charges have not been paid when due, except where the lands are in Indian ownership, not under lease to non-Indians, and the Indian owner shall have made the necessary arrangements with the Superintendent as hereinafter provided. When any Indian owner of land not under lease to a non-Indian is filnancially unable to pay the operation and maintenance charges on the due date, the Superintendent may make the necessary arrangements with such Indian owner as will permit him to perform labor on the irrigation project works, the proceeds derived therefrom to be applied in partial payment of such charges. The Superintendent may also make necessary arrangements for such Indian owner to pay the operation and maintenance charges from the proceeds of the crops grown on the land when harvested and marketed within that calendar year, provided written arrangements to that effect are made with the Superintendent by the Indian owner prior to the delivery of water.

(b) In any instance where the Superintendent is convinced that an Indian landowner, whose land is not under lease to a non-Indian, is financially unable to pay his operation and maintenance charges from proceeds of labor performed on the project works, or from the proceeds of the crops being grown on the land, or from any other source, the delivery of water may be made to the land

if a written certificate is issued by the Superintendent stating that such Indian landowner is not financially able to pay such charges. In such cases the unpaid charges shall be entered on the accounts and will stand as a first lien against the land until paid but without penalty for delinquency.

§ 221.193 Water users' responsibility for water after delivery.

The water users are responsible for the water after it has been delivered to their lands, and are required to have their field ditches of proper capacity and in a suitable condition for delivery of irrigation water.

[blocks in formation]
[blocks in formation]
[blocks in formation]

§ 231.1

Purpose of regulations.

The rules and regulations in this part are approved for the conduct of electric power system of the Colorado River Project, Arizona. The rules and regulations of this part are subject to change by the proper authority and such changes will apply to all contracts then and afterwards in effect. § 231.2

Authority of project engineer.

The project engineer is responsible for operation of electric power system and enforcement of public notices establishing rates and rules and regulations. He is fully authorized to carry out and enforce the rules and regulations in this part either directly or through the power superintendent or other project employees designated by him. § 231.3

Disputes.

In case of dispute regarding application of rules and regulations and decisions of the project engineer made pursuant thereto, appeal may be made to the proper supervising engineer who will adjust or refer to Commissioner of Indian Affairs whose decision will be final. While an appeal is pending electric service will not be discontinued except in case of emergency by reason of the existing dangerous conditions provided for in § 231.36, provided payments or deposits are made as provided in § 231.31.

§ 231.4 Applications; contracts.

In order to become a consumer under the Colorado River Project electric power system, an application shall be made which becomes a contract upon the approval of the Project Engineer. In general, service will be rendered to all applicants signing valid contracts where service lines exist. The Project Engineer is authorized to reject applications where it does not appear that the rules

and regulations in this part will be complied with, or when not to the interest of the United States. Upon 30 days' written notice to the contractor, the Project Engineer may suspend or cancel any contract upon failure to comply with rules and regulations or to make payment under the standard schedule of rates. Negotiations for contracts involving special conditions or service within town sites of record will be subject to approval by the Commissioner of Indian Affairs

§ 231.5 Cash deposits.

Cash deposit in advance in the amount of twice the estimated monthly bill, but not less than $10 will be required from all consumers except property owners. In case of delinquency by property owners such advance payment will be required for 1 year, after which deposit will be returned.

§ 231.6 Deposits waived.

Deposit requirements in the case of tenants will be waived when property owner jointly signs the tenant's contract, subject to delinquency clause in § 231.5. § 231.7 Deposits returned.

The consumers cash deposit less the amount of any unpaid bills for electric service will be returned to him when service is discontinued by order of the consumer. The special disbursing agent will require the consumer to sign a proper refund voucher before returning the net cash deposit.

§ 231.8 Deposits for extensions.

For extensions beyond existing service lines and for temporary service, certain guarantees and deposits may be required as prescribed in §§ 231.10-231.19. § 231.9 Service bills.

Certain service bills, for removal, reconnection charge, and final settlement are payable on presentation.

§ 231.10 Extensions.

In so far as practicable all extensions will be constructed along established highways and transformers placed thereon.

[blocks in formation]
[blocks in formation]

In rural areas, extensions of single phase circuits will not exceed 330 feet for each dollar of guaranteed monthly revenue and extensions of three phase circuits will not exceed 210 feet for each dollar of guaranteed monthly revenue. § 231.13 Guarantees.

