MEADVILLE, PA. ($168,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: 16-foot-wide stream runs under building. No rifle range or outdoor drill space. Cannot get M-42 tanks through narrow street. Rooms too small for classrooms and office space.

MILWAUKEE (WEST), WIS. ($602,000)

Three-unit ARC with three-bay maintenance shop.

Deficiencies of existing facility: The strengths in the Milwaukee area justify this additional facility.

MORRISTOWN, N.J. ($317,000)

One-unit ARC with two-bay maintenance shop.

Deficiencies of existing facility: Inadequate classroom, office, drill. administrative, supply and storage space. Inadequate parking for reservists. No space for training on heavy equipment.

MT. VERNON, OHIO ($168,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: Present facility contains insufficient classroom space for the proper conduct of instruction. Facility is located on the second floor of a building which is in poor condition. Authorized heavy equipment cannot be issued due to lack of adequate storage and maintenance space.

MUNCIE, IND. ($168,000)

One-unit (M) ARC with one-bay maintenance shop. Deficiencies of existing facility: Insufficient classroom, office, parking, and vehicle shop area.

MUSKOGEE, OKLA. ($288,000)

One-unit ARC with two-bay maintenance shop.

Deficiencies of existing facility: Design structure of this facility, although sufficient in floor space, is not suitable for permanent use as a training center. Proper distribution of administrative, storage and maintenance, and training space cannot be made at a reasonable cost. Due to its location in the heart of downtown Muskogee, there is not sufficient space to maneuver the heavy equipment assigned to units without causing danger to motorists in the vicinity, and further without causing danger to reservists due to high-tension electric lines in the immediate vicinity of the training center.

NEW ORLEANS (No. 1), LA. ($520,000)

Three-unit ARC with three-bay maintenance shop.

Deficiencies of existing facilities: Buildings are temporary barracks-type structures that cannot be economically modified for use as a Reserve center. Authorized unit equipment cannot be issued due to lack of adequate storage and maintenance space.

ODESSA, TEX. ($152,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: Present facility does not provide space for storage and maintenance of authorized unit equipment. Space is considered adequate for the present; however, due to the growth of units and additional equipment being issued, this facility will not be adequate in the near future. The facility does not meet the requirements of a constructed Army Reserve Center.

OKMULGEE, OKLA. ($160,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: Space is insufficient to provide for the training requirements of assigned units. Classroom space is inadequate and no space is available for storage and maintenance of authorized equipment.

OLEAN, N.Y. ($176,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: Classroom space is inadequate, and no space is available for unit training on heavy equipment. Authorized unit equipment cannot be issued due to lack of adequate storage and maintenance space.

OSWEGO, N.Y. ($176,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: Facility does not provide adequate classroom, drill or equipment storage space. Vehicle parking area or storage and maintenance space is not available.

PAINESVILLE, OHIO ($168,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: Inadequate classroom, administrative, storage, and maintenance space. No secure parking area for Government vehicles. No parking area for reservists' vehicles. Building below acceptable Army standards and in need of extensive repairs.

PITTSBURGH (NO. 3), PA. ($574,000)

Three-unit ARC with three-bay maintenance shop.

Deficiencies of existing facility: Classroom ventilation is very poor and space is inadequate. Equipment and vehicle storage and maintenance space is inadequate. Facility located in congested area and parking is restricted.

PURCELL, OKLA. ($160,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: The present facility is a garagetype structure that cannot be economically modified to provide essential classroom space. The vehicle-maintenance space is located inside the facility, which causes considerable confusion during drill.

38060-59- -43

ROLLA, MO. ($160,000)

One-unit (M) ARC with one-bay maintenance shop.

Deficiencies of existing facility: Present facility does not contain adequate classroom or office space. Storage and maintenance facilities are not adequate to store and maintain the equipment authorized.

RUTLAND, VT. ($143,000)

Assembly hall and two-bay maintenance shop.

Deficiencies of existing facility: The assembly hall and maintenance shop were not authorized at the time this Reserve center was constructed. This space is required for the proper training of reservists and for storage and maintenance of authorized equipment.

SACRAMENTO, CALIF. ($61,000)

Three-bay maintenance shop.

Deficiencies of existing facility: Lacks maintenance shop which is required for storage and maintenance of unit equipment.

ST. CLOUD, MINN. ($330,000)

One-unit ARC with two-bay maintenance shop.

