(ii) The chemical and physical analyses and the results of field-site trials and greenhouse tests are accompanied by a certification from a qualified soil scientist or agronomist.

(iii) The alternative material is removed, segregated, and replaced in conformance with this section.

(b) Topsoil redistribution. (1) After final grading and before the topsoil is replaced, regraded land shall be sacrificed or otherwise treated to eliminate slippage surfaces and to promote root penetration.

(2) Topsoil shall be redistributed in a manner that

(i) Achieves an approximate uniform thickness consistent with the postmining land uses.

(ii) Prevents excess compaction of the spoil and topsoil; and

(iii) Protects the topsoil from wind and water erosion before it is seeded and planted.

(c) Topsoil storage. If the permit allows storage of topsoil, the stockpiled topsoil shall be placed on a stable area within the permit area where it will not be disturbed or be exposed to excessive water, wind erosion, or contaminants which lessen its capability to support vegetation before it can be redistributed on terrain graded to final contour. Stockpiles shall be selectively placed and protected from wind and water erosion, unnecessary compaction, and contamination by undesirable materials either by a vegetative cover as defined in § 177.110(g) or by other methods demonstrated to provide equal protection such as snow fences, chemical binders, and mulching. Unless approved by the regulatory authority, stockpiled topsoil shall not be moved until required for redistribution on a disturbed area.

(d) Nutrients and soil amendments. Nutrients and soil amendments in the amounts and analyses as determined by soil tests shall be applied to the surface soil layer so that it will support the postmining requirements of § 177.104 and the revegetation requirments of § 177.110.

§ 177.108 Protection of the hydrologic system.

The permittee shall plan and conduct coal mining and reclamation operations to minimize disturbance to the prevailing hydrologic balance in order to prevent long-term adverse changes in the hydrologic balance that could result from surface coal mining and reclamation operations, both onand off-site. Changes in water quality and quantity, in the depth to ground water, and in the location of surface water drainage channels shall be minimized such that the postmining land use of the disturbed land is not adversely affected and applicable Federal and Tribal statutes and regulations are not violated. The permittee shall conduct operations so as to minimize water pollution and shall, where necessary, use treatment methods to control water pollution. The permittee shall emphasize surface coal mining and reclamation practices that will prevent or minimize water pollution and changes in flows in preference to the use of water treatment facilities. Practices to control and minimize pcllution include, but are not limited to, stabilizing disturbed areas through grading, diverting runoff, achieving quick growing stands of temporary vegetation, lining drainage channels with rock or vegetation, mulching, sealing acid-forming and toxic-forming materials, and selectively placing waste materials in backfill areas. If pollution can be controlled only by treatment the permittee shall operate and maintain the necessary watertreatment facilities for as long as treatment is required.

(a) Water quality standards and effluent limitations. All surface drainage from the disturbed area, including disturbed areas that have been graded, seeded, or planted shall be passed through a sedimentation pond or a series of sedimentation ponds before leaving the permit area. Sedimentation ponds shall be retained until drainage from the disturbed area have met the water quality requirements of this section and the revegetation requirements of § 177.110 have been met. The regulatory authority may grant exemptions from this requirement

only when the disturbed drainage area within the total disturbed area is small if the permittee shows that sedimentation ponds are not necessary to meet the effluent limitations of this paragraph and to maintain water quality in downstream receiving waters. For purpose of this section only, disturbed area shall not include those areas in which only diversion ditches, sedimentation ponds, or roads are installed in accordance with this section and the upstream area is not otherwise disturbed by the permittee. Sedimentation ponds required by this paragraph shall be constructed in accordance with paragraph (e) of this section in appropriate locations prior to any mining in the affected drainage area in order to control sedimentation or otherwise treat water in accordance with this paragraph. Discharges from areas disturbed by surface coal mining and reclamation operations must meet all applicable Federal and Tribal laws and regulations and, at a minimum, the following numerical of effluent limitations:

[blocks in formation]

"In Arizona, Colorado, Montana, New Mexico, North Dakota, South Dakota, Utah, and Wyoming, total suspended solids limitations will be determined on a case-by-case basis, but they must not be greater than 45 mg/l (maximum allowable) and 30 mg/l (average of daily value for 30 consecutive discharge days) based on a representative sampling.

