Page images
PDF
EPUB

$ 170.23 Schedule of fees for routine health, safety and environmental inspections of

facilities.

SCHEDULE OF FACILITY ROUTINE HEALTH, SAFETY AND ENVIRONMENTAL INSPECTION FEES"

[merged small][ocr errors][merged small][merged small][merged small][merged small]

1 Routine inspections are safety, environmental, and health physics inspections performed at specified frequencies for purposes of reviewing a licensed program to assure that the authorized activities are being conducted in accordance with the Atomic Energy Act of 1954, as amended, Commission regulations, and the terms and conditions of the license.

2 The frequency shown in the schedule is the maximum number of routine inspections for which a fee will be assessed.

3 A reduced fee will be charged when the inspection of an additional unit at the same site is conducted concurrently with the first unit.

* Fee is applicable for a fuel reprocessing facility and for a uranium enrichment facility.

(43 FR 7220, Feb. 21, 1978)

$ 170.24 Schedule of fees for routine safeguards inspections of facilities.

[blocks in formation]

1 The frequency shown in the schedule is the maximum number of safeguards inspections for which a fee will be assessed. Power reactors and other production and utilization facilities will be assessed the yearly inspection fee shown in the above table.

2 A reduced fee will be charged when the inspection of additional unit(s) at the same site is conducted concurrently with the first unit.

3 Fee is applicable for a fuel reprocessing facility and for a uranium enrichment facility.

(43 FR 7220, Feb. 21, 1978)

[ocr errors]

$ 170.31 Schedule of fees for materials licenses and other regulatory services.

Applicants for materials licenses and other regulatory services and holders o materials licenses shall pay the following fees.

SCHEDULE OF FEES FOR MATERIALS LICENSES AND OTHER REGULATORY SERVICES

[graphic][subsumed][subsumed][subsumed][merged small][merged small][merged small][subsumed][merged small][subsumed][subsumed][subsumed][merged small]

SCHEDULE OF FEES FOR MATERIALS LICENSES AND OTHER REGULATORY SERVICES—Continued

[graphic]

2,000 18,800 11,100

1,400 2,800

150

35,000 290,000 32,000

88,500 6,200 3,500 3,500

150 25,000 209,300 32,000

G. Licenses for possession and use of 350 g Application.

but less than 5 kg of contained uranium 235 New license........ in unsealed form, or 200 g but less than 2 Renewal.......... kg of uranium 233 in unsealed form.

Amendment: .......

Safety and environmental .........
Safeguards .......

Administrative...
H. Licenses for receipt and storage of spent

fuel at an independent spent fuel storage

installation (ISFSI): 4
(1) License application for an ISFSI of custom

design requiring a full design review:
(a) Storage facility to be located at a new Application..
site.

New license...
Renewal...........
Amendment: 3

Major-Safety and environmental..........
Major-Safeguards..
Minor-Safety and environmental ........
Minor-Safeguards

Administrative...
(6) Storage facility to be located at the site
of an existing nuclear facility. 5

New license.........
Renewal................
Amendment: 3...........

Major-Safety and environmental.
Major-Safeguards..........
Minor-Safety and environmental..
Minor-Safeguards..........

Administrative...... (2) License application for an ISFSI which

references an approved standardized
design:
(a) Storage facility to be located at a Application...
new site.

New license....
Renewal..............
Amendment: 3......

Major-Safety and environmental........
Major-Safeguards...........
Minor-Safety and environmental.
Minor-Safeguards.........

Administrative..........
(b) Storage facility to be located at the Application..............
site of an existing nuclear facility. 5 New license...........

Renewal..........
Amendment: 3

Major-Safety and environmental.
Major-Safeguards..........
Minor-Safety and environmental........

88,500 6,200 3,500 3,500

150

25,000 236,600 32,000

88,500 6,200 3,500 3,500

150 15,000 130,000 32,000

88,500 6,200 3,500

See footnotes at end of table.

SCHEDULE OF FEES FOR MATERIALS LICENSES AND OTHER REGULATORY SERVICES—Continued

[graphic]

Minor-Safeguards..

Administrative..... (3) License application for an ISFSI of

duplicate design-design which is identi-
cal to a previously licensed detail
design:
(a) Storage facility to be located at a Application..
new site.

New license.......
Renewal..
Amendment: 3

Major-Safety and environmental...
Major--Safeguards.....
Minor-Safety and environmental.
Minor-Safeguards.....

Administrative.............
(b) Storage facility to be located at the Application..........
site of an existing nuclear facility. 5 New license.........

Renewal.
Amendment: 3
Major-Safety and environmental..
Major-Safeguards.......
Minor-Safety and environmental..
Minor-Safeguards......

