§ 161.8 Public survey.

(a) The termini of the line of route shall be fixed by reference of course and distance to the nearest existing corner of the public survey. The maps, as well as the engineer's affidavit and the certificate, shall show these connections.

(b) When either terminal of the line of route is upon unsurveyed land, it must be connected by traverse with an established corner of the public survey if not more than 6 miles distant from it, and the single bearing and distance from the terminal point to the corner computed and noted on the maps, in the engineer's affidavit, and in the certificate. The notes and all data for the computation of the traverse must be given. § 161.9

Connection with natural objects. When the distance to an established corner of the public survey is more than 6 miles, this connection will be made with a natural object or a permanent monument which can be readily found and recognized, and which will fix and perpetuate the position of the terminal point. The maps must show the position of such mark, and course and distance to the terminus. There must be given an accurate description of the mark and full data concerning the traverse, and the engineer's affidavit and the certificate on the maps must state the connections.

§ 161.10 Township and section lines.

Whenever the line of survey crosses a township or section line of the public survey, the distance to the nearest existing corner shall be noted. The maps shall show these distances and the station numbers at the points of intersections. The field notes shall show these distances and the station numbers.

§ 161.11 Affidavit and certificate.

(a) There shall be subscribed on the maps of definite location an affidavit executed by the engineer who made the survey and a certificate executed by the applicant, both certifying to the accuracy of the survey and maps and both designating by termini and length in miles and decimals, the line of route for which the right-of-way application is made.

(b) Maps covering roads built by the Bureau of Indian Affairs which are to be

[blocks in formation]

Except when waived in writing by the landowners or their representatives as defined in § 161.3 and approved by the Secretary, the consideration for any right-of-way granted or renewed under this Part 161 shall be not less than the appraised fair market value of the rights granted, plus severance damages, if any, to the remaining estate.

§ 161.13 Other damages.

In addition to the consideration for a grant of right-of-way provided for by the provisions of § 161.12, the applicant for a right-of-way will be required to pay all damages incident to the survey of the right-of-way or incident to the construction or maintenance of the facility for which the right-of-way is granted. § 161.14 Deposit and disbursement of consideration and damages.

At the time of filing an application for right-of-way, the applicant must deposit with the Secretary the total estimated consideration and damages, which shall include consideration for the right-ofway, severance damages, damages caused during the survey, and estimated damages to result from construction less any deposit previously made under § 161.4. In no case shall the amount deposited as consideration for the right-of-~ way over any parcel be less than the amount specified in the consent covering that parcel. If in reviewing the application, the Secretary determines that the amounts deposited are inadequate to compensate the owners, the applicant shall increase the deposit to an amount determined by the Secretary to be adequate. The amounts so deposited shall be held in a "special deposit" account for distribution to or for the account of the landowners and authorized users and occupants of the land. Amounts depos

[blocks in formation]

ited to cover damages resulting from survey and construction may be disbursed after the damages have been sustained. Amounts deposited to cover consideration for the right-cf-way and severance damages shall be disbursed upon the granting of the right-of-way. Any part of the deposit which is not required for disbursement as aforesaid shall be refunded to the applicant promptly following receipt of the affidavit of completion of construction filed pursuant to § 161.16.

§ 161.15

Action on application.

Upon satisfactory compliance with the regulations in this Part 161, the Secretary is authorized to grant the right-ofway by issuance of a conveyance instrument in the form approved by the Secretary. Such instrument shall incorporate all conditions or restrictions set out in the consents obtained pursuant to § 161.3. A copy of such instrument shall be promptly delivered to the applicant and thereafter the applicant may proceed with the construction work. Maps of definite location may be attached to and incorporated into the conveyance document by reference. In the discretion of the Secretary, one conveyance document may be issued covering all of the tracts of land traversed by the right-of-way, or separate conveyances may be made covering one or several tracts included in the application. A duplicate original copy of the conveyance instrument, permanent and reproducible maps, a copy of the application and stipulations, together with any other pertinent documents shall be transmitted by the Secretary to the office of record for land documents affecting the land covered by the right-of-way, where they will be recorded and filed.