"Where the application of neutralization and sedimentation treatment technology results in inability to comply with the manganese limitations set forth, the regulatory authority may allow the pH level in the discharge to exceed to a small extent the upper limit of 9.0 in order that the manganese limitations will be achieved.

(1) Any overflow or other discharge of surface water from the disturbed

area within the permit area demonstrated by the permittee to result from a precipitation event larger than a 10year, 24-hour frequency event will not be subject to the effluent limitations of paragraph (a) of this section.

(2) The permittee shall install, operate, and maintain adequate facilities to treat any water discharged from the disturbed area that violates applicable Federal or Tribal laws or regulations or the limitations of paragraph (a) of this section. If the pH of waters to be discharged from the disturbed area is normally less than 6.0, an automatic lime feeder or other neutralization process approved by the regulatory authority shall be installed, operated, and maintained. If the regulatory authority finds (i) that small and infrequent treatment requirements to meet applicable standards do not necessitate use of an automatic neutralization process, and (ii) that the mine normally produces less than 500 tons of coal per day, then the regulatory authority may approve the use of a manual system if the permittee ensures consistent and timely treatment.

(b) Surface-water monitoring. (1) The permittee shall submit for approval by the regulatory authority a surface-water monitoring program which meets the following requirements:

(i) Provides adequate monitoring of all discharge from the disturbed area.

(ii) Provides adequate data to describe the likely daily and seasonal variation in discharges from the disturbed area in terms of water flow, pH, total iron, total manganese, and total suspended solids and, if requested by the regulatory authority, and other parameter characteristic of the discharge.

(iii) Provides monitoring at appropriate frequencies to measure normal and abnormal variations in concentrations. (iv) Provides an analytical quality control system including standard methods of analysis such as those specified in 40 CFR 136.

(v) Provides a regular report of all measurements to the regulatory authority within 60 days of sample collection unless violations of permit conditions occur in which case the regula

tory authority shall be notified immediately after receipt of analytical results by the permittee. If the discharge is subject to regulation by a Federal permit issued in compliance with the Federal Water Pollution Control Act Amendment of 1972 (33 U.S.C. §§ 1251-1378), a copy of the completed reporting form supplied to meet the permit requirements may be submitted to the regulatory authority to satisfy the reporting requirements, if the data meet the sampling frequency and other requirements of this paragraph.

(2) After disturbed areas have been regraded and stabilized in accordance with this part, the permittee shall monitor surface water flow and quality. Data from this monitoring shall be used to demonstrate that the quality and quantity of runoff without treatment will be consistent with the requirement of this section to minimize disturbance to the prevailing hydrologic balance and with the requirements of this part to attain the approved postmining land use. These data shall provide a basis for approval by the regulatory authority for removal of water quality or flow control systems and for determining when the requirements of this section are met. The regulatory authority shall determine the nature of data, frequency of collection, and reporting requirements.

(3) Equipment, structures, and other measures necessary to accurately measure and sample the quality and quantity of surface water discharges from the disturbed area of the permit area shall be properly installed, maintained, and operated and shall be removed when no longer required.

(c) Diversion and conveyance of overland flow away from disturbed areas. In order to minimize erosion and to prevent or remove water from contacting toxic-producing deposits, overland flow from undisturbed areas may, if required or approved by the regulatory authority, be diverted away from disturbed areas by means of temporary or permanent diversion structures. The following requirements shall be met:

(1) Temporary diversion structures are those used during mining and reclamation. When no longer needed,

these structures shall be removed and the area reclaimed. Temporary diversion structures shall be constructed to safely pass the peak runoff from a precipitation event with a 10-year recurrence interval, or a larger event as specified by the regulatory authority.

