Page 14
... produce the desired distribution of stress throughout the whole section of the dam . ( c ) The controlled concrete temperatures in the ultimate step which are to be used in the stress analysis , will be determined from temperature ...
... produce the desired distribution of stress throughout the whole section of the dam . ( c ) The controlled concrete temperatures in the ultimate step which are to be used in the stress analysis , will be determined from temperature ...
Page 55
... production must be expanded by some 50 percent , or the equivalent of 312 million acres , by 1975. This can be met only by shifts in acreage of cultivated crops to concentrate on the more productive , increasing per - acre production ...
... production must be expanded by some 50 percent , or the equivalent of 312 million acres , by 1975. This can be met only by shifts in acreage of cultivated crops to concentrate on the more productive , increasing per - acre production ...
Page 68
... production . Water would be obtained from the existing Fern Ridge Reservoir . Report scheduled for completion in fiscal year 1959 . Investigation should be started in fiscal year 1960 to provide a plan of development for some 12,600 ...
... production . Water would be obtained from the existing Fern Ridge Reservoir . Report scheduled for completion in fiscal year 1959 . Investigation should be started in fiscal year 1960 to provide a plan of development for some 12,600 ...
Page 69
... production because of lack of late - season irrigation water . In 1955 and again in 1957 severe floods were experienced which caused extensive damage to farmlands and public and private improve- ments . Multipurpose storage on the main ...
... production because of lack of late - season irrigation water . In 1955 and again in 1957 severe floods were experienced which caused extensive damage to farmlands and public and private improve- ments . Multipurpose storage on the main ...
Page 71
... production of 180,000 kilowatts of power which is in great demand in the Upper Snake River Basin . Storage space in the Palisades Reservoir has been oversubscribed and present and anticipated power require- ments exceed the capacity of ...
... production of 180,000 kilowatts of power which is in great demand in the Upper Snake River Basin . Storage space in the Palisades Reservoir has been oversubscribed and present and anticipated power require- ments exceed the capacity of ...
Other editions - View all
Common terms and phrases
AANDAHL acre-feet acres activities additional agencies allocated annual authorized average Balance to complete BENNETT Bonneville budget Bureau of Reclamation canal CANNON Central Valley project Colorado River committee completed in fiscal Congress construction program Cooperative Corps of Engineers cost County Creek Dam and Reservoir Definite plan report division DOMINY drainage Electric equipment estimate expenses feasibility Federal FENTON fertilizer financing fiscal year 1960 fish and wildlife flood control funds Government included increase initiated installation investigations investment irrigation Irrigation District JENSEN June 30 kilovolts kilowatt-hours kilowatts land load ment miles million Missouri River Basin Municipality operation and maintenance payment percent PILLION powerplant primary energy proposed RABAUT reconnaissance record referred to follows Region repayment contract requested revenues River Basin project River project scheduled Service facilities South Dakota Southwestern Power Administration storage studies substation tion Total obligations transmission line unit utilities water supply water users Wyoming
Popular passages
Page 210 - That the following works of improvement of rivers, harbors,and other waterways are hereby adopted and authorized, to be prosecuted under the direction of the Secretary of War and supervision of the Chief of Engineers...
Page 211 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 407 - I have a chart here which I would like to have put in the record at this point; and to give you a little flavor, I shall read from it.
Page 313 - Dam on the American River in California. This project was authorized for construction by the Corps of Engineers in the Flood Control Act approved...
Page 976 - In the construction of any future dam, steam plant, or other facility, to be used in whole or in part for the generation or transmission of electric power the board is hereby authorized and empowered to issue on the credit of the United States and to sell serial bonds not exceeding $50,000,000 in amount, having a maturity...
Page 211 - That the Secretary of War shall make arrangements for payment to the United States by the State or other responsible agency, either in lump sum or annual installments, for conservation storage when used...
Page 216 - Hereafter, whenever the .Secretary of War determines upon recommendation by the Secretary of the Interior that any dam and reservoir project operated under the direction of the Secretary of War may be utilized for irrigation purposes...