runways and taxiways are concrete and/or asphalt. Runway 10-28 is 8,000 feet long, 200 feet wide with maximum wheel load of 57,500 pounds; runway 04-22 is 8,750 feet long, 150 feet wide with maximum wheel load of 57,500 pounds; and runway 17-35 is 4,820 feet long, 150 feet wide with maximum wheel load of 14,700 pounds.

(2) Parking Areas and Hangar Space. No hangar space is available. However, limited concrete parking ramp space is available as directed by the control tower.

(3) Control Tower. This control tower is normally in operation from 0630 to 1830 local time, Monday through Friday, excluding Federal holidays. The tower may be contacted on 126.5 MHz or 394.3 MHz. When the tower is in operation, FAA regulations pertaining to the operation of aircraft at airports with an operating tower (§ 91.87 of this title) will apply. When the tower is not in operation, all aircraft operations will be handled by Wallops UNICOM on the tower frequency, and FAA regulations pertaining to the operation of aircraft at airports without an operating control tower (§ 91.89 of this title) will apply. In addition to Federal Aviation Regulations (FAR's) (s 91 of this title), Wallops requires that pilots obtain clearances from the Wallops UNICOM before landings, takeoffs, and taxiing. Civil aircraft operations are normally confined to daylight hours.

(4) Navigation Aids. All runways, 04-22, 10-28, and 17-35 are lighted. Both active taxiways, parallels 04-22 and 10-28, are lighted. Airfield lighting is available upon request. All runway approaches are equipped with operating precision approach path indicator (PAPI) systems and are available on request. All airfield obstructions are equipped with red obstruction lights.

(5) Hazards. Numerous towers in airport vicinity up to 241 feet above ground level. Existing tree obstructions are located 1500 feet west of runway 10 threshold. High shore bird population exists in the Wallops area. Deer occasionally venture across runways. Light-controlled traffic crossovers are in existence. Potential radio frequency (RF) hazards exist from

tracking radars. Hazards involving aircraft and rocket launch operations exist when Restricted Area R-6604 is active.

(6) Emergency Equipment. Aircraft rescue and fire-fighting equipment is normally available on a continuous basis.

(c) Other Facilities. No facilities or services other than those described above are available except on an individual emergency basis to any user.

(d) Status of Facilities. Changes to the status of the KSC and WFF facilities will be published in appropriate current FAA aeronautical publications.

§ 1204.1404 Requests for use of NASA airfield facilities.

(a) Request for use of a NASA airfield, whether on a one time or recurring basis, must be in writing and addressed to the appropriate NASA facility, namely:

(1) Shuttle Landing Facility. Director of Center Support Operations, John F. Kennedy Space Center, Kennedy Space Center, Florida 32899.

(2) Wallops Airport. Director of Suborbital Projects and Operations, Goddard Space Flight Center, Wallops Flight Facility, Wallops Island, Virginia 23337.

(b) Such requests will:

(1) Fully identify the prospective user and aircraft.

(2) State the purpose of the proposed use and the reason why the use of the NASA airfield is proposed rather than a commercial airport.

(3) Indicate the expected annual use, to include number and approximate date(s) and time(s) of such proposed

use.

(4) State that the prospective user is prepared to fully comply with the terms of this Subpart 14 and the use permit which may be issued.

(c) Upon receipt of the written request for permission to use the airport, the NASA official designated by each facility will request additional information, if necessary, and forward both this regulation and the required Hold Harmless Agreement for execution by the requestor or forward,

where appropriate, a denial of the request.

(d) The signed original of the Hold Harmless Agreement shall be returned to the designated NASA official, and a copy retained in the aircraft at all times. Such copy shall be exhibited upon proper demand by any designated NASA official.

(e) At the same time that the prospective user returns the executed original of the Hold Harmless Agreement, the user shall forward to the designated NASA official the required Certificate of Insurance and waiver of rights to subrogation. Such certificate shall evidence that during any period for which a permit to use is being requested, the prospective user has in force a policy of insurance covering liability in amounts not less than those listed in the Hold Harmless Agreement.

(f) When the documents (in form and substance) required by paragraphs b through e of this section have been received, they will be forwarded with a proposed use permit to the approving authority for action.

(g) The designated NASA official will forward the executed use permit or notification of denial thereof to the prospective user after the approving authority has acted.

§ 1204.1405 Approving authority.

The authority to establish limitations and procedures for use of a NASA airfield, as well as the authority to approve or disapprove the use of the NASA airfield facilities subject to the terms and conditions of this subpart and any supplemental rules or procedures established for the facility is vested in:

(a) Shuttle Landing Facility. Director of Center Support Operations, Kennedy Space Center, NASA.

(b) Wallops Airport. Director of Suborbital Projects and Operations, Goddard Space Flight Center, Wallops Flight Facility, NASA.

§ 1204.1406 Procedures in the event of a declared in-flight emergency.

(a) Any aircraft involved in a declared in-flight emergency that endangers the safety of its passengers and aircraft may land at a NASA airfield.

In such situations, the requirements for this subpart for advance authorizations, do not apply.

