§ 6.402 Availability of documents.

(a) General. The responsible official will ensure sufficient copies of the EIS are distributed to interested and affected members of the public and are made available for further public distribution. EISS, comments received, and any underlying documents should be available to the public pursuant to the provisions of the Freedom of Information Act (5 U.S.C. 552(b)), without regard to the exclusion for interagency memoranda where such memoranda transmit comments of Federal agencies on the environmental impact of the proposed actions. To the extent practicable, materials made available to the public shall be provided without charge; otherwise, a fee may be imposed which is not more than the actual cost of reproducing copies required to be sent to another Federal agency.

(b) Public information. Lists of all notices, determinations and other reports/documentation, related to these notices and determinations, involving CES, EAS, FNSIS, notices of intent, EISS, and RODS prepared by EPA shall be available for public inspection and maintained by the responsible official as a monthly status report. OEA shall maintain a comprehensive list of notices of intent and draft and final EISS provided by all responsible officials for public inspection including publication in the FEDERAL REGISTER. In addition, OEA will make copies of all EPA-prepared EISS available for public inspection; the responsible official shall do the same for any EIS he/ she undertakes.

[44 FR 64177, Nov. 6, 1979, as amended at 51 FR 32611, Sept. 12, 1986)

§ 6.403 The commenting process.

(a) Inviting comments. After preparing a draft EIS and before preparing a final EIS, the responsible official shall obtain the comments of Federal agencies, other governmental entities and the public in accordance with 40 CFR 1503.1.

(b) Response to comments. The responsible official shall respond to comments in the final EIS in accordance with 40 CFR 1503.4.

§ 6.404 Supplements.

(a) General. The responsible official shall consider preparing supplements to draft and final EISS in accordance with 40 CFR 1502.9(c). A supplement shall be prepared, circulated and filed in the same fashion (exclusive of scoping) as draft and final EISS.

(b) Alternative procedures. In the case where the responsible official wants to deviate from existing procedures, OEA shall be consulted. OEA shall consult with CEQ on any alternative arrangements.

[44 FR 64177, Nov. 6, 1979, as amended at 47 FR 9829, Mar. 8, 1982]

[blocks in formation]

(a) "Step 1 facilities planning" means preparation of a plan for facilities as described in 40 CFR Part 35, Subpart E or I.

(b) "Siep 2" means a project to prepare design drawings and specifications as described in 40 CFR Part 35, Subpart E or I.

(c) "Step 3" means a project to build a publicly owned treatment works as described in 40 CFR Part 35, Subpart E or I.

(d) "Step 2+ 3" means a project which combines preparation of design drawings and specifications as described in § 6.501(b) and building as described in § 6.501(c).

(e) "Applicant" means any individual, agency, or entity which has filed an application for grant assistance under 40 CFR Part 35, Subpart E or I.

(f) "Grantee" means any individual, agency, or entity which has been awarded wastewater treatment construction grant assistance under 40 CFR Part 35, Subpart E or I.

(g) "Responsible Official" means a Federal or State official authorized to fulfill the requirements of this subpart. The responsible federal official is the EPA Regional Administrator and the responsible State official is as defined in a delegation agreement under 205(g) of the Clean Water Act. The responsibilities of the State official are subject to the limitations in § 6.514 of this subpart.

(h) "Approval of the facilities plan” means approval of the facilities plan for a proposed wastewater treatment works pursuant to 40 CFR Part 35, Subpart E or I.

§ 6.502 Applicability and limitations.

(a) Applicability. This subpart applies to the following actions:

(1) Approval of a facilities plan or an amendment to the plan;

(2) Award of grant assistance for a project where signficant change has occurred in the project or its impact since prior compliance with this part; and

(3) Approval of preliminary Step 3 work prior to the award of grant assistance pursuant to 40 CFR Part 35, Subpart E or I.

(b) Limitations. (1) Except as provided in § 6.504(c), all recipients of Step 1 grant assistance must comply with the requirements, steps, and procedures described in this subpart.