Before extensions are constructed the consumers must deposit with the special disbursing officer an amount at least equal to the required minimum revenue for a period of one year and must establish their credit in such a manner as to satisfy the project engineer of their ability and intention to meet the guarantees.

§ 231.14 Measuring extensions.

In measuring an extension there shall be included all the primary distribution circuit which it is necessary to build and also the length of the secondary circuit, in excess of 100 feet, to the point of conDnection with the consumer's service.

[blocks in formation]

If extensions are desired beyond the distances specified in §§ 231.11, 231.12, or if project funds are not available, the prospective consumers may after appropriate written agreement with the project engineer furnish or pay for such satisfactory line material and labor as may be necessary to construct the additional extension. The agreement may provide that part or all of the cost of the extension will be refunded to the consumer by allowing him a monthly credit equal to 20 percent of his bill each month during the life of the contract until the agreed amount is refunded but refund will not be made for any extension not along a public highway except the difference, if any, between the deposit and the actual cost thereof, which will be refunded monthly by credit allowance on monthly bills.

§ 231.16 Extensions limited.

The project engineer shall decline to construct any extension which in his opinion will be excessive in cost or detrimental to the best interest of the project or for which appropriations and funds are not available. All extensions provided for under §§ 231.11, 231.12, and

[blocks in formation]

The consumer shall make or procure satisfactory conveyance to the United States of rights-of-way across property owned or controlled by the consumer, necessary for the lines of the United States or incidental to the furnishing of service.

§ 231.18 Temporary service.

Unless the payment of the cost is satisfactorily guaranteed, applicants for temporary service shall be required to deposit with the special disbursing agent a sum of money equal to the estimated net cost of installing and removing any facilities necessary in connection with furnishing such service, and also an additional sum approximately equal to the estimated bill for electric service: Provided, That if service is to continue for more than 2 months the said additional sum need not be greater than twice the estimated monthly bill. After service is discontinued an account shall be rendered to the consumer and proper adjustment shall be made.

§ 231.19 Temporary service defined.

Temporary service refers to service to circuses, bazaars, fairs, construction works, and other business of such a nature that service on the premises will probably be discontinued within less than 1 year.

[blocks in formation]

(a) Service for lights and usual domestic and other appliances, including motors of less than 5 horse power, will be single phase, either 115 or 230 volts. and two or three wire except when special approval for another type of service: has been obtained from the project; engineer:

(b) Three phase service at suitabl voltage may be furnished for motor in.. stallations of 5 horse power and over providing a three phase circuit and the required voltage are available at the point where the consumer desires service. (c) All service will be 60 cycle. § 231.21

Service connections.

(a) The consumer shall furnish and install the service within the building and shall extend the service conductors at least 3 feet beyond the outside wall of the building. Service switch, service

cut-outs and all necessary arrangements for meters shall be provided by the consumer in accordance with the following specifications:

(1) Service wires from the main line switch to the service entrance shall be encased in steel conduit and shall be brought outside the building at the location most convenient to the lines of the United States. If brought out elsewhere they shall be carried in conduit to the point designated by the power superintendent. Service wires will not be carried over buildings to reach outlets where clearance of 8 feet for roofs less than one-fourth pitch, and 2 feet for roofs greater than one-fourth pitch cannot be obtained. Outlets must be brought out at least 10 feet above the ground. If the consumer or his wiring contractor has any doubt as to the proper location for the service entrance, he should consult the power superintendent before the work is done.

(b) The ordinary method of connection with the street mains will be overhead wires. Customers desiring the feed wires to run underground must run their own wires in conduit from the building to the service arm on the pole where connection is to be made. Conduits on the pole must be installed in a manner satisfactory to the power superintendent. They must be placed outside the climbing space and must be wholly encased, from the upper end to a point not less than 8 feet below the lowest conductor on the pole, in a casing equal in durability and insulating value to a wooden casing not less than 11⁄2 inches thick. Conduits must be provided at the upper end with a suitable weatherproof fitting installed not more than 4 inches below the service arm. The conductors must be of such size that at full load the voltage drop from the cross arm on the pole to the building entrance will not exceed 2 percent.

(c) Ordinarily not more than one service will be installed to any one building. An exception will be made where both single phase and three phase are required.

§ 231.22 Entrance wires, switch, and

protection.

