Rivers and Harbors - Flood Control Emergency Act. Hearings ... on H.R. 6419. May 10, 12-14, 17-19, 12, 24-25, 27, and June 4, 19481948 - 525 pages |
From inside the book
Results 1-5 of 100
Page 2
... feet wide at mean sea level and a berm 50 feet wide at elevation 5 ; structural repairs to the sea wall , sidewalk , etc .; and necessary alterations to the drainage system . Estimated cost to the United States for construction ...
... feet wide at mean sea level and a berm 50 feet wide at elevation 5 ; structural repairs to the sea wall , sidewalk , etc .; and necessary alterations to the drainage system . Estimated cost to the United States for construction ...
Page 9
... feet . One hundred feet may be a little exaggeration , but I know of my cvn knowledge in my own lifetime , of the highway being washed away and having to be rebuilt farther back several times as the result of these storms . So , this ...
... feet . One hundred feet may be a little exaggeration , but I know of my cvn knowledge in my own lifetime , of the highway being washed away and having to be rebuilt farther back several times as the result of these storms . So , this ...
Page 2
... feet wide at mean sea level and a berm 50 feet wide at elevation 5 ; structural repairs to the sea wall , sidewalk , etc .; and necessary alterations to the drainage system . Estimated cost to the United States for construction ...
... feet wide at mean sea level and a berm 50 feet wide at elevation 5 ; structural repairs to the sea wall , sidewalk , etc .; and necessary alterations to the drainage system . Estimated cost to the United States for construction ...
Page 9
... feet . One hundred feet may be a little exaggeration , but I know of my cvn knowledge in my own lifetime , of the highway being washed away and having to be rebuilt farther back several times as the result of these storms . So , this ...
... feet . One hundred feet may be a little exaggeration , but I know of my cvn knowledge in my own lifetime , of the highway being washed away and having to be rebuilt farther back several times as the result of these storms . So , this ...
Page 20
... feet and part 8 feet above mean sea level . A concrete sidewalk 5 feet wide adjoins the top of the wall throughout its length . Sand backfill for the sea wall and adjacent roadway was dredged from Mississippi Sound about 1,000 feet ...
... feet and part 8 feet above mean sea level . A concrete sidewalk 5 feet wide adjoins the top of the wall throughout its length . Sand backfill for the sea wall and adjacent roadway was dredged from Mississippi Sound about 1,000 feet ...
Contents
24 | |
38 | |
53 | |
58 | |
66 | |
71 | |
72 | |
111 | |
374 | |
384 | |
386 | |
421 | |
423 | |
427 | |
434 | |
439 | |
124 | |
137 | |
172 | |
187 | |
236 | |
275 | |
281 | |
286 | |
288 | |
333 | |
342 | |
461 | |
463 | |
464 | |
468 | |
469 | |
470 | |
473 | |
476 | |
481 | |
489 | |
Common terms and phrases
acre-feet acres agricultural annual approximately Arkansas River Army engineers authorized basin benefits bill Board canals Chairman channel Chief of Engineers citrus Colonel GEE Colonel JEWETT committee Congress Congressman construction Corps of Engineers cost crop damage dikes drainage district Dyberry east estimated farm Federal flood control floodwaters Florida flow GILES highway Honesdale hurricane improvement interests irrigation Kissimmee Kissimmee River Kittson County Lackawaxen River Lake Okeechobee land levee located loss Lucie Canal maintenance Mexico Miami Middle Rio North Dakota percent Poteau Poteau River present Prompton proposed Reclamation record Red River repair reservoirs Rio Grande compact Rivers and Harbors roads sea wall Senator CHAVEZ Senator COOPER Senator HATCH Senator HOLLAND Senator MALONE Senator MARTIN Senator MCCLELLAN Senator MYERS Senator YOUNG soil spillway statement stream subcommittee taxes Thank tion United Valley water control Wayne County
Popular passages
Page 486 - Provided further, That the Government shall not be deemed to have entered upon any project for the improvement of any waterway or harbor mentioned in this Act until the project for the proposed work shall have been adopted by law...
Page 43 - State as the responsible agency for providing without cost to the United States all lands, easements and rights-of-way necessary for the construction of the project.
Page 488 - War is hereby authorized and directed to cause preliminary examinations and surveys for flood control including floods aggravated by or due to tidal effect at the following-named localities, and the Secretary of Agriculture is authorized and directed to cause preliminary examinations and surveys for run-off and water-flow retardation and soil-erosion prevention on the watersheds...
Page 489 - That the sum of $25,000,000 is hereby authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers...
Page 484 - That the following works of improvement of rivers and harbors and other waterways for navigation, flood control, and other purposes are hereby adopted and authorized to be prosecuted under the direction of the Secretary of the Army and supervision of the Chief of Engineers, in accordance with the plans and subject to the conditions recommended by the Chief of Engineers in the respective reports...
Page 385 - I do not want to take any more of your time, but I want to say I have been interested in the labor movement and working people all of my life.
Page 338 - Army that they will : (a) Provide without cost to the United States all lands, easements, and rights-of-way necessary for...
Page 9 - ... hold and save the United States free from all claims for damages that may arise...
Page 489 - ... work threatened or destroyed by flood, including the strengthening, raising, extending, or other modification thereof as may be necessary in the discretion of the Chief of Engineers for the adequate functioning of the work for flood control.
Page 454 - States all lands, easements, and rights-of-way, hold and save the United States free from damages due to the construction works, and maintain the works after completion in accordance with standard regulations.