Administrative.........
I. Licenses for possession and use of special Application-New license..........

nuclear material in sealed sources contained Renewal..........
in devices used in industrial measuring sys- Amendment..........

tems. 2
J. All other special nuclear material licenses, Application New license....

except licenses authorizing special nuclear Renewal..........
material in unsealed form in combination Amendment....
that would constitute a critical quantity as
defined in $ 150.11 of Part 150 which shall
pay the same rate as Category 1G and
special nuclear material for use in power
generation which shall pay the fee in Cate-

gory 10.2
2. Source material:
A. Licenses for possession and use of source Application.....
material in milling operations, except in in New license 4...
situ leaching and heap-leaching operations. Renewal 4 .....

Amendment: 3 ..............

Major-Safety and environmental 4.
Minor-Safety and environmental *

Administrative...................
B. Licenses for processing and recovery of Production scale activity:........

source material in in situ leaching operations Application..........
or heap-leaching operations.

New license 4
Research and development scale activity:.

Application.
New license 4 ..

Renewal
Amendment: 3.....

Major-Safety and environmental 4 ...
Minor-Safety and environmental..........

Administrative........ C. Licenses for refining uranium mill concen Application ......... trates to uranium hexafluoride.

New license 4.
Renewal 4 ..........
Amendment: 3 .........

Major-Safety and environmental 4
Minor-Safety and environmental

Administrative...........
D. All other source material licenses....

Application New license.........
Renewal...........
Amendment....

See footnotes at end of table.

SCHEDULE OF FEES FOR MATERIALS LICENSES AND OTHER REGULATORY SERVICES-Continued

[merged small][ocr errors][ocr errors]
[blocks in formation]

3. Byproduct material:
A. Licenses for possession and use of byprod- Application New license........

uct material issued pursuant to Parts 30 and Renewal...........
33 of this chapter for processing or manu- | Amendment.......
facturing of items containing byproduct ma-
terial for commercial distribution, except by-
product material for use in power generation

which shall pay the fee in category 10.
B. Licenses issued pursuant to $ 32.72 of this Application New license.

chapter authorizing the processing or manu- Renewal........... facture and distribution of radiopharmaceuti- | Amendment............

cals containing byproduct material.
C. Licenses for byproduct material issued pur- Application–New license.....

suant to Part 34 of this chapter for industrial Renewal..........
radiography operations performed in shield- | Amendment..........
ed radiography installation(s) or permanently
designated area(s) at the address(es) listed

in the license.
D. Licenses for byproduct material issued pur Application–New license..

suant to Part 34 of this chapter for industrial Renewal....
radiography operations performed in a Amendment........
shielded radiography installation(s) and at
multiple temporary locations at the
address(es) shown in the licenses or at
temporary jobsites of the licensee in the

field.
E. Licenses for possession and use of byprod Application–New license.......

uct material in sealed sources for irradiation Renewal............ of materials where the source is not re Amendment......... moved from its shield (self-shielded units). F. Licenses for possession and use of byprod Application-New license.

uct material in sealed sources for irradiation Renewal.......... of materials where the source is exposed for Amendment...

irradiation purposes.
G. Licenses issued pursuant to Subpart B of Application, New license.......

Part 32 of this chapter to distribute items Renewal....
containing byproduct material or quantities of | Amendment....
byproduct material to persons generally li-
censed under Parts 31 or 35 of this chapter,
except specific licenses authorizing redis-
tribution of items which have been manufac-
tured or imported under a specific license
and licensed by the Commission for distribu-
tion to persons generally licensed under

Parts 31 or 35 of this chapter.
H. Licenses issued pursuant to Subpart A of Application New license.......

Part 32 of this chapter to distribute items Renewal..............
containing byproduct material or quantities of Amendment....
byproduct material to persons exempt from
the licensing requirements of Part 30 of this
chapter, except: (1) $$ 32.11 and 32.18 of
this chapter, (2) specific licenses authorizing
redistribution of items and quantities which
have been manufactured or imported under
a specific license and licensed by the Com-
mission for distribution to persons exempt
from the licensing requirements of Part 30 of
this chapter, and (3) specific licenses which
authorize distribution of timepieces, hands,

and dials.
1. Licenses issued pursuant to $ 32.18 of this Application-New license.

chapter to distribute quantities of byproduct Renewal......... material to persons exempt from the licens- Amendment ........

ing requirements of Part 30 of this chapter.
J. Licenses issued pursuant to $ 32.14 of this Application New issue..

chapter to distribute timepieces, hands, and Renewal...........
dials containing hydrogen 3 or promethium Amendment...
147 to persons exempt from the licensing
requirements of Part 30 of this chapter.

[merged small][ocr errors][merged small][merged small][merged small][merged small]

See footnotes at end of table.

« PreviousContinue »