , totaling $ 4,887,000.20- $ 4,887,000 . The CHAIRMAN . Do you have those figures ? Mr. LOCRAFT . I have heard the large amount of the figures ; yes , sir , but I do not know ...
... correct . Mr. KENNEDY . Under three contracts , Mr. Chairman , totaling $ 4,887,000.20- $ 4,887,000 . The CHAIRMAN . Do you have those figures ? Mr. LOCRAFT . I have heard the large amount of the figures ; yes , sir , but I do not know ...
Page 7
... correct . The CHAIRMAN . All right , proceed . ( At this point Senator Symington withdrew from the hearing room . ) Mr. LoCRAFT . On top of the corrugated sidings there is a corrugated metal roof . Then the inside of the bin has a ...
... correct . The CHAIRMAN . All right , proceed . ( At this point Senator Symington withdrew from the hearing room . ) Mr. LoCRAFT . On top of the corrugated sidings there is a corrugated metal roof . Then the inside of the bin has a ...
Page 8
... correct . I can clear that right now . The radius of the bin , according to contract plans , should be 9 feet or reasonably close thereto , for an 18 - foot bin . The bin at Rochester was taken apart after I measured it in places . It ...
... correct . I can clear that right now . The radius of the bin , according to contract plans , should be 9 feet or reasonably close thereto , for an 18 - foot bin . The bin at Rochester was taken apart after I measured it in places . It ...
Page 11
... correct . The CHAIRMAN . I understand that there is some question also raised as to the proper erection by the contractor . Mr. LOCRAFT . That is correct . The CHAIRMAN . We are talking now about the manufacturer ? Mr. LOCRAFT . Yes ...
... correct . The CHAIRMAN . I understand that there is some question also raised as to the proper erection by the contractor . Mr. LOCRAFT . That is correct . The CHAIRMAN . We are talking now about the manufacturer ? Mr. LOCRAFT . Yes ...
Other editions - View all
Common terms and phrases
9 feet assembled BAILEY BECRAFT believe body sheets bolt holes Bottom ring sheet center to center Chair CHAIRMAN CHRISTIANSEN committee Commodity Credit Corporation CONGRESS THE LIBRARY construction correct corrugation County defective delivery Department of Agriculture Dickenson County door drawings DUFFY engineer erection contractor exhibit fabrication fault floor footing pad foundation pad foundation ring sheet foundation sheet furnished gage galvanizing GIBSON Government grain bins Grain Division HUFF inches at center inches center inspec inspection investigation Iowa joint Kans Kansas City KENNEDY letter LINEBERRY LOCRAFT manufacturer manufacturer's MARVIN L McLain ment metal MOLANDER naval inspector Navy Photo shows pilot model plant punched PURPUS question request responsibility roof scalloped Senator BENDER Senator MUNDT Senator SYMINGTON shipment shop drawings Sivalls & Bryson specifications statement structures testimony tion United States Department vertical wall sheets Washington WHEELER
Popular passages
Page 272 - The contractor warrants that he has not employed any person to solicit or secure this contract upon any agreement for a commission, percentage, brokerage, or contingent fee. Breach of this warranty shall give the Government the right to annul the contract, or, in its discretion, to deduct from the contract price or consideration the amount of such commission, percentage, brokerage...
Page 279 - The decision of the Secretary or his duly authorized representative for the determination of such appeals shall be final and conclusive unless determined by a court of competent jurisdiction to have been fraudulent, or capricious, or arbitrary, or so grossly erroneous as necessarily to imply bad faith, or not supported by substantial evidence.
Page 272 - This warranty shall not apply to commissions payable by Contractors upon contracts or sales secured or made through bona fide established commercial or selling agencies maintained by the Contractor for the purpose of securing business.
Page 269 - Government, or if any such surety fails to furnish reports as to his financial condition from time to time as requested by the Government, the Contractor shall promptly furnish such additional security as may be required from time to time to protect the interests of the Government and of persons supplying labor or materials in the prosecution of the work contemplated by this contract.
Page 272 - ... supplies as have been mined or produced in the United States, and only such manufactured articles, materials, and supplies as have been manufactured in the United States...
Page 278 - That unless otherwise expressly permitted by such contract any such assignment shall cover all amounts payable under such contract and not already paid, shall not be made to more than one party, and shall not be subject to further assignment, except that any such assignment may be made to one party as agent or trustee for two or more parties participating in such financing; 4. That in the event of any such assignment, the assignee thereof shall file written notice of the assignment together with...
Page 276 - Rejection, operations subsequent to acceptance may be rejected, and if rejected, shall be replaced by the manufacturer without charge to the purchaser. The full weight of the original material rejected shall be returned to the manufacturer.
Page 279 - Contractor shall be afforded an opportunity to be heard and to offer evidence in support of its appeal. Pending final decision of a dispute hereunder, the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision. b. This "Disputes...
Page 61 - ... SUBCOMMITTEE ON INVESTIGATIONS OF THE COMMITTEE ON GOVERNMENT OPERATIONS, Washington, DC The subcommittee met at 10...
Page 279 - ... articles, materials, and supplies as have been mined or produced in the United States, and only such manufactured articles, materials...