§ 161.16 Affidavit of completion.

Upon the completion of the construction of any right-of-way, the applicant shall promptly file with the Secretary an affidavit of completion, in duplicate, executed by the engineer and certified by the applicant. The Secretary shall transmit one copy of the affidavit to the office of record mentioned in § 161.15. Failure to file an affidavit in accordance with this section shall sub

ject the right-of-way to cancellation in accordance with § 161.20.

§ 161.17 Change of location.

If any change from the location described in the conveyance instrument is found to be necessary on account of engineering difficulties or otherwise, amended maps and field notes of the new location shall be filed, and a rightof-way for such new route or location shall be subject to consent, approval, the ascertainment of damages, and the pay ment thereof, in all respects as in the case of the original location. Before a revised conveyance instrument is issued, the applicant shall execute such instruments deemed necessary by the Secretary extinguishing the right-of-way at the original location. Such instruments shall be transmitted by the Secretary to the office of record mentioned in § 161.15 for recording and filing.

§ 161.18 Tenure of approved right-of.. way grants.

All rights-of-way granted under the regulations in this Part 161 shall be in the nature of easements for the periods stated in the conveyance instrument. Except as otherwise determined by the Secretary and stated in the conveyance instrument, rights-of-way granted under the Act of February 5, 1948 (62 Stat 17; 25 U.S.C. 323-328) for railroads, telephone lines, telegraph lines, public roads, and highways, public sanitary and storm sewer lines including sewage disposal and treatment plants, water control and use projects (including but not limited to dams, reservoirs, flowage easements, ditches, and canals), oil, gas and public utility water pipelines (including pumping stations and appurtenant facilities), electric power projects, generating plants, switchyards, electric transmission and distribution lines (including poles, towers and appurtenant facilities), and for service roads and trails essential to any of the aforestated use purposes, may be without limitation as to term of years; whereas, rights-of-way for all other purposes shall be for a period of not to exceed 50 years, as determined by the Secretary and stated in the conveyance instrument.

§ 161.19 Renewal of right-of-way grants. On or before the expiration date of any right-of-way heretofore or hereafter granted for a limited term of years, an application may be submitted for a renewal of the grant. If the renewal involves no change in the location or status of the original right-of-way grant, the applicant may file with his application a certificate under oath setting out this fact, and the Secretary, with the consent required by § 161.3, may thereupon extend the grant for a like term of years, upon the payment of consideration as set forth in § 161.12. If any change in the size, type, or location of the rightof-way is involved, the application for renewal shall be treated and handled as in the case of an original application for a right-of-way.

§ 161.20 Termination of right-of-way

grants.

All rights-of-way granted under the regulations in this part shall be terminable in whole or in part upon 30 days written notice from the Secretary mailed to the grantee at its latest address furnished in accordance with § 161.5(j), for any of the following causes:

(a) Failure to comply with any term or condition of the grant or the applicable regulations;

(b) A nonuse of the right-of-way for a consecutive 2-year period for the purpose for which it was granted;

(c) An abandonment of the right-ofway.

If within the 30-day notice period the grantee fails to correct the basis for termination, the Secretary shall issue an appropriate instrument terminating the right-of-way. Such instrument shall be transmitted by the Secretary to the office of record mentioned in § 161.15 for recording and filing. § 161.21

Condemnation actions involving individually owned lands.

The facts relating to any condemnation action to obtain a right-of-way over individually owned lands shall be reported immediately by officials of the Bureau of Indian Affairs having knowledge of such facts to appropriate officials of the Interior Department so that ac

[blocks in formation]

a

(a) An agreement shall be executed by and between the landowner or legally authorized occupant or user of individually owned land and the applicant before any work by the applicant may be undertaken to construct a service line across such land. Such a service line shall be limited in the case of power lines to a voltage of 14.5 kv. or less except lines to serve irrigation pumps and commercial and industrial uses which shall be limited to a voltage not to exceed 34.5 kv. A service line shall be for the sole purpose of supplying the individual owner or authorized occupant or user of land, including schools and churches, with telephone, water, electric power, gas, and other utilities for use by such owner, occupant, or user of the land on the premises.