(a) On single phase installations meters will be of the socket type. The socket and meter will be furnished by the United States. The socket shall be installed by the customer. From the load side of the meter socket the cus

tomer shall install the service wire in rigid conduit to a distribution box. This box must contain an automatic switch or breaker of an approved size for the connected demand. An additional grouping of branch fuse blocks or circuit breakers must be installed to serve lights, motors or other appliances, as required by the rules of the National Electrical Code. The neutral wire shall not be fused.

(b) On three phase installations a main line entrance switch must be placed on the line side of the meter and adjacent thereto. This switch shall be fused on the load side of the switch or an automatic circuit breaker of approved type and capacity shall be installed. If fuses are used they must be of cartridge type when the voltage is in excess of 150 volts to ground. The neutral wire shall not be fused.

(c) Entrance wires must be carried to the meter in rigid conduit and so arranged that they can be connected to the left side of the meter, and the load wires to the right side without crossing them near the meter.

(d) Where two or more meters are to be placed in one installation extra arrangements for meter sockets or loops and meter boards shall be made by the consumer and each meter shall be protected by an individual cutout and switch. In such a case, the meter loops must be plainly marked to show the service and load ends and to what circuit each belongs.

§ 231.23 Location and installation of

meters.

Meters will be furnished and installed by the United States. The consumer shall provide and maintain the necessary meter box or cabinet, switches, wiring, and test facilities. The locations of meters must be satisfactory to the power superintendent and in accordance with the following specifications:

(a) All meters must be located as near as possible to the point of entrance of the service, in a clean, dry, safe place, where they will be free from vibration.

(b) Meters must be in readily accessible locations so that the meter readers and test men may have access to the meters without inconveniencing the consumer. Location on an open porch or in an approved shelter on the outside of a building will be satisfactory. Under no circumstances will meters be installed in attics, sitting rooms, bath

rooms, rest rooms, bedrooms, kitchens, or over stoves, sinks, tubs, doors, windows, or in any location where the visits of the meter reader or tester will cause annoyance to the customer.

(c) The proper height for all meters is about 6 feet above the floor or ground and no meter will be installed more than 8 feet nor less than 6 feet above the floor or working level. Meters must not be located above stairways, porch steps, basement entrances, or in any place where a short step ladder or chair cannot be safely placed for reaching the meter.

(d) Meter boards must be furnished by the consumer where meters are to be set on lath and plaster, concrete, brick, stone, metal, or uneven surfaces, or in other places where the meter cannot be conveniently supported directly on the wall. Meter boards must be not less than three-quarters of an inch thick, of sound wood, surfaced on all sides and of ample dimensions for the meters. They must be mounted in a substantial manner with their faces set truly vertical.

(e) A working space of not less than 124 inches must be provided and maintained in front of every meter and meter box.

(f) Where current and potential transformers are required for use with meters, ample provision shall be made by the consumer for their mounting and a ground wire shall be provided.

(g) Where two or more meters are to be placed in one building it is preferred that they be grouped at one common place.

(h) No load wires of any description shall be carried within the same conduit as the supply wires except in cases of pole metering for rural customers. Tampering or in any way interfering with a meter or its connections is prohibited.

[blocks in formation]

§ 231.25 Change of consumer's equip

ment.

In the event the consumer shall make any material change either in the amount or character of the electric lamps, appliances, machinery, or apparatus installed upon his premises he shall immediately give the project engineer written notice thereof.

§ 231.26 Apparatus detrimental to service.

(a) The project engineer may refuse to supply loads of a character that may seriously impair service to other consumers. He may require the consumer to provide suitable equipment to limit reasonably the fluctuations.

(b) All motors shall be provided with suitable starting devices or apparatus to limit their starting current.

(c) The project engineer may discontinue electric service to any consumer who shall continue to use appliances or apparatus detrimental to the service after he has been notified to correct the condition and has failed to do so within a reasonable time.

[blocks in formation]

(b) The United States reserves the right to make all service connections. No service will be connected, where an inspection is required by municipal ordinance, until the installation has been inspected and approved by the municipal inspector.

§ 231.28 Meter reading.

Meters will be read and bills for electric service will be rendered at regular intervals. Should the seal of the meter be broken by other than the proper representative of the United States, or in case the meter fails to register correctly, the consumer shall pay an amount estimated from the records of his previous use and other available and proper information. Bills are delinquent after the 15th day of the month succeeding that in which the service is rendered. Payments shall be made at the designated office of the Indian Irrigation Service or to a properly authorized employee of the Service.

« PreviousContinue »