B. Equipment associated with this project which will be provided from other appropriations:

082007

[blocks in formation]

The Regional Commander certifies that this project has been considered for joint use potential. Unilateral Construction is recommended. Mission requirements, operational considerations, and location are incompatible with use by other components.

[blocks in formation]

Phone No: 202/764-1558

1391 C

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][subsumed][merged small][subsumed][merged small][subsumed][merged small][merged small][subsumed][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Constructs a steel-framed, metal insulated paneled wall, addition to the Motor Transfer Facility with concrete spread footers on engineered fill. The addition will have powered doors, lighting, and a fire alarm and sprinkler system. Upgrades the existing Motor Transfer Facility by providing insulated steel paneled walls, additional lighting, and a fire alarm and sprinkler system. The new addition and existing structure will be provided with a heating ventilating and air conditioning (HVAC) system and a new reinforced concrete mechanical room. The mechanical room will house the HVAC system and will also be equipped with a built-in air compressor to operate existing missile motor handling equipment. Work will be conducted in the very high security SWFPAC Limited Area, and this will impact costs due to the requirement to pass through security screening prior to entrance and exit, the requirement to furnish escorts, the loss of time due to security and operational drills, and the requirement to keep the existing Limited Area in operation during construction. Special costs include seismic provisions, special concrete tolerances for air pallet operations and large power operated doors. Built in equipment includes an air compressor and HVAC equipment.

Anti-terrorism/Force Protection standards will be integrated into the design, development, and construction of the project in accordance with current standards. The sustainable design features will be included in the design, development and

[blocks in formation]
[blocks in formation]
[blocks in formation]

construction for the project in accordance with Executive Order 13123 and other laws and executive orders.

[blocks in formation]

This project constructs an addition to the Motor Transfer Facility, encloses the existing facility to allow all-weather movement of TRIDENT II (D5) missile motors, and increases physical security.

(Current Mission)

REQUIREMENT:

An all-weather facility is required to receive and ship TRIDENT II (D5) missile motors. The existing facility has proven inadequate to safely process missile motors in the rainy conditions that exist at SWFPAC Bangor, WA. The through-put of missile motors has significantly increased, exacerbating the problem.

CURRENT SITUATION:

Missile motors that cannot be received because of rainy weather conditions are stored in a temporary railcar holding area. This area is highly exposed and subjects the explosive motors to a high degree of risk from terrorist activities during the storage period. In addition, the railcar environmental control systems are not designed for extended use, increasing the risk of damaged missile motors.

IMPACT IF NOT PROVIDED:

The TRIDENT mission performance at SWFPAC will continue to be exposed to unnecessary risk.

[blocks in formation]

1 Dec 76

1391 C

082003

012005

092005

2%

35%

Design Bid Build

Yes

Yes

Submitted to Congress

[blocks in formation]
[blocks in formation]

B. Equipment associated with this project which will be provided from other appropriations: None

JOINT USE CERTIFICATION:

No

N/A

$200

$150

$50

$200

$125

$75

112005

122005

082007

The Regional Commander certifies that this project has been considered for joint use potential. Unilateral Construction is recommended. Mission requirements, operational considerations, and location are incompatible with use by other components.

[blocks in formation]

Phone No: 202/764-1558

1391 C

[blocks in formation]
[blocks in formation]

DD

Construct a reinforced concrete, underground, multi-level re-entry body processing and storage facility. This facility includes a reinforced concrete foundation, hardened floors, and hardened load-bearing walls and roof. The existing Limited Area (LA) perimeter security zone and patrol roads will be expanded to encompass the new LAPSC. Portions of the existing LA perimeter will be demolished to provide new access roads. New security guard towers will be constructed. Work will be conducted in the very high security Strategic Weapons Facility Pacific (SWFPAC) Limited Area. Anti-Terrorism/Force Protection features are included.

Built-in equipment includes adjustable dock levelers, seven 2-ton bridge crane supports and three elevators. Special costs include seismic construction, structural excavation, special foundations and blast features, earth cover, lightweight concrete weapons