ducing or utilizing special nuclear material.

(b) "Government agency" means any executive department, commission, independent establishment, corporation, wholly or partly owned by the United States of America which is an instrumentality of the United States, or any board, bureau, division, service, office, officer, authority, administration, or other establishment in the executive branch of the Government.

(c) "Materials License" means a byproduct material license issued pursuant to Part 30 of this chapter, or a source material license issued pursuant to Part 40 of this chapter, or a special nuclear material license issued pursuant to Part 70 of this chapter, or a license for the storage of spent fuel issued pursuant to Part 72 of this chapter.

(d) "Nuclear reactor" means an apparatus, other than an atomic weapon, designed or used to sustain nuclear fission in a self-supporting chain reaction.

(e) "Other production or utilization facility" means a facility other than a nuclear reactor licensed by the Commission under the authority of section 103 or 104 of the Atomic Energy Act of 1954, as amended (the Act), and pursuant to the provisions of Part 50 of this chapter.

of

(f) "Power reactor" means a nuclear reactor designed to produce electrical or heat energy licensed by the Commission under the authority of section 103 or subsection 104b of the Act and pursuant to the provisions § 50.21(b) or § 50.22 of this chapter. (g) "Production facility" means: (1) Any nuclear reactor designed or used primarily for the formation of plutonium or uranium-233; or

(2) Any facility designed or used for the separation of the isotopes of uranium or the isotopes of plutonium, except laboratory scale facilities designed or used for experimental or analytical purposes only; or

(3) Any facility designed or used for the processing of irradiated materials containing special nuclear material except:

(i) Laboratory scale facilities designed or used for experimental or analytical purposes;

(ii) Facilities in which the only special nuclear materials contained in the irradiated material to be processed are uranium enriched in the isotope U235 and plutonium produced by the irradiation, if the material processed contains not more than 10-6 grams of plutonium per gram of U235 and has fission product activity not in excess of 0.25 millicurie of fission products per gram of U235, and

(iii) Facilities in which processing is conducted pursuant to a license issued under Parts 30 and 70 of this chapter, or equivalent regulations of an Agreement State, for the receipt, possession, use, and transfer of irradiated special nuclear material, which authorizes the processing of the irradiated material on a batch basis for the separation of selected fission products and limits the process batch to not more than 100 grams of uranium enriched in the isotope 235 and not more than 15 grams of any other special nuclear material.

(h) "Research reactor" means a nuclear reactor licensed by the Commission under the authority of subsection 104c of the Act and pursuant to the provisions of § 50.21(c) of this chapter for operation at a thermal power level of 10 megawatts or less, and which is not a testing facility as defined by paragraph (m) of this section.

(i) "Sealed source" means any byproduct material that is encased in a capsule designed to prevent leakage or escape of the byproduct material.

(j) "Source material" means:

(1) Uranium or thorium, or any combination thereof, in any physical or chemical form; or

(2) Ores which contain by weight one-twentieth of one percent (0.05%) or more of (i) uranium, (ii) thorium, or (iii) any combination thereof. Source material does not include special nuclear material.

(k) "Special nuclear

means:

material"

(1) Plutonium, uranium-233, uranium enriched in the isotope 233 or in the isotope 235, and any other material which the Commission, pursuant to the provisions of section 51 of the Act, determines to be special nuclear material but does not include source material; or

(2) any material artificially enriched by any of the foregoing, but does not include source material.

(1) "Manufacturing license" means a license pursuant to Appendix M of Part 50 of this chapter to manufacture a nuclear power reactor(s) to be operated at sites not identified in the license application.

(m) "Testing facility" means a nuclear reactor licensed by the Commission under the authority of subsection 104c of the Act and pursuant to the provisions of § 50.21(c) of this chapter for operation at:

(1) A thermal power level in excess of 10 megawatts; or

(2) A thermal power level in excess of 1 megawatt, if the reactor is to contain:

(i) A circulating loop through the core in which the applicant proposes to conduct fuel experiments; or

(ii) A liquid fuel loading; or

(iii) An experimental facility in the core in excess of 16 square inches in cross-section.