(b) NASA personnel may use any method or means to clear the aircraft or wreckage from the runway after a landing following an in-flight emergency. Care will be taken to preclude unnecessary damage in so doing. However, the runway will be cleared as soon as possible for appropriate use.

(c) The emergency user will be billed for all costs to the Government that result from the emergency landing. No landing fee will be charged, but the charges will include the labor, materials, parts, use of equipment, and tools required for any service rendered under these circumstances.

(d) In addition to any report required by the Federal Aviation Administration, a complete report covering the landing and the emergency will be filed with the airfield manager by the pilot or, if the pilot is not available, any other crew member or passenger.

(e) Before an aircraft which has made an emergency landing is permitted to take off (if the aircraft can and is to be flown out) the owner or operator thereof shall make arrangements acceptable to the approving authority to pay any charges assessed for services rendered and execute a Hold Harmless Agreement. The owner or operator may also be required to furnish a certificate of insurance, as provided in § 1204.1404, covering such takeoff.

§ 1204.1407 Procedure in the event of an unauthorized use.

Any aircraft not operated for benefit of the Federal Government which lands at a NASA airfield facility without obtaining prior permission from the approving authority, except in a bona fide emergency, is in violation of this subpart. Such aircraft will experience delays while authorization for departure is obtained pursuant to this subpart and may, contrary to the other provisions of this subpart, be required, at the discretion of the approving authority, to pay a user fee of not less than $100. Before the aircraft is permitted to depart, the approving authority will require full compliance

with this Subpart 1204.14, including the filing of a complete report explaining the reasons for the unauthorized landing. Violators could also be subject to legal liability for unauthorized use. When it appears that the violation of this subpart was deliberate or is a repeated violation, the matter will be referred to the Aircraft Management Office, NASA Headquarters, which will then grant any departure authorization.

Subpart

15-Intergovernmental

Review of National Aeronautics and Space Administration Programs and Activities

AUTHORITY: E.O. 12372, July 14, 1982, 47 FR 30959, as amended April 8, 1983, 48 FR 15887; sec. 401 of the Intergovernmental Cooperation Act of 1968, as amended (31 U.S.C. 6506).

SOURCE: 48 FR 29340, June 24, 1983, unless otherwise noted.

EDITORIAL NOTE: For additional information, see related documents published at 47 FR 57369, December 23, 1982, 48 FR 17101, April 21, 1983, and 48 FR 29096, June 24, 1983.

[blocks in formation]

(a) The regulations in this part implement Executive Order 12372, "Intergovernmental Review of Federal Programs," issued July 14, 1982, and amended on April 8, 1983. These regulations also implement applicable provisions of section 401 of the Intergovernmental Cooperation Act of 1968, as amended.

(b) These regulations are intended to foster an intergovernmental partnership and a strengthened federalism by relying on state processes and on state, areawide, regional and local coordination for review of proposed direct Federal development.

(c) These regulations are intended to aid the internal management of the Agency, and are not intended to create any right or benefit enforceable at law by a party against the agency or its officers.

[blocks in formation]

Order means Executive Order 12372, issued July 14, 1982, and amended April 8, 1983, and titled "Intergovernmental Review of Federal Programs."

Administrator means the Administrator of the U.S. National Aeronautics and Space Administration or an official or employee of the Agency acting for the Administrator under a delegation of authority.

State means any of the 50 states, the District of Columbia, the Commonwealth of Puerto Rico, the Commonwealth of the Northern Mariana Islands, Guam, American Samoa, the U.S. Virgin Islands, or the Trust Territory of the Pacific Islands.

§ 1204.1503 Programs and activities subject to these regulations.

The Administrator publishes in the FEDERAL REGISTER a description of the Agency's programs and activities that are subject to these regulations.

§ 1204.1504 [Reserved]

§ 1204.1505 Federal interagency coordination.

The Administrator to the extent practicable, consults with and seeks advice from all other substantially affected federal departments and agencies in an effort to assure full coordination between such agencies and the Agency regarding programs and activities covered under these regulations.

§ 1204.1506 Procedures for selecting programs and activities under these regulations.

(a) A state may select any program or activity published in the FEDERAL REGISTER in accordance with § 1204.1503 of this part for intergovernmental review under these regulations. Each state, before selecting programs and activities shall consult with local elected officials.

(b) Each state that adopts a process shall notify the Administrator of the Agency's programs and activities selected for that process.

(c) A state may notify the Administrator of changes in its selections at any time. For each change, the state shall submit to the Administrator an assurance that the state has consulted

with local elected officials regarding the change. The Agency may establish deadlines by which states are required to inform the Administrator of changes in their program selections.

(d) The Administrator uses a state's process as soon as feasible, depending on individual programs and activities, after the Administrator is notified of its selections.

§ 1204.1507 Communicating with State and local officials concerning the Agency's programs and activities.

(a) For those programs and activities covered by a state process under § 1204.1506 the Administrator, to the extent permitted by law:

(1) Uses the official state process to determine views of state and local elected officials; and;

(2) Communicates with state and local elected officials, through the official state process, as early in a program planning cycle as is reasonably feasible to explain specific plans and actions.

