(2) The activities will not be unduly harmful to aquatic life in the area; result in pollution; create hazardous or unsafe conditions; unreasonably interfere with other uses of the area; or disturb any site, structure, or object of historical or archaeological significance; and

(3) The person conducting the activities or operating the vessel from which the activities are to be conducted has consulted and coordinated the conduct of those activities with any other users of the area.

(d) The Director may orally approve plan revisions or issue emergency permits to accommodate unforeseen or special circumstances. Oral approvals given for a written application shall be followed with a written confirmation by MMS. In the event an oral approval is given in response to an oral request, the applicant shall confirm the oral request in writing within 72 hours of the approval.

[blocks in formation]

(iii) A description and a map of the area(s) covered by the application;

(iv) The period of time to be covered by the primary term of the permit not to exceed years;

(v) A narrative description in nonproprietary terms of the activities to be conducted, such as mapping, geophysical surveying, drilling, bottom sampling, and dredging;

(vi) A detailed description and schedule giving the estimated starting and completion dates for the proposed activities that are to be authorized under the permit; and

(vii) A prospecting plan.

(2) An applicant for a prospecting permit shall indicate which data and information included in the application and plan the applicant considers proprietary.

(c) Upon application submitted by a permittee pursuant to this section, the Director may approve the conversion of a permit issued under part 251 of this title to a permit issued under this part. A permit issued under part 251, which is converted to a permit issued under this part, shall be subject to all the requirements of this part.

(d) An application for a permit to conduct scientific research activities shall be submitted in a form approved by the Director. The application should be signed by an officer of the organization proposing to carry out the activity and shall state

(1) The name of the person conducting the proposed research;

(2) The type of research activity and manner in which it will be conducted;

(3) The location designated on a map, plat, or chart where the research activity will be conducted;

(4) A schedule indicating the starting and completion dates for each proposed scientific research activity;

(5) The proposed time and manner in which the information and data resulting from the research will be made available to the public for inspection and reproduction, such time being the earliest practicable time;

(6) An agreement that the information and data resulting from the scientific research activity will not be sold or withheld for exclusive use;

(7) The name, registry number, registered owner, and port of registry of vessels used in the operation; and

(8) A scientific research plan.

(e) Within 30 days following the receipt of an application for a permit and the accompanying plan which does not require preparation of an environmental analysis the Director shall

(1) Approve the application and plan; (2) Require the applicant to modify the application and/or plan; or

(3) Disapprove the application and plan. If the Director disapproves an application and plan, the statement of rejection shall give the reasons for the disapproval and shall advise the applicant of the changes needed to obtain approval.

§ 280.6 Prospecting or scientific research plan.

(a) The applicant shall submit a plan with its application for a prospecting or scientific research permit. The plan shall include

(1) Identification of the mineral(s) or material(s) of primary interest, if appropriate;

(2) A detailed description of the activities to be conducted;

(3) The type(s) of equipment to be used with special attention to safety and pollution prevention and control features and the name, registration, and mobile communication system of vessel(s);

(4) Maps showing location of proposed activities including drill holes, grab or basket samples, anticipated depth of penetration of drill holes, water depth, and location of proposed survey grids for each surveying method which is to be employed;

(5) A schedule indicating the starting and completion dates for each proposed activity;

(6) Anticipated environmental consequences of each proposed activity;

(7) Mitigation measures to be used to avoid or minimize adverse environmental impacts of proposed activities;

(8) For any activities which are to occur in an environmentally sensitive area, a plan for monitoring the effects of the activities on the environment;

(9) Any known archaeological resources in the area of the proposed activities; and

(10) Description of any potential conflicts with other uses or users in the permit area.

(b) If the penetration of one or more proposed drill holes will exceed 300 feet, the Director may require a drilling plan to be included as part of the plan before a permit is issued.

(c) If all needed information is not available at the time the plan is submitted, a plan shall indicate when the needed information will be obtained and submitted. In such a case, depending on the significance of the missing information, the Director may disapprove the plan, approve the plan based on the information submitted, or approve the plan with a specific condition that certain specified activities are not authorized and shall not be conducted until additional information is obtained and submitted for evaluation, and the Director gives specific approval to proceed with those activities. § 280.7 Obligations of persons.

[blocks in formation]

$280.8 Reporting.

(a) The permittee shall submit a status report to the Director within 30 days of the close of each calendar quarter or more frequently if requested by the Director. The report shall include a summary of the prospecting or scientific research activities conducted prior to the end of the reporting period and the results obtained. The last quarterly report may be combined with the final report if the final report is submitted within 30 days after the end of the last quarter in which permitted activity occurs. Each permittee shall submit to the Director a final report of activities conducted under the permit within 6 months after expiration of the permit or after the completion of prospecting or scientific research activities, or 60 days prior to a planned lease offering when prospecting or scientific research activities are within the planned leasing area, whichever is sooner, provided that no report shall be required less than 30 days after completion of permitted activities. The report shall include—

(1) A description of the work performed;

(2) Charts, maps, or plats depicting the area and blocks in which any activities were conducted specifically, identifying the lines of geophysical traverses and/or the locations where geological activity was conducted;

(3) The dates on which the actual activities were performed;

(4) A narrative summary of any mineral occurrences encountered including location, environmental features, and the nature and degree of adverse effects, if any, of the permitted activities on the environment, aquatic life, archaeological resources, or other uses of the area in which the activities were conducted;

(5) A report of the results of the environmental monitoring required in § 280.6(a)(8) of this part; and

(6) Such other descriptions of the activities conducted as may be specified by the Director.

(b) All persons shall immediately notify the Director of all serious accidents, any death or serious injury, or fire or explosion connected with any activity conducted pursuant to this part.

