B. Equipment associated with this project which will be provided from other appropriations:

[blocks in formation]

$1,247

$748

122005

012006

042009

Fire Extinguishers

JOINT USE CERTIFICATION:

Cost
(5000)

$315

The Regional Commander certifies that this project has been considered for joint use potential. Joint Use is recommended. Unilateral Construction is recommended. This facility can be used by other components on an as available basis; however, the scope of the project is based on Navy requirements.

[blocks in formation]

Submitted to Congress

$10

[blocks in formation]
[blocks in formation]

Form

1 Dec 76

Approp 25,584

Auth for Approp 25,584

Phone No: (671) 339-5185

1391 C

Submitted to Congress

Page No.

295

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Funds to be utilized under Title 10 USC 2807 for architectural and engineering services and construction design in connection with military construction projects including regular program projects, unspecified minor construction, emergency construction, land appraisals, and other projects as directed. Engineering investigations, such as field

surveys and foundation exploration, will be undertaken as necessary.

11. Requirement:

PROJECT:

Planning and design funds.

(Current Mission)

REQUIREMENT:

All projects in a military construction program presented for approval must be based on sound engineering and the best cost data available. For this reason, design is initiated to establish project estimates in advance of program submittal to the Congress. Based on this preliminary design, final plans and specifications are then prepared. These costs for architectural and engineering services and construction design are not provided for in the construction project cost estimates except in those where Design/Build contracting method is used.

[blocks in formation]
[blocks in formation]
[blocks in formation]

B. Equipment associated with this project which will be provided from other appropriations: None

JOINT USE CERTIFICATION:

N/A

Activity POC: CDR Erica Sahler

Phone No: (703)-601-1631

DD

Form 1 Dec 76

$0

[ocr errors]

1391 C

Submitted to Congress

Page No.

298

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small]

Projects authorized by Title 10 USC 2805 not otherwise authorized by law having an approved cost of $1,500,000 or less, including construction, alteration, or conversion of permanent or temporary facilities. Projects intended solely to correct a deficiency that is life-threatening, health-threatening, or safety-threatening, may have an approved cost equal to or less than $3,000,000. Total request includes funds for supervision, inspection, and overhead.

11. Requirement:

PROJECT:

Unspecified Minor Construction.

(Current Mission)

REQUIREMENT:

Title 10 USC 2805 provides authority to the Secretary of Defense and the Secretaries of the Military Departments to acquire, construct, extend, alter or install permanent facilities having an approved cost of $1,500,000 or less not otherwise authorized by law. Included are those items required for which a need cannot reasonably be foreseen nor justified in time to be included in an annual military construction program, but are so urgently required that financing cannot be deferred until legislation in support of a new program is enacted.