(n) "Utilization facility" means any nuclear reactor other than one designed or used primarily for the formation of plutonium or U235 and any other equipment or device determined by rule of the Commission to be a utilization facility within the purview of subsection 11cc of the Act.

(0) [Reserved]

(p) "Human use" means the internal or external administration of byproduct, source, or special nuclear material, or the radiation therefrom, to human beings.

(q) "Nuclear Steam Supply System" consists of the reactor core, reactor coolant system, and related auxiliary systems including the emergency core cooling system; decay heat removal system; and chemical volume and control system.

(r) "Balance of plant" consists of the remaining systems, components, and structures that comprise a complete nuclear power plant and are not included in the nuclear steam supply system.

(s) "Special projects" means those projects submitted to the Commission for review and for which specific fees are not prescribed in this chapter. Examples of special projects include, but

are not limited to, topical reports, early site reviews, waste solidification facilities, fuel reprocessing facilities, and amendment or renewal of standardized reference design approvals.

(t) "Routine inspection" means an inspection performed at frequencies or during a certain period of time prescribed by the Commission for purposes of reviewing a licensee's authorized activities to assure that they are being conducted in accordance with regulatory or statutory requirements and that associated facilities and equipment are being operated in a safe

manner.

(u) "Duplicate unit" means one of a limited number of the same kind of units which are to be constructed within a limited time span and subject to review at the same time by the staff.

(v) "Replicate unit" means a unit based on the reuse of a plant design, previously reviewed and approved for construction by the same utility or by another utility as part of another construction permit application.

(w) "Reference systems concept" means a concept that involves the review of an entire facility design or major fraction of a facility design outside of the context of a license application. The standard design would be referenced in subsequent license applications.

(x) "Advanced reactor" means any nuclear reactor concept other than light water reactors and high temperature gas cooled reactors.

[33 FR 10924, Aug. 1, 1968, as amended at 36 FR 146, Jan. 6, 1971; 38 FR 30254, Nov. 2, 1973; 40 FR 8794, Mar. 3, 1975; 43 FR 7218, Feb. 21, 1978; 46 FR 58284, Dec. 1, 1981] § 170.4 Interpretations.

Except as specifically authorized by the Commission in writing, no interpretation of the meaning of the regulations in this part by an officer or employee of the Commission other than a written interpretation by the General Counsel will be recognized to be binding upon the Commission.

[blocks in formation]
[blocks in formation]

(a) No application fees, license fees, renewal fees, or inspection fees shall be required for:

(1) A license authorizing the export only of a production or utilization facility.

(2) A license authorizing the export only or import only of byproduct material, source material or special nuclear material.

(3) A license authorizing the receipt, ownership, possession, use or production of byproduct material, source material, or special nuclear material incidental to the operation of a production or utilization facility licensed under Part 50 of this chapter, including a license under Part 70 of this chapter, authorizing possession and storage only of special nuclear material at the site of a nuclear reactor for use as fuel in operation of the nuclear reactor or at the site of a spent fuel processing plant for processing at the plant.

(4) A construction permit or license applied for by, or issued to, a nonprofit educational institution for a production facility or utilization facility, other than a power reactor, to be used for teaching, training, or medical purposes, or for byproduct material, source material, or special nuclear material to be used for teaching, training, or medical purposes, or in connection with a facility, other than a power reactor, used for teaching, training, or medical purposes.

(5) A construction permit or license applied for by, or issued to, a Government agency, except for a utilization facility designed to produce electrical or heat energy pursuant to section 103 or 104b of the Atomic Energy Act of 1954, as amended.