§ 280.9 Recordkeeping.

(a) Any permittee who acquires rock and mineral samples under a permit shall keep for 1 year after submittal of the final report a representative split of each geological sample and a quarter longitudinal segment of each core which shall be available for inspection at the convenience of the Director who may cut such core and geological samples for retention by MMS.

(b) Any permittee who acquires G&G data and information under a permit shall keep the data and information available for 3 years after submittal of the final report. The data and information shall be available for inspection and copying at a location within the appropriate OCS Region or at another location approved by the Director. The records shall include environmental data and information; G&G data and information; drill logs; analyses of cores, cuttings, and samples; and maps and navigation tapes showing the location where samples were taken and test drilling conducted.

§ 280.10 Environmental effects.

The potential of proposed prospecting or scientific research activities for adverse impact on the environment will be evaluated by MMS to determine the The need for mitigation measures. MMS anticipates that activities of the type listed below typically will not cause significant environmental impact and, in accordance with 516 DM 6, Appendix 10 to the Departmental Manual, will normally be categorically excluded from additional environmental analysis. The types of activities include

(a) Gravity and magnetometric observations and measurements;

(b) Bottom and subbottom acoustic profiling or imaging without the use of explosives;

(c) Mineral sampling of a limited nature such as that using either test drillholes or cores to less than 300 feet below the seafloor;

(d) Water and biotic sampling, if the sampling does not adversely affect shellfish beds, marine mammals, or an endangered species or if permitted by the National Marine Fisheries Service or another Federal Agency;

[blocks in formation]

(a) The Governor(s) of adjacent State(s) shall be notified by the Director with a copy of the application for a permit with the accompanying plan immediately upon the submission of an application for approval.

(b) In cases where an environmental assessment is to be prepared, the Director will invite the Governor(s) of adjacent States(s) to review and provide comments regarding the proposed activities. The Director's invitation to provide comments shall allow the Governor a specified period of time to comment.

(c) The Director shall notify Federal Agencies, as appropriate, with a copy of the application for a permit with the accompanying plan immediately upon the submission of the application for approval.

§ 280.12 Disclosure of information to the public.

(a) The Director shall make data, information, and samples available in accordance with the requirements and subject to the limitations of the Act, the Freedom of Information Act (5 U.S.C. 552), and the implementing regulations.

(b) For geological data, information, and samples and geophysical information submitted under a permit and retained by MMS, the Director shall make such data, information, and samples available to the public 25 years after the date of submission of the data and information or such earlier time as may be agreed to by the permittee who

provides the data or information. Geophysical data submitted under a permit and retained by MMS shall be made available to the public by the Director 50 years after the date of submission to MMS unless an earlier date is agreed to by the permittee who submits the data.

(c) The Director reserves the right to disclose any data, information, or samples submitted by a permittee to an independent contractor or agent for the purpose of reproducing, processing, reprocessing, or interpreting the data or information. Such contractor or agent shall be subject to the same limitations on disclosure of data, information, and samples as those applicable to the Director under paragraph (b) of this section.

§ 280.13 Disclosure of data and information to the adjacent States.

(a) Proprietary data, information, and samples submitted to MMS by permittees shall be made available to adjacent State(s) upon request by the Governor(s) in accordance with paragraphs (b), (c), and (d) of this section.

(b) Disclosure shall occur only after the Governor has entered into an agreement with the Secretary providing that

(1) The confidentiality of the information shall be maintained;

(2) In any action commenced against the Federal Government or the State for the failure to protect the confidentiality of proprietary information, the Federal Government or the State, as the case may be, may not raise as a defense any claim of sovereign immunity or any claim that the employee who revealed the proprietary information, which is the basis of the suit, was acting outside the scope of the person's employment in revealing the information;

(3) The State agrees to hold the United States harmless for any violation by the State or its employees or contractors of the agreement to protect the confidentiality of proprietary data and information and samples; and (4) The materials containing the proprietary data, information, and samples shall remain the property of the United States.

(c) The data, information, and samples available to the State(s) pursuant

to an agreement shall be related to leased lands.

(d) The materials containing the proprietary data, information, and samples shall be returned to MMS when they are no longer needed by the State or when requested by the Director.

§ 280.14 Suspension or temporary prohibition of activities.

The Director may suspend or temporarily prohibit the conduct of G&G prospecting or scientific research activities by notifying the person conducting the activity, either orally or in writing, when the Director determines that there is a threat of serious, irreparable, or immediate harm or damage to life (including fish and other aquatic life), property, any mineral (in areas leased or not leased), the national security or defense, or the marine, coastal, or human environment; or there is a failure to comply with a provision of the Act or of any applicable law, the provisions of the permit, or provisions of these and other applicable regulations. Such suspension or temporary prohibition shall be effective immediately upon receipt of the notice. Suspensions or temporary prohibitions issued orally shall be followed by a written notice confirming the action, and all written notices will be sent by certified or registered mail. A suspension or temporary prohibition shall remain in effect until the basis for the suspension or temporary prohibition has been corrected to the satisfaction of the Director.

[blocks in formation]
[blocks in formation]

Subpart B-Leasing Procedures

281.11 Unsolicited request for a lease sale. 281.12 Request for OCS mineral information and interest.

281.13 Joint State/Federal coordination.

OCS mining area identification.
Tract size.

281.14

281.15

281.16

Proposed leasing notice.

281.17

Leasing notice.

281.18

Bidding system.

281.19

Lease term.

281.20

281.21

Award of leases.

281.22 281.23

Lease form.

Submission of bids.

Effective date of leases.

Subpart C-Financial Considerations

281.26

Payments.

281.27 Annual rental. 281.28 Royalty.

194-113 D-01--17