(2) Permanent diversion structures are those remaining after mining and reclamation and approved for retention by the regulatory authority and other appropriate Tribal and Federal agencies. To protect fills and property and to avoid danger to public health and safety, permanent diversion structures shall be constructed to safely pass the peak runoff from a precipitation event with a 100-year recurrence interval, or a larger event as specified by the regulatory authority. Permanent diversion structures shall be constructed with gently sloping banks that are stabilized by vegetation. Asphalt, concrete, or other similar linings shall not be used unless specifically required to prevent seepage or to provide stability and are approved by the regulatory authority.

(3) Diversions shall be designed, constructed, and maintained in a manner to prevent additional contributions of suspended solids to streamflow or to runoff outside the permit area to the extent possible, using the best technology currently available. In no event shall such contributions be in excess of requirements set by applicable Tribal or Federal law. Appropriate sediment control measures for these diversions shall include, but not be limited to, maintenances of appropriate gradients, channel lining, revegetation, roughness structures, and detention basins.

(d) Stream channel diversions. (1) Flow from perennial and intermittent streams within the permit area may be diverted only when the diversions are approved by the regulatory authority and they are in compliance with tribal and Federal statutes and regulations. When streamflow is allowed to be diverted, the new stream channel shall be designed and constructed to meet the following requirements:

(i) The average stream gradient shall be maintained and the channel designed, constructed, and maintained

40 056 0-79--26

to remain stable and to prevent additional contributions of suspended solids to streamflow, or to runoff outside the permit area to the extent possible, using the best technology currently available. In no event shall such contributions be in excess of requirements set by applicable Tribal or Federal law. Erosion control structures such as channel lining structures, retention basins, and artificial channel roughness structures shall be used only when approved by the regulatory agency for temporary diversions where necessary or for permanent diversions where they are stable and will require only infrequent maintenance.

(ii) Channel, bank, and flood-plain configurations shall be adequate to safely pass the peak runoff of a precipitation event with a 10-year recurrence interval for temporary diversions and a 100-year recurrence interval for permanent diversions, or larger events as specified by the regulatory authority.

(iii) Fish and wildlife habitat and water and vegetation of significant value for wildlife shall be protected in consultation with appropriate Tribal and Federal fish and wildlife management agencies.

(2) All temporary diversion structures shall be removed and the affected land regraded and revegetated consistent with the requirements of § 177.105 and § 177.110. At the time such diversions are removed, the permittee shall ensure that downstream water treatment facilities previously protected by the diversion are modified or removed to prevent over-topping or failure of the facilities.

(3) Buffer zone. No land within 100 feet of an intermittent or perennial stream shall be disturbed by surface coal mining and reclamation operations unless the regulatory authority specifically authorizes surface coal mining and reclamation operations through such a stream. The area not to be disturbed shall be designated a buffer zone and marked as specified in § 177.103.

(e) Sediment control measures. Appropriate sediment control measures shall be designed, constructed, and maintained to prevent additional con

tributions of sediment to stream flow or to runoff outside the permit area to the extent possible, using the best technology currently available. Sediment control measures may include, but not limited to, sedimentation ponds, diversion structures, sediment traps, straw dikes, riprap, check dams, vegetative filters, dugout ponds, and chemical treatment. Sedimentation ponds may be used individually or in a series and shall (either individually of in series) meet the following criteria:

(1) Sedimentation ponds must provide at least a 24-hour detention time and a surface area of at least 1 square foot for each 50 gallons per day of inflow for runoff entering the pond(s) that results from a 10-year, 24-hour precipitation event. Runoff diverted, in accordance with paragraphs (c) and (d) of this section, away from disturbed drainage areas need not be considered in sedimentation pond design. Required sedimentation pond surface area and detention time may be accordingly reduced by the appropriate use of chemical treatment measures such as flocculation and coagulation if approved by the regulatory authority.

