... problems involved in both the private and the naval shipyards . We want to see what can be done to be helpful to both so that there is a firm foundation for the shipyards in this country . We are especially going to look for a firm ...
... problems involved in both the private and the naval shipyards . We want to see what can be done to be helpful to both so that there is a firm foundation for the shipyards in this country . We are especially going to look for a firm ...
Page 8
... problems . The contract definition phase is where we departed most from traditional Navy ship procurement practices . In the past , we had developed contract designs for ships in - house within the Navy , and then negotiated with ...
... problems . The contract definition phase is where we departed most from traditional Navy ship procurement practices . In the past , we had developed contract designs for ships in - house within the Navy , and then negotiated with ...
Page 9
... are expected to go a long way toward heading off future claims against the Navy by shipbuilding contractors , a problem that has been plaguing us for the last several years . BILLIONS OF DOLLARS 1.5 1.0 5 3.0 2.5 2.0 It 9.
... are expected to go a long way toward heading off future claims against the Navy by shipbuilding contractors , a problem that has been plaguing us for the last several years . BILLIONS OF DOLLARS 1.5 1.0 5 3.0 2.5 2.0 It 9.
Page 13
... problems that have been experienced in retention of naval personnel and with the additional difficulty inherent in all voluntary recruitment , it is important that Navy life be made as attractive as possible . Consequently , the home ...
... problems that have been experienced in retention of naval personnel and with the additional difficulty inherent in all voluntary recruitment , it is important that Navy life be made as attractive as possible . Consequently , the home ...
Page 15
... problems . From the naval shipyard side , removal of this work would reduce the employment in the remaining shipyards to a point below their lowest efficient levels . Thus , unit cost would rise and overhaul durations would grow . Both ...
... problems . From the naval shipyard side , removal of this work would reduce the employment in the remaining shipyards to a point below their lowest efficient levels . Thus , unit cost would rise and overhaul durations would grow . Both ...
Common terms and phrases
Admiral BURK AIR WARFARE SYSTEM aircraft carriers assigned BENNETT BERTH building Charleston CHARLESTON NAVAL SHIPYARD COAST commercial completed CONGRESS THE LIBRARY conversion cost crane currently Defense deleted developed docks drydock electronics employees employment engineering feet fiscal fleet functional work group GINN graving docks improvements increase KOLPINO labor LIBRARY OF CONGRESS located machine major manpower Mare Island Maritime Administration military construction million missile MOLLOHAN naval ship naval shipyard complex Navy Norfolk NORFOLK NAVAL SHIPYARD NORRIS notional ship nuclear submarines operation overhaul and repair PEARL HARBOR percent personnel Philadelphia Philadelphia Naval Shipyard pier pollution Portsmouth Portsmouth Naval Shipyard private shipyards private yards production propeller Puget Sound repair industry SEVERODVINSK ship construction ship repair shipbuilding industry shipfitters skills SLIDE Soviet STRATEGIC SUB WARFARE SYS surface ships tankers tion TOTAL utilization WARFARE SYSTEM ANTI waterfront welding workload World War II
Popular passages
Page 109 - Shipyard maintains and operates facilities "to provide logistic support for assigned ships and service craft; to perform authorized work in connection with construction, conversion, overhaul, repair, alteration, drydocking, and outfitting of ships and craft, as assigned; to perform manufacturing, research, development, and test work, as assigned; and to provide services and material to other activities and units, as directed by competent authority.
Page 2 - Commander for Industrial and Facility Management. It is a pleasure to appear before you today at these hearings on the naval and private shipyards. The Navy considers this to be an extremely important testimony since, together, the naval and private shipyards represent a major element in the security of our nation. With the concurrence of the subcommittee. I will first present the goals and objectives of the Naval Sea Systems Command in carrying out its mission relative to ship construction, conversion,...
Page 177 - Attaching particular significance to the limitation of strategic arms and determined to continue their efforts begun with the Treaty on the Limitation of Anti-Ballistic Missile Systems and the Interim Agreement on Certain Measures with Respect to the Limitation of Strategic Offensive Arms...
Page 99 - ... security policy. At the same time, they constitute a positive asset that, when integrated into other elements of policy, directly support our national interests on a global scale. We have addressed our task in two parts. The first is to continue providing the essential element of nuclear deterrence represented by our POLARIS and POSEIDON submarines.
Page 67 - ... adjoining shorelines or cause a sludge or emulsion to be deposited beneath the surface of the water or upon adjoining shorelines.
Page 64 - The Secretary of Commerce, with the advice of and in coordination with the Secretary of the Navy, shall, at least once each year, as required for purposes of this Act, survey the existing privately owned shipyards capable of merchant ship construction, or review available data on such shipyards if deemed adequate, to determine whether their capabilities for merchant ship construction, including facilities and skilled personnel...
Page 149 - ... we have had to cease comparing the number of warships of one type or another and their total displacement (or the number of guns in a salvo or the weight of this salvo), and turn to a more complex, but also more correct appraisal of the striking and defensive power of ships, based on a mathematical analysis of their capabilities and qualitative characteristics.
Page 81 - Act, survey the existing privately owned shipyards capable of merchant ship construction, or review available data on such shipyards if deemed adequate, to determine whether their capabilities for merchant ship construction, including facilities and skilled personnel, provide an adequate mobilization base at strategic points for purposes of national defense and national emergency.
Page 177 - Agreed Statement. Modern submarine-launched ballistic missiles are: for the United States of America, missiles installed in all nuclearpowered submarines; for the Union of Soviet Socialist Republics, missiles of the type installed in nuclear-powered submarines made operational since 1965; and for both Parties, submarine-launched ballistic missiles first flight-tested since 1965 and installed in any submarine, regardless of its type.
Page 132 - Tenneco will not allow performance of work on non-Navy contracts to interfere with the performance of work necessary to meet Newport News commitments on Navy contracts.