(2) As specified in 40 CFR 35.2113, projects that have not received Step 1 grant assistance must comply with the requirements of this subpart prior to submission of an application for Step 3 or Step 2+3 grant assistance.

(3) Except as otherwise provided in § 6.507, no step 3 or 2+3 grant assistance may be awarded for the construction of any component/portion of a proposed wastewater treatment system(s) until the responsible official has:

(i) Completed the environmental review for all complete wastewater treatment system alternatives under consideration for the facilities planning area, or any larger study area

identified for the purposes of conducting an adequate environmental review as required under this subpart; and

(ii) Recorded the selection of the preferred alternative(s) in the appropriate decision document (ROD for EISS, FNSI for environmental assessments, or written determination for categorical exclusions).

(4) In accord with § 6.302(f), on or after October 18, 1982, no new expenditures or financial assistance involving the construction grants program can be made within the Coastal Barrier Resource System, or for projects outside the system which would have the effect of encouraging development in the system, other than specified exceptions made by the EPA after consultation with the Secretary of the Interior.

[50 FR 26317, June 25, 1985, as amended at 51 FR 32611, Sept. 12, 1986]

§ 6.503 Overview of the environmental review process.

The process for conducting an environmental review of wastewater treatment construction grant projects includes the following steps:

(a) Consultation. The Step 1 grantee or the potential Step 3 or Step 2+3 applicant is encouraged to consult with the State and EPA early in project formulation or the facilities planning stage to determine whether a project is eligible for a categorical exclusion from the remaining substantive environmental review requirements of this part (§ 6.505), to determine alternatives to the proposed project for evaluation, to identify potential environmental issues and opportunities for public recreation and open space, and to determine the potential need for partitioning the environmental review process and/or the need for an Environmental Impact Statement (EIS).

(b) Determining categorical exclusion eligibility. At the request of a potential Step 3 or Step 2+3 grant applicant, or a Step 1 facilities planning grantee, the responsible official will determine if a project is eligible for a categorical exclusion in accordance with 6.505. A Step 1 facilities planning grantee awarded a Step 1 grant on or before December 29, 1981 may

request a categorical exclusion at any time during Step 1 facilities planning. A potential Step 3 or Step 2+3 grant applicant may request a categorical exclusion at any time before the submission of a Step 3 or Step 2+3 grant application.

(c) Documenting environmental information. If the project is determined to be ineligible for a categorical exclusion, or if no request for a categorical exclusion is made, the potential Step 3 or Step 2+3 applicant or the Step 1 grantee subsequently prepares an Environmental Information Document

(EID) (§ 6.506) for the project. (d) Preparing environmental assessments. Except as provided in § 6.506(c)(4) and following a review of the EID by EPA or by a State with delegated authority, EPA prepares an environmental assessment (§ 6.506), or a State with delegated authority (§ 6.514) prepares a preliminary environmental assessment. EPA reviews and finalizes any preliminary assessments. EPA subsequently:

(1) Prepares and issues a Finding of No Significant Impact (FNSI) (§ 6.508); or

(2) Prepares and issues a Notice of Intent to prepare an original or supplemental EIS (§ 6.510) and Record of Decision (ROD) (§ 6.511).

(e) Monitoring. The construction and post-construction operation and maintenance of the facilities are monitored (§6.512) to ensure implementation of mitigation measures (§ 6.511) identified in the FNSI or ROD.

[50 FR 26317, June 25, 1985, as amended at 51 FR 32611, Sept. 12, 1986]

§ 6.504 Consultation during the facilities planning process.

(a) General. Consistent with 40 CFR 1501.2 and 35.2030(c), the responsible official shall initiate the environmental review process early to identify environmental effects, avoid delays, and resolve conflicts. The environmental review process should be integrated throughout the facilities planning process. Two processes for consultation are described in this section to meet this objective. The first addresses projects awarded Step 1 grant assistance on or before December 29, 1981. The second applies to projects

not receiving grant assistance for facilities planning on or before December 29, 1981 and, therefore, subject to the regulations implementing the Municipal Wastewater Treatment Construction Grant Amendments of 1981 (40 CFR Part 35, Subpart I).

