Open issues pertaining to the Launch Control Center (V28) are listed below. Resolution of these issues is planned during the integration

[blocks in formation]

The Parachute Refurbishment Facility, located at NVAFB, serves to receive, clean, inspect, repair or refurbish, verify for reuse, pack and ship recovered SRB parachutes and their associated miscellaneous hardware which have been received from retrieval operations at Port Hueneme. The Parachute Refurbishment Facility houses all personnel and equipment required to perform the management and operational tasks of parachute refurbishment.

Parachute Refurbishment Facility Station Set Significant Changes/
Accomplishments

Significant changes implemented in the Parachute Refurbishment Facility Station Set (V30) during the FY 76/78 GSS contract are presented in Table 2.9.2.

Table 2.9.2 Changes and Accomplishments

CHANGE/ACCOMPLISHMENT

Originated station set
definition.

REASON/REMARKS

Definition was not established

by previous contract.

2.9.3

VCR-78-123

Parachute Refurbishment Facility Documentation

Baseline documentation representing the allocated requirements baseline for V30 is presented in Table 2.9.3.

[blocks in formation]
[blocks in formation]

The V32 SRB Refurbishment and Subassembly Station Set encompasses the
mechanical, electrical, fluid, and supporting major components nec-
essary to store, assemble, service, and checkout the Solid Rocket
Boosters. The existing MOL RIS building located on SVAFB near SLC-6
will be modified and enlarged to accommodate the operating configura-
tion of the station set. A small explosives building for temporary
storage of pyrotechnics and a rail and access road system also will
be provided. New and refurbished solid rocket motor segments and new
SRB components are received from their vendors. Retrieved SRB compo-
nents are received from the V32 SRB Disassembly and the V30 Parachute
Refurbishment Station Sets. Components are stored, assembled, checked
out and delivered to the launch pad for SSV integration. Primary
operational functions in this station set are receiving, inspection,
dimensional checks, segment buildup, checkout and insulation/painting.

VCR-78-123

2.10.2 SRB Refurbishment and Storage Facility Station Set Significant Changes/ Accomplishments

Significant changes implemented in the SRB Refurbishment and Storage Facility Station Set (V31) during the FY 76/78 GSS contract are presented in Table 2.10.2.

[blocks in formation]

2.10.3

VCR-78-123

SRB Refurbishment and Storage Facility Documentation

Baseline documentation representing the allocated requirements baseline for V31 is presented in Table 2.10.3.

[blocks in formation]