(2) An additional sediment storage volume must be provided equal to 0.2 acre-feet for each acre of disturbed area within the upstream drainage area. Upon approval of the regulatory the authority, sediment storage volume may be reduced in an amount, as demonstrated by the permittee equal to the sediment removed by other appropriate sediment control

measures.

(3) Ponds may be of the permanent pool or self-dewatering type. Dewatering-type ponds shall use siphon or other dewatering methods approved by the regulatory authority to prevent discharges of pollutants within the design flow.

(4) Spillway systems shall be properly located to maximize the distances from the point of inflow into the pond to maximize detention times. Spillway systems shall be provided to safely discharge the peak runoff from a precipitation event with a 25-year recurrence interval, or larger event as specified by the regulatory authority.

(5) Sediment shall be removed from sedimentation ponds when the volume of sediment accumulates to 80 percent of the sediment storage volume required. Sediment removal shall be done in a manner that minimizes adverse effects on surface waters due to its chemical and physical characteristics, on infiltration, on vegetation, and on surface and ground water quality. Sediment that has been removed from sedimentation ponds and that meets the requirements for topsoil may be redistributed over graded areas in accordance with § 177.107.

(6) If a sedimentation pond has an embankment that is more than 20 feet in height, as measured from the upstream toe of the embankment to the crest of the emergency spillway, or has a storage volume of 20 acre-feet or more, the following additional requirements shall be met:

(i) An appropriate combination of principal and emergency spillways shall be provided to safely discharge the runoff resulting from a 100-year, 6-hour precipitation event, or larger event as specified by the regulatory authority.

(ii) Ponds shall be designed and constructed with an acceptable static safety factor of at least 1.5 of maximum design flood elevation of the pool to ensure embankment slope stability.

(iii) The minimum top width of the embankment shall not be less than the quotient of H+35/5 where H is the height of the embankment as measured from the upstream toe of the top of the embankment.

(iv) Ponds shall have appropriate barriers to control seepage along conduits that extend through the embankment.

(7) All pounds shall be designed and inspected under the supervision of, and certified after construction by a registered professional engineer.

(8) All ponds, including those not meeting the size or other criteria of 30 CFR 77.216(a), shall be examined for structural weakness, erosion, and other hazardous conditions in accordance with the inspection requirements contained in 30 CFR 77.216-3.

(9) All ponds shall be removed and the affected land regarded and revegetated consistent with the requirements of § 177.105 and § 177.110, unless the regulatory authority approves retention of the ponds pursuant to paragraph (k) of this section.

(f) Discharge structures. Discharges from sedimentation ponds and diversions shall be controlled, where necessary, using energy dissipators, surge ponds, and other devices to reduce erosion and prevent deepening or enlargement of stream channels and to minimize disturbances to the hydrologic balance.

(g) Acid and toxic materials. Drainage from acid-forming and toxic-forming mine waste materials and soils into ground and surface water shall be avoided by:

(1) Identifying, burying, and treating where necessary, spoil or other materials that, in the judgment of the regulatory authority, will be toxic to vegetation or that will adversely affect water quality if not treated or buried. Such material shall be disposed of in accordance with the provision of

§ 177.105(j);

(2) Preventing or removing water from contact with toxic-producing deposits;

(3) Burying or otherwise treating all toxic or harmful materials within 30 days, if such materials are subject to wind and water erosion, or within a lesser period designated by the regulatory authority. If storage of such materials is approved, the materials shali be placed on impermeable material and protected from erosion and contact with surface water. Coal waste ponds and other coal waste materials shall be maintained according to

§ 177.108(g)(4), and § 177.109 apply;

shall

(4) Burying or otherwise treating waste materials from coal preparation plants no later than 90 days after the cessation of the filling of the disposal area. Burial or treatment shall be in accordance with § 177.105(j);

(5) Casing, sealing or otherwise managing boreholes, shafts, wells, and auger holes or other more or less horizontal holes to prevent pollution of surface or ground water and to pre