Page images
PDF
EPUB
[blocks in formation]

B. Equipment associated with this project which will be provided from other appropriations: None

JOINT USE CERTIFICATION:

The Regional Commander certifies that this project has been considered for joint use potential. Unilateral Construction is recommended. This is an installation utility/infrastructure project and does not qualify for joint use at this location, however, all tenants on this installation are benefited by this project.

Activity POC: Perry Johnson Lead Engineer

Phone No: 850-452-4515 X386 DSN 922

DD

[blocks in formation]
[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Provide support on east coast for the operational TRIDENT system of submarines and long range missiles, including processing capability for assembly and disassembly of both explosive and non-explosive components of the TRIDENT II (D-5) missile.

11. Outstanding Pollution and Safety Deficiencies ($000):

a. Pollution Abatement (*): $0

b. Occupational Safety and Health (OSH) (#): $ 0

DD

[blocks in formation]
[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

(30)

EQUIPMENT FROM OTHER APPROPRIATIONS (NON ADD) 10.Description of Proposed Construction

This project provides emergency backup power and associated utility system and site improvements for security of the Kings Bay Restricted Waterfront Area (RWA). A bullet resistant structure will be constructed to house a 1,250 KW emergency generator and a 1,250 KW backup emergency generator, and a climate controlled space for all required switchgear and Generator controls. The project will include a walled courtyard, engine mufflers, cooling system, and emergency fuel storage on pile foundation. Distribution of emergency power will be by underground feeders with secure manholes and bullet resistant above ground structures. Site improvements include an aggregate surface access roadway, paved parking and fuel loading areas, and stormwater drainage features. Sustainable design will be integrated into the design, development, and construction of the project in accordance with Executive Order 13123 and other directives.

[blocks in formation]

This project constructs a hardened, secure, emergency power source and distribution
system at the Submarine Base Kings Bay Restricted Waterfront Area (RWA).
(Current Mission)

[blocks in formation]

LS

1391

Submitted to Congress

Page No.

83

[blocks in formation]

Chief of Naval Operations Instruction (OPNAVINST) 5530.14C, Change 2 establishes SUBASE Kings Bay, GA and SUBASE Bangor, WA as the Navy's highest priority for the security of waterfront assets. 5530.14C requires a secure emergency power source to be located within the restricted area. DOD C5210.41-M requires the secure emergency power source to have 100% backup. Adequate emergency power is rrequired for Waterfront Reaction Force Facilities and RWA security lighting, security sensors, and control/reporting systems.

CURRENT SITUATION:

Strategic and waterfront security requirements are not met. The existing Public Utility Power and Kings Bay Backup Power sources do not provide secure emergency power in accordance with OPNAVINST 5530.14C and DoD C5210.41-M.

IMPACT IF NOT PROVIDED:

The requirements of OPNAVINST 5530.14C and DoD C5210.41-M will not be satisfied. The Submarine Base Kings Bay Restricted Waterfront Area will remain at increased risk.

[blocks in formation]

Form 1 Dec 76

1391 C

Submitted to Congress

Page No.

84

[blocks in formation]

B. Equipment associated with this project which will be provided from other appropriations:

[blocks in formation]

The Installation Management Claimant certifies that this project has been considered for joint use potential. Unilateral Construction is recommended. This is an installation utility/infrastructure project and does not qualify for joint use at this location, however, all tenants on this installation are benefited by this project.

[blocks in formation]

Phone No: 202/764-1558

1391 C

[blocks in formation]
« PreviousContinue »