(b) Projects receiving Step 1 grant assistance on or before December 29, 1981. (1) During facilities planning, the grantee shall evaluate project alternatives and the existence of environmentally important resource areas including those identified in § 6.108 and § 6.509 of this subpart, and potential for open space and recreation opportunities in the facilities planning area. This evaluation is intended to be brief and concise and should draw on existing information from EPA, State agencies, regional planning agencies, areawide water quality management agencies, and the Step 1 grantee. The Step grantee should submit this information to EPA or a delegated State at the earliest possible time during facilities planning to allow EPA to determine if the action is eligible for a categorical exclusion. The evaluation and any additional analysis deemed necessary by the responsible official may be used by EPA to determine whether the action is eligible for a categorical exclusion from the substantive environmental review requirements of this part. If a categorical exclusion is granted, the grantee will not be required to prepare a formal EID nor will the responsible official be required to prepare an environmental assessment under NEPA. If an action is not granted a categorical exclusion, this evaluation may be used to determine the scope of the EID required of the grantee. This information can also be used to make an early determination of the need for partitioning the environmental review or for an EIS. Whenever possible, the Step 1 grantee should discuss this initial evaluation with both the delegated State and EPA.

(2) A review of environmental information developed by the grantee should be conducted by the responsible official whenever meetings are held to assess the progress of facilities plan development. These meetings should be held after completion of the

majority of the EID document and before a preferred alternative is selected. Since any required EIS must be completed before the approval of a facilities plan, a decision whether to prepare an EIS is encouraged early during the facilities planning process. These meetings may assist in this early determination. EPA should inform interested parties of the following:

(i) The preliminary nature of the Agency's position on preparing an EIS;

(ii) The relationship between the facilities planning and environmental review processes;

(iii) The desirability of public input; and

(iv) A contact person for further information.

(c) Projects not receiving grant assistance for Step 1 facilities planning on or before December 29, 1981. Potential Step 3 or Step 2+3 grant applicants should, in accordance with § 35.2030(c), consult with EPA and the State early in the facilities planning process to determine the appropriateness of a categorical exclusion, the scope of an EID, or the appropriateness of the early preparation of an environmental assessment or an EIS. The consultation would be most useful during the evaluation of project alternatives prior to the selection of a preferred alternative to assist in resolving any identified environmental problems.

§ 6.505 Categorical exclusions.

(a) General. At the request of an existing Step 1 facilities planning grantee or of a potential Step 3 or Step 2+3 grant applicant, the responsible official, as provided for in §§ 6.107(b), 6.400(f) and 6.504(a), shall determine from existing information and document whether an action is consistent with the categories eligible for exclusion from NEFA review identified in § 6.107(d) or § 6.505(b) and not inconsistent with the criteria in § 6.107(e) or § 6.505(c).

(b) Specialized categories of actions eligible for exclusion. For this subpart, eligible actions consist of any of the categories in § 6.107(d), or:

(1) Actions for which the facilities planning is consistent with the catego

ry listed in § 6.107(d)(1) which do not affect the degree of treatment or capacity of the existing facility including, but not limited to, infiltration and inflow corrections, grant-eligible replacement of existing mechanical equipment or structures, and the construction of small structures on existing sites;

(2) Actions in sewered communities of less than 10,000 persons which are for minor upgrading and minor expansion of existing treatment works. This category does not include actions that directly or indirectly involve the extension of new collection systems funded with federal or other sources of funds;

(3) Actions in unsewered communities of less than 10,000 persons where on-site technologies are proposed; or

(4) Other actions are developed in accordance with § 6.107(f).