(6)—(7) [Reserved]

(8) A license authorizing the use or source material as shielding only in de

vices and containers, provided, however, that all other licensed byproduct material, source material, or special nuclear material in the device or container will be subject to the fees prescribed in § 170.31.

(9) A license for possession and use of byproduct material, source material, or special nuclear material applied for by, or issued to, an agency of a State or any political subdivision thereof, except for licenses which authorize distribution of byproduct material, source material, or special nuclear material, or products containing byproduct material, source material, or special nuclear material, or licenses authorizing services to any person other than an agency or political subdivision of the State.

(10) Activities of the Commission undertaken, pursuant to Part 75 of this chapter, solely for the purpose of implementation of the US/IAEA Safeguards Agreement.

(b) (1) The Commission may, upon application by an interested person, or upon its own initiative, grant such exemptions from the requirements of this part as it determines are authorized by law and are otherwise in the public interest.

(2) Applications for exemption under this paragraph may include activities such as, but not limited to, the use of licensed materials for educational or noncommercial public displays or scientific collections.

[33 FR 10924, Aug. 1, 1968, as amended at 36 FR 146, Jan. 6, 1971; 36 FR 18173, Sept. 10, 1971; 37 FR 24029, Nov. 11, 1972; 38 FR 18443, July 11, 1973; 43 FR 7218, Feb. 21, 1978; 45 FR 50718, July 31, 1980]

§ 170.12 Payment of fees.

(a) Application fees. Each application for which a fee is prescribed shall be accompanied by a remittance in the full amount of the fee. No application will be accepted for filing or processed prior to payment of the full amount specified. Applications for which no remittance is received may be returned to the applicant. All application fees will be charged irrespective of the Commission's disposition of the application or a withdrawal of the application.

(b) License fees. Fees for review of applications for construction permits, operating licenses, manufacturing licenses, and materials licenses, are payable upon notification by the Commission when the review of the project is completed. For the purposes of this part the review of a project is completed when a permit or license is issued, or an application for a permit or license is denied, withdrawn, suspended, or action on the application is postponed.

(c) Amendment fees. The appropriate amendment fee shall accompany the application for amendment when filed with the Commission. Where applicable, the applicant shall provide a proposed determination of the amendment class and state the basis therefor as part of the amendment request and shall remit the fee corresponding to this determination with the application for amendment. The Commission will examine the amendment fee and will, where applicable, refund any overcharges or bill the applicant for the additional amendment fee.

(d) Renewal fees. The appropriate renewal fee shall accompany the renewal application when filed with the Commission.

(e) Approval Fees. Fees for review of applications for spent fuel cask and shipping container approvals, standardized spent fuel facility design approvals, and construction approvals are payable upon notification by the Commission when the review of the project is completed. For the purposes of this part the review of a project is completed when the approval is issued, or the application for an approval is denied, withdrawn, suspended, or action on the application is postponed. Fees for facility reference standardized design approvals will be paid in five (5) installments based on payment of 20 percent of the approval fee (see footnote 3 § 170.21) as each of

the first five (5) units of the approved design are referenced in an application(s) filed by a utility or utilities. In the event the standardized design approval application is denied, withdrawn, suspended, or action on the application is postponed, fees will be collected when the review is completed and the five (5) installment payment procedure will not apply.

(f) Special Project Fees. Fees for review of special projects are payable upon notification by the Commission when the review of the project is completed. For the purposes of this part the review of the project is completed upon notification by the staff that it has finished its review, upon withdrawal of the request, or suspension or postponement of further review.

(g) Inspection fees. Inspection fees are payable upon notification by the Commission.

(h) Method of payment. Fee payments shall be by check, draft, or money order made payable to the U.S. Nuclear Regulatory Commission.

(i) This section applies to all applications for licenses, permits, approvals or requests for review of special projects on file with the Commission on or after March 23, 1978.

[43 FR 7218, Feb. 21, 1978, as amended at 46 FR 49576, Oct. 7, 1981]