(b) The Administrator provides notice to directly affected state, areawide, regional, and local entities in a state of proposed direct Federal development if:

(1) The state has not adopted a process under the Order; or

(2) The development involves a program or activity not selected for the state process.

This notice may be made by publication in a periodical of general circulation in the area likely to be affected or other appropriate means, which the Agency in its discretion deems appropriate.

§ 1204.1508 Time limitations for receiving comments on proposed direct Federal development.

(a) Except in unusual circumstances, the Administrator gives state processes or state, areawide, regional and local officials and entities at least 60 days from the date established by the Administrator to comment on proposed direct Federal development.

(b) This section also applies to comments in cases in which the review, coordination, and communication with the Agency has been delegated.

§ 1204.1509 Receiving and responding to comments.

(a) The Administrator follows the procedures in § 1204.1510 if:

(1) A state office or official is designated to act as a single point of contact between a state process and all federal agencies; and

(2) That office or official transmits a state process recommendation for a program selected under § 1204.1506.

(b)(1) The single point of contact is not obligated to transmit comments from state, areawide, regional or local officials and entities where there is no state process recommendation.

(2) If a state process recommendation is transmitted by a single point of contact, all comments from state, areawide, regional, and local officials and entities that differ from it must also be transmitted.

(c) If a state has not established a process, or is unable to submit a state process recommendation, state, areawide, regional and local officals and entities may submit comments to the Agency.

(d) If a program or activity is not selected for a state process, state, areawide, regional and local officials and entities may submit comments to the Agency. In addition, if a state process recommendation for a nonselected program or activity is transmitted to the Agency by the single point of contact, the Administrator follows the procedures of § 1204.1510 of this part.

(e) The Administrator considers comments which do not constitute a state process recommendation submitted under these regulations and for which the Administrator is not required to apply the procedures of § 1204.1510 of this part, when such comments are provided by a single point of contact, or directly to the Agency by a commenting party.

§ 1204.1510 Efforts to accommodate intergovernmental concerns.

(a) If a state provides a state process recommendation to the Agency through its single point of contact, the Administrator either:

(1) Accepts the recommendation;

(2) Reaches a mutally agreeable solution with the state process; or

(3) Provides the single point of contact with a written explanation of its decision, in such form as the Administrator in his or her discretion deems appropriate. The Administrator may also supplement the written explanation by providing the explanation to the single point of contact by telephone, other telecommunication, or other means.

(b) In any explanation under paragraph (a)(3) of this section, the Administrator informs the single point of contact that:

(1) The Agency will not implement its decision for a least ten days after the single point of contact receives the explanation; or

(2) The Administrator has reviewed the decision and determined that, because of unusual circumstances, the waiting period of at least ten days is not feasible.

(c) For purposes of computing the waiting period under paragraph (b)(1) of this section, a single point of contact is presumed to have received written notification five days after the date of mailing of such notification.

§ 1204.1511 Coordination in interstate situations.

(a) The Administrator is responsible for

(1) Identifying proposed direct Federal development that has an impact on interstate areas;

(2) Notifying appropriate officials and entities in states which have adopted a process and which select the Agency's program or activity.

(3) Making efforts to identify and notify the affected state, areawide, regional, and local officials and entities in those states that have not adopted a process under the Order or do not select the Agency's program or activity;

(4) Responding pursuant to § 1204.1510 of this part if the Administrator receives a recommendation from a designated areawide agency transmitted by a single point of contact, in cases in which the review, coordination, and communication with the Agency have been delegated.

(b) The Administrator uses the procedures in § 1204.1510 if a state process provides a state process recommendation to the Agency through a single point of contact.

§ 1204.1512 [Reserved]

§ 1204.1513 Waivers of provisions of these regulations.

In an emergency, the Administrator may waive any provision of these regulations.

APPENDIX A TO PART 1204-ITEMS TO COVER IN MEMORANDA OF AGREEMENT

The items to be covered in Memoranda of Agreement between NASA Installations and state and areawide OMB Circular A-95 clearinghouses for coordinating NASA and civilian planning:

1. Clearinghouses will be contacted at the earliest practicable point in project planning. Generally, this will be during the preparation of Preliminary Engineering Reports, or possibly earlier if meaningful information is available that could practically serve as an input in the decision-making process. It should be noted that clearinghouses are generally comprehensive planning agencies. As such, they are often the best repositories of information required for development planning and constitute a resource that can often save Federal planners substantial time and effort, if consulted early enough. In addition to providing information necessary for preliminary engineering, clearinghouses can make useful inputs to the development of environmental impact statements, as well as in reviewing draft statements. Thus, consultation at the earliest stage in planning can have substantial payoffs in installation development.

2. Clearinghouses will be afforded a minimum time of 30 days in which to review and comment on a proposed project and a maximum time of 45 days in which to complete such review.

3. The minimum information to be provided to the clearinghouse will consist of project description, scope and purpose, summary technical data, maps and diagrams where relevant, and any data which would show the relationship of the proposed project or action to applicable land use plans, policies, and controls for the affected area.

4. Establish procedures for notifying clearinghouses of the actions taken on projects, such as implementation, timing, postponement, abandonment, and explaining, where