Deficiencies of existing facility: Present facility lacks adequate classroom, office, and administrative space. Maintenance, training, and storage facilities are inadequate for heavy equipment. There are no hardstands, outdoor storage, or parking area.

SALEM, OREG. ($61,000)

Three-bay maintenance shop.

Deficiencies of existing facility: The present constructed ARC has no covered space for care and maintenance of vehicles and heavy equip ment. When the center was constructed in 1951 there was no plan to build a maintenance shop simultaneously with each new center. Lack of a maintenance shop has hampered training and the accomplishment of unit mission.

SAN ANTONIO (NO. 2), TEX. ($520,000)

Three-unit ARC with three-bay maintenance shop.

Deficiencies of existing facility: Temporary construction and unsuited for use as a USARC. Storage and maintenance space for or ganizational heavy equipment is inadequate, which precludes issue of heavy equipment required for unit training.

SAN DIEGO, CALIF. ($526,000)

Two-unit ARC with three-bay maintenance shop.

Deficiencies of existing facility: Fort Rosecrans is in an isolated location, which has hampered expansion of the Reserve program. Facility is of frame construction and cannot be economically modified for use as a Reserve center. Available classroom, administrative, storage, and maintenace space is inadequate.

SAN MARCOS, TEX. ($152,000)

One-unit (M) ARC with one-bay maintenance shop. Deficiencies of existing facility: The buildings utilized by the Army Reserve at Camp Gary were acquired for an interim period until a USARC could be constructed. Camp Gary is a contracted installation, the Army Reserve is utilizing space on an indefinite basis and it is not known how long they will be able to use space on the installation. The buildings do not meet the requirements of a constructed Army Reserve Center.

SANTA BARBARA, CALIF. ($136,000)

Assembly hall and two-bay maintenance shop.

Deficiencies of existing facility: Assembly hall and two-bay maintenance shop not authorized when facility was constructed. Space required to properly train reservists.

SAVANNAH, GA. ($259,000)

One-unit ARC with two-bay maintenance shop.

Deficiencies of existing facility: No municipal transportation; distance to city too great. Does not offer desired prestige to USAR program. No outdoor storage area for authorized equipment.

SPRINGFIELD, MO. ($73,000)

Five-bay maintenance shop.

Deficiencies of existing facility: Facility was transferred to the USAR and does not contain maintenance facilities. A maintenance shop is required for storage and maintenance of unit equipment.

UNIONTOWN, PA. ($220,000)

One-unit expansion, assembly hall, and three-bay maintenance shop. Deficiencies of existing facility: Existing USARC is inadequate for the requirements of assigned units. The assembly hall and maintenance shop are required for unit training and storage and maintenance of unit heavy equipment.

VALLEJO, CALIF. ($302,000)

One-unit ARC with 2-bay maintenance shop.

Deficiencies of existing facility: No maintenance facilities, insufficient vehicle parking, no offstreet parking for reservists. Due to lack of adequate storage and maintenance facilities, equipment required for unit training cannot be issued.

WASHINGTON, IOWA ($160,000)

One-unit (M) ARC with 1-bay maintenance shop.

Deficiencies of existing facility: The interior arrangement of both facilities is extremely poor and classrooms cannot be utilized effectively due to location and distracting influences. There are no

storage facilities and the shop and maintenance facilities are inadequate. The facilities are located in the downtown shopping area which precludes adequate parking space for reservists.

WASHINGTON, MO. ($160,000)

One-unit (M) ARC with 1-bay maintenance shop.

Deficiencies of existing facility: Present facility is too small and has insufficient classroom space which requires a split assembly of the unit. The building is difficult to heat and extremely noisy.

WASHINGTON, PA. ($136,000)

Assembly hall and 2-bay maintenance shop.

Deficiencies of existing facility: Assembly hall and maintenance shop not authorized with original construction. Now authorized and required for proper training.

WENATCHEE, WASH. ($168,000)

One-unit (M) ARC with 1-bay maintenance shop.

Deficiencies of existing facility: Building was formerly a bowling alley and as such its use is limited. The building is poorly ventilated and uncomfortable. There is no space inside or out for formations. Classrooms are poorly lighted. Parking facilities are not available.

WESTMINSTER, MD. ($160,000)

One-unit (M) ARC with 1-bay maintenance shop.

Deficiencies of existing facility: Present facility is old and in need of repairs. There is no rifle range, vault, or grease pit. Classroom. drill, maintenance, vehicle storage, and administrative space is inadequate. VARIOUS LOCATIONS ($1,788,000)