Hearings, Reports and Prints of the Senate Committee on Armed ServicesU.S. Government Printing Office, 1967 - Legislative hearings |
From inside the book
Results 1-5 of 100
Page 28
... increased over fiscal year 1967 and proposes new authorization in the total amount of $ 2,635,238,000 . Senator BIBLE . What is that substantial increase , Mr. Secretary In dollars how much is it over fiscal year 1967 ? You may develop ...
... increased over fiscal year 1967 and proposes new authorization in the total amount of $ 2,635,238,000 . Senator BIBLE . What is that substantial increase , Mr. Secretary In dollars how much is it over fiscal year 1967 ? You may develop ...
Page 36
... increase in the average unit cost based on overall increased construction costs ; ( 2 ) the elimination of statutory limitations relating to costs to the 5 - foot line which we believe are no longer required because of other controls ...
... increase in the average unit cost based on overall increased construction costs ; ( 2 ) the elimination of statutory limitations relating to costs to the 5 - foot line which we believe are no longer required because of other controls ...
Page 39
... increase on warehousing as set forth in section 806. This appears to be about a 12 - percent increase , which is in line , I believe , with build- ing cost increases since 1962 . Mr. IGNATIUS . This is the reason we are requesting an ...
... increase on warehousing as set forth in section 806. This appears to be about a 12 - percent increase , which is in line , I believe , with build- ing cost increases since 1962 . Mr. IGNATIUS . This is the reason we are requesting an ...
Page 143
... increased workload . If the workload did not increase , we would prob- ably reduce employees . But as an example of direct labor savings , there will be - once constructed and occupied - a direct labor savings of $ 1.164.413 , simply by ...
... increased workload . If the workload did not increase , we would prob- ably reduce employees . But as an example of direct labor savings , there will be - once constructed and occupied - a direct labor savings of $ 1.164.413 , simply by ...
Page 151
... increase the size of the dependent school because the number of children has increased and is continuing to increase . Senator JACKSON . What is the tour for those that do not take their families ? There is an option ? Colonel PURPLE ...
... increase the size of the dependent school because the number of children has increased and is continuing to increase . Senator JACKSON . What is the tour for those that do not take their families ? There is an option ? Colonel PURPLE ...
Other editions - View all
Common terms and phrases
A. P. Hill addition adequate administrative facilities Admiral GRALLA Admiral HUSBAND Air Force Base aircraft amount authorization bachelor officers barracks bill building Calif Center Chairman Colonel FENLON Command committee CURTIN DALRYMPLE deficiency Depot engine enlisted equipment estimated cost existing facilities family housing fiscal year 1968 Fort Polk hospital improvements increase installation item provides item will provide JARBOE laboratory line item proposes located maintenance facilities Marine Corps ment military construction million missile mission Naval Air Station Navy needed North Dakota Oahu Operational facilities personnel piers plant Port Chicago present REED replacement requested second line item Senator BIBLE Senator CANNON Senator ELLENDER Senator JACKSON Senator THURMOND Senator YOUNG sewage treatment Southeast Asia space squadron square feet storage substandard supply facilities tactical tion training facilities troop housing U.S. Air Force U.S. Army units utilities World War II YOUNG of North
Popular passages
Page 4 - Force missions, new weapons developments, new and unforeseen research and development requirements, or improved production schedules, if the Secretary of Defense determines that deferral of such construction for inclusion in the next military construction authorization Act would be inconsistent with interests of national security, and in connection therewith to acquire, construct, convert, rehabilitate, or install permanent or temporary public works, including land acquisition, site preparation,...
Page 9 - Rico for assignment as public quarters to military personnel and their dependents, If any, without rental charge, upon a determination by the Secretary of Defense, or his designee, that there is a lack of adequate housing facilities at or near such military installations.
Page 4 - The funds so made available may be expended to acquire, construct, convert, rehabilitate, or install permanent or temporary public works, including land acquisition, site preparation, appurtenances, utilities, and equipment.
Page 4 - ... acquiring, constructing, converting, rehabilitating, or installing permanent or temporary public works, including land acquisition, site preparation, appurtenances, utilities, and equipment in the total amount of $110,744,000.
Page 548 - The next base to be considered is Moody Air Force Base located 10 miles northeast of Valdosta, Ga. This base supports the undergraduate pilot training. The program requested amounts to $875,000.
Page 6 - The Secretary of Defense, or his designee, is authorized to construct, at the locations hereinafter named, family housing units and trailer court facilities in the numbers hereinafter listed, but no family housing construction shall be commenced at any such locations in the United States, until the Secretary shall have consulted with the Secretary, Department of Housing and Urban Development, as to the availability of adequate private housing at such locations.
Page 59 - Of this amount, $11.1 million is for the control of air pollution and $17.9 million for the control of water pollution. All of the latter projects are based on the recommendations of the Federal Water Pollution Control Administration of the Department of the Interior.
Page 531 - The ninth item is for the conversion of a portion of a building built in 1963 to house one large- and two medium-scale computers and the Defense Automatic Addressing System Office. The tenth project is for the installation of fire protection system to protect the base Autodin center. NEWARK AIR FORCE STATION, OHIO The fifth base is Newark Air Force Station located 4 miles southwest of Newark and 30 miles east of Columbus, Ohio. It supports the Air Force Logistics Command inertial guidance/calibration...
Page 386 - The first project is at the Naval Communication Station, Honolulu, Oahu. It consists of two line items at the estimated cost of $412,000. One of the items, for $42,000, is classified and is included in section 202. The unclassified line item is for construction of a barracks at the estimated cost of $370,000. This station has a requirement to berth 640 men. Existing facilities consist of 530 adequate spaces and 32 substandard spaces in a building beyond economical repair. This line item will provide...