(b) A similar agreement to that required in paragraph (a) of this section shall be executed by the tribe or legally authorized occupant or user of tribal land and the applicant before any work by the applicant may be undertaken for the construction of a service line across tribal land. A service line shall be for the sole purpose of supplying an occupant or user of tribal land with any of the utilities specified in paragraph (a) of this section. No agreement under this paragraph shall be valid unless its execution shall have been duly authorized in advance of construction by the governing body of the Indian tribe whose land is affected, unless the contract under which the occupant or user of the land obtained his rights specifically authorizes such occupant or user to enter into service agreements for utilities without further tribal consent.

(c) In order to encourage the use of telephone, water, electric power, gas and other utilities and to facilitate the extension of these modern conveniences to sparsely settled Indian areas without undue costs the agreement referred to in paragraph (a) of this section shall only be required to include or have appended thereto, a plat or diagram showing with particularity the location, size, and extent of the line. When the plat or diagram is placed on a separate sheet it

shall bear the signature of the parties. In case of tribal land, the agreement shall be accompanied by a certified copy of

the tribal authorization when

required.

(d) An executed copy of the agreement, together with a plat or diagram, and in the case of tribal land, an authenticated copy of the tribal authorization, when required, shall be filed with the Secretary within 30 days after the date of its execution. Failure to meet this requirement may result in the removal of improvements placed on the land at the expense of the party responsible for the placing of such improvements and subject such party to the payment of damages caused by his unauthorized act. § 161.23 Railroads.

(a) The Act of March 2, 1899 (30 Stat. 990), as amended by the Acts of February 28, 1902 (32 Stat. 50), June 21, 1906 (34 Stat. 330), and June 25, 1910 (36 Stat. 859; 25 U.S.C. 312-318); the Act of March 3, 1875 (18 Stat. 482; 43 U.S.C. 934); and the Act of March 3, 1909 (35 Stat. 781), as amended by the Act of May 6, 1910 (36 Stat. 349; 25 U.S.C. 320), authorize grants of rightsof-way across tribal, individually owned and Government-owned land, except in the State of Oklahoma, for railroads, station buildings, depots, machine shops, side tracks, turnouts, and water stations; for reservoirs, material or ballast pits needed in the construction, repair, and maintenance of railroads; and for the planting and growing of trees to protect railroad lines. Rights-of-way granted under the above acts shall be subject to the provisions of this section as well as other pertinent sections of this Part 161. Except when otherwise determined by the Secretary, rights-of-way for the above purposes granted under the Act of February 5, 1948 (62 Stat. 17; 25 U.S.C. 323-328), shall also be subject to the provisions of this section.

(b) Rights-of-way for railroads shall not exceed 50 feet in width on each side of the centerline of the road, except where there are heavy cuts and fills, when they shall not exceed 100 feet in width on each side of the road. The rightof-way may include grounds adjacent to the line for station buildings, depots, machine shops, side tracks, turnouts, and

water stations, not to exceed 200 feet in width by a length of 3,000 feet, with no more than one station to be located within any one continuous length of 10 miles of road.

(c) Short spurs and branch lines may be shown on the map of the main line, separately described by termini and length. Longer spurs and branch lines shall be shown on separate maps. Grounds desired for station purposes may be indicated on the map of definite location but separate plats must be filed for such grounds. The maps shall show any other line crossed, or with which connection is made. The station number shall be shown on the survey thereof at the point of intersection. All intersecting roads must be represented in ink of a different color from that used for the line for which application is made.

(d) Plats of railroad station grounds shall be drawn on a scale of 400 feet to an inch, and must be filed separately from the line of route. Such plats shall show enough of the line of route to indicate the position of the tract with reference thereto. Each station ground tract must be located with respect to the public survey as provided in § 161.8 and all buildings or other structures shall be platted on a scale sufficiently large to show clearly their dimensions and relative positions.