(c) Specialized Criteria for not granting a categorical exclusion. (1) The full environmental review procedures of this part must be followed if undertaking an action consistent with the categories described in paragraph (b) of this section meets any of the criteria listed in § 6.107(e) or when:

(i) The facilities to be provided will (A) create a new, or (B) relocate an existing, discharge to surface or ground waters;

(ii) The facilities will result in substantial increases in the volume of discharge or the loading of pollutants from an existing source or from new facilities to receiving waters; or

(iii) The facilities would provide capacity to serve a population 30% greater than the existing population.

(d) Proceeding with grant awards. (1) After a categorical exclusion on a proposed treatment works has been granted, and notices published in accordance with § 6.400(f), grant awards may proceed without being subject to any further environmental review requirements under this part, unless the responsible official later determines that the project, or the conditions at the time the categorical determination was made, have changed significantly since the independent EPA review of information submitted by the grantee in support of the exclusion.

(2) For all categorical exclusion determinations:

(i) That are five or more years old on projects awaiting Step 2+3 or Step 3 grant funding, the responsible official shall re-evaluate the project, environmental conditions and public views and, prior to grant award, either:

(A) Reaffirm-issue a public notice reaffirming EPA's decision to proceed with the project without need for any further environmental review;

(B) Supplement-update the information in the decision document on the categorically excluded project and prepare, issue, and distribute a revised notice in accordance with § 6.107(f); or (C) Reassess-revoke the categorical exclusion in accordance with § 6.107(c) and require a complete environmental review to determine the need for an EIS in accordance with § 6.506, followed by preparation, issuance and distribution of an EA/FNSI or EIS/ ROD.

(ii) That are made on projects that have been awarded a Step 2+3 grant, the responsible official shall, at the time of plans and specifications review under § 35.2202(b) of this title, assess whether the environmental conditions or the project's anticipated impact on the environment have changed and, prior to plans and specifications approval, advise the Regional Administrator if additional environmental review is necessary.

[50 FR 26317, June 25, 1985, as amended at 51 FR 32611, Sept. 12, 1986]

§ 6.506 Environmental review process.

(a) Review of completed facilities plans. The responsible official shall ensure a review of the completed facilities plan with particular attention to the EID and its utilization in the development of alternatives and the selection of a preferred alternative. An adequate EID shall be an integral part of any facilities plan submitted to EPA or to a State. The EID shall be of sufficient scope to enable the responsible official to make determinations on requests for partitioning the environmental review process in accordance with § 6.507 and for preparing environmental assessments in accordance with § 6.506(b).

(b) Environmental assessment. The environmental assessment process shall cover all potentially significant environmental impacts. The responsible official shall prepare a preliminary environmental assessment on which to base a recommendation to finalize and issue the environmental assessment/ FNSI. For those States delegated environmental review responsibilities under § 6.514, the State responsible official shall prepare the preliminary environmental assessment in sufficient detail to serve as an adequate basis for EPA's independent NEPA review and decision to finalize and issue an environmental assessment/FNSI or to prepare and issue a notice of intent for an EIS/ROD. The EPA also may require submission of supplementary information before the facilities plan is approved if needed for its independent review of the State's preliminary assessment for compliance with environmental review requirements. Substantial requests for supplementary information by EPA, including the review of the facilities plan, shall be made in writing. Each of the following subjects outlined below, and requirements of Subpart C of this part, shall be reviewed by the responsible official to identify potentially significant environmental concerns and their associated potential impacts, and the responsible official shall furthermore address these concerns and impacts in the environmental assessment:

(1) Description of the existing environment. For the delineated facilities planning area, the existing environmental conditions relevant to the analysis of alternatives, or to determining the environmental impacts of the proposed action, shall be considered.

(2) Description of the future environment without the project. The relevant future environmental conditions shall be described. The no action alternative should be discussed.

(3) Purpose and need. This should include a summary discussion and demonstration of the need, or absence of need, for wastewater treatment in the facilities planning area, with particular emphasis on existing public health or water quality problems and their severity and extent.

« PreviousContinue »