Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. FP-69 |
From inside the book
Results 1-5 of 64
Page 75
... material and compacted in accordance with subsection 203.10 . If perishable material is burned , it shall be burned 75 201.03 CONSTRUCTION DETAILS Section 200-Earthwork Section 201-Clearing and Grubbing Construction Requirements.
... material and compacted in accordance with subsection 203.10 . If perishable material is burned , it shall be burned 75 201.03 CONSTRUCTION DETAILS Section 200-Earthwork Section 201-Clearing and Grubbing Construction Requirements.
Page 80
... compacted in accordance with sub- section 203.10 . 202.03 Removal of Bridges , Culverts , and Other Drainage Structures . Bridges , culverts , and other drainage structures in use by traffic shall not be removed until satisfactory ar ...
... compacted in accordance with sub- section 203.10 . 202.03 Removal of Bridges , Culverts , and Other Drainage Structures . Bridges , culverts , and other drainage structures in use by traffic shall not be removed until satisfactory ar ...
Page 81
... compacting the remaining cavity . Method of Measurement 202.06 When the contract stipulates that payment will be made for removal of obstructions on a lump sum basis , the pay item will include all structures and obstructions en ...
... compacting the remaining cavity . Method of Measurement 202.06 When the contract stipulates that payment will be made for removal of obstructions on a lump sum basis , the pay item will include all structures and obstructions en ...
Page 82
... compaction of all material not being removed under some other item which is encountered within the limits of the work and which is necessary for the construction of the roadway in accordance with the specifications and in rea- sonably ...
... compaction of all material not being removed under some other item which is encountered within the limits of the work and which is necessary for the construction of the roadway in accordance with the specifications and in rea- sonably ...
Page 84
... the required compacted thickness . Borrow material shall not be placed until after the readily accessible roadway excavation has been placed in the fill unless otherwise permitted or directed by the Engineer . If 84 203.07.
... the required compacted thickness . Borrow material shall not be placed until after the readily accessible roadway excavation has been placed in the fill unless otherwise permitted or directed by the Engineer . If 84 203.07.
Other editions - View all
Common terms and phrases
applied approved areas asphalt ASTM backfill Basis of Payment batch bid schedule bituminous material bituminous surface treatment bolts calcium chloride cleaned cofferdams compacted completed concrete condition Construction Requirements contract price contract unit price Contracting Officer crete Cubic yard curb curing damage depth designated determined as provided diameter embankment Emulsified Engineer equipment excavation expansion joints falsework feet finished forms gallon grade holes inch inspection joints layer length less Linear foot load masonry meet the requirements ment metal Method of Measurement minimum mixer mixing mixture mortar operations paid paint pavement Pay item Pay unit percent permitted piles pipe placed plans plant plates portland cement prestressing railing reasonably close conformity removed requirements of AASHO rivets roadbed roadway samples shown sieve special provisions specific gravity specified square yard stockpile stone Structural steel stud subgrade submerged arc welding suitable surface temperature thickness timber tion Unless otherwise valves weight welding width
Popular passages
Page 67 - ... race, creed, color, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Contracting Officer setting forth the provisions...
Page 66 - The Contractor warrants that no person or selling agency has been employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee...
Page 54 - ... the Government may, by written notice to the contractor, terminate his right to proceed with the work or such part of the work as to which there has been a failure to pay said...
Page 17 - Subsurface or latent physical conditions at the site differing materially from those indicated in this contract, or (2) unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as Inhering in work of the character provided for in this contract.
Page 68 - UTILIZATION OF SMALL BUSINESS CONCERNS (a) It is the policy of the Government as declared by the Congress that a fair proportion of the purchases and contracts for supplies and services for the Government be placed with small business concerns. (b) The Contractor agrees to accomplish the maximum amount of subcontracting to small business concerns that the Contractor finds to be consistent with the efficient performance of this contract. [End of Clause] (b) The Small Business Subcontracting Program...
Page 17 - Officer shall promptly investigate the conditions, and if he finds that such conditions do materially so differ and cause an increase or decrease in the Contractor's cost of, or the time required for, performance of any part of the work under this contract, whether or not changed as a result of such conditions, an equitable adjustment shall be made and the contract modified in writing accordingly.
Page 67 - The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, creed, color, or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
Page 65 - Government under this contract may be assigned to a bank, trust company, or other financing institution, including any Federal lending agency, and may thereafter be further assigned and reassigned to any such institution. Any such assignment or...
Page 68 - September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for noncompliance; Provided, however, That in the event the contractor becomes involved in or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the contracting agency, the contractor...
Page 63 - ... (c) All material and work covered by partial payments made shall thereupon become the sole property of the Government...