Provide primary technical capability in Energetics for all warfare centers (Continued On DD 1390C) Form DD 1 Dec 76 1390 Submitted to Congress Page No. 203 through: engineering, fleet and operational support, manufacturing technology, limited production, industrial base support, and secondary technical capability through research, development, test and evaluation for: energetic materials, ordnance devices and components, and related ordnance engineering standards to include: chemicals, propellants and their propulsion systems, explosives, pyrotechnics, warheads, and simulators. 11. Outstanding Pollution And Safety Deficiencies ($000): a. Pollution Abatement (*): $16,200 b. Occupational Safety And Health (OSH) (#): S O Form DD 1 Dec 76 1390C Submitted to Congress Page No. 204 Provide primary technical capability in Energetics for all warfare centers (Continued On DD 1390C) Form DD 1 Dec 76 1390 Submitted to Congress Page No. 203 through: engineering, fleet and operational support, manufacturing technology, limited production, industrial base support, and secondary technical capability through research, development, test and evaluation for: energetic materials, ordnance devices and components, and related ordnance engineering standards to include: chemicals, propellants and their propulsion systems, explosives, pyrotechnics, warheads, and simulators. 11. Outstanding Pollution And Safety Deficiencies ($000): a. Pollution Abatement (*): $16,200 b. Occupational Safety And Health (OSH) (#): SO Form DD 1 Dec 76 1390C Submitted to Congress Page No. 204 Modernize the steam plant, Building 873, feed water treatment, cooling, and storage system by constructing a reverse osmosis/continuous deionization industrial water treatment system, constructing a steam plant auxiliary equipment cooling tower system, renovating boiler feed water storage tanks, and installing pumps, piping, and related equipment to operate and maintain the modernized system. Construct two replacement potable wells with chlorination systems, three elevated water storage tanks, and river water lines to provide a dedicated source of feed water to the steam plant. Install an integrated information system to allow for remote monitoring and control of major modernized system components. Technical operating manuals will accompany all primary system components. The Anti-terrorism Construction features will be provided. Demolition will include 27 buildings, six wells, five elevated water storage tanks, Form DD 1 Dec 76 1391 Submitted to Congress (Continued On DD 1391C) Page No. 205 |