(e) If any proposed railroad is parallel to, and within 10 miles of, a railroad already built or in course of construction, it must be shown wherein the public interest will be promoted by the proposed road. Where the Interstate Commerce Commission has passed on this point, a certified copy of its findings must be filed with the application.

(f) The applicant must certify that the road is to be operated as a common carrier of passengers and freight.

(g) The applicant shall execute and file, in duplicate, a stipulation obligating the company to use all precautions possible to prevent forest fires and to suppress such fires when they occur, to construct and maintain passenger and freight stations for each Government townsite, and to permit the crossing, in 2 manner satisfactory to the Government officials in charge, of the right-ofway by canals, ditches, and other projects.

(h) A railroad company may apply for sufficient land for ballast or material pits, reservoirs, or tree planting to aid in the construction or maintenance of the road. The authority to use any land for such purposes shall terminate upon abandonment or upon failure to use the land for such purposes for a continuous period of 2 years.

§ 161.24 Railroads in Oklahoma.

(a) The Act of February 28, 1902 (32 Stat. 43), authorizes right-of-way grants across tribal and individually owned land in Oklahoma. Rights-of-way granted under that act shall be subject to the provisions of this section as well as other pertinent sections of this Part 161. Except when otherwise deterinined by the Secretary, railroad rights-of-way in Oklahoma granted under the Act of February 5, 1948 (62 Stat. 17; 25 U.S.C. 323-328), shall also be subject to the provisions of this section.

(b) One copy on tracing linen of the map of definite location showing the line of route and all lands included within the right-of-way must be filed with the Secretary. When tribal lands are involved, a copy of the map must also be filed with the tribal council.

(c) Before any railroad may be constructed or any lands taken or condemned for any of the purposes set forth in section 13 of the Act of February 28, 1902 (32 Stat. 47), full damages shall be paid to the Indian owners.

(d) After the maps have been filed, the matter of damages shall be negotiated by the applicant directly with the Indian owners. If an amicable settlement cannot be reached, the amount to be paid as compensation and damages shall be fixed and determined as provided in the statute. If court proceedings are instituted, the facts shall be reported immediately as provided in § 161.21.

[blocks in formation]

this section as well as other pertinent sections of this Part 161. Except when otherwise determined by the Secretary, rights-of-way granted for such purposes under the Act of February 5, 1948 (62 Stat. 17; 25 U.S.C. 323-328) shall also be subject to the provisions of this section.

(b) Rights-of-way, granted under aforesaid Act of March 11, 1904, as amended, for oil and gas pipelines, pumping stations or tank sites shall not extend beyond a term of 20 years and may be extended for another period of not to exceed 20 years following the procedures set out in § 161.19 of this part.

(c) All oil or gas pipelines, including connecting lines, shall be buried a sufficient depth below the surface of the land so as not to interfere with cultivation. Whenever the line is laid under a road or highway, the right-of-way for which has been granted under an approved application pursuant to an act of Congress, its construction shall be in compliance with the applicable Federal and State laws; during the period of construction, at least one-half the width of the road shall be kept open to travel; and, upon completion, the road or highway shall be restored to its original condition and all excavations shall be refilled. Whenever the line crosses a ravine, canyon, or waterway, it shall be laid below the bed thereof or upon such superstructure as will not interfere with the use of the surface.

(d) The size of the proposed pipeline must be shown in the application, on the maps, and in the engineer's affidavit and applicant's certificate. The application and maps shall specify whether the pipe is welded, screw-joint, dresser, or other type of coupling. Should the grantee of an approved right-of-way desire at any time to lay additional line or lines of pipe in the same trench, or to replace the original line with larger or smaller pipe, written permission must first be obtained from the Secretary and all damages to be sustained by the owners must be paid in advance in the amount fixed and determined by the Secretary.

(e) Applicants for oil or gas pipeline rights-of-way may apply for additional land for pumping stations or tank sites. The maps shall show clearly the location of all structures and the location of all