1 FIGURE PS - 5 A City of Chicago Department of Air Pollution Control Room 500 - 320 N. Clark Street, Chicago, Illinois 60610 INSTALLATION PERMIT APPLICATION for OIL or GAS BURNER Permit No. CONSTRUCTION New OWNER'S NAME: CONTRACTOR: 2 PREPARED BY: BURNER MER: 14 Between the top of the bridgewall and the bottom of the curtain wall 15 Refractory: Walls, Roof, Bridge Wall and Curtain Wall or Baffles Thickness. 16 Exterior Walls: Red Brick Thickness. In. Air Space. In. U. S. Gauge Steel Casing No. Provide drawing, dimensioned and to scale, in plan, elevation and as many sections as are needed to show the design, operation, location and clearance of Incinerator; show also clearance of stack and breeching. Drawings shall be approved by a registered professional engineer and bear his seal. FIGURE PS- 7A City of Chicago Department of Air Pollution Control Room 500-320 N. Clark Street, Chicago, Illinois 60610 INSTALLATION PERMIT APPLICATION FOR PROCESS EQUIPMENT AND CONTROL DEVICES a. Type of Bldg. New d. Owner Name: FORM A 4615-052 Permit No. (Fill Out Both Side's) Permit Dete c. Installation Address: Exist. 5 EMISSION: Check types of discharge that can possibly be emitted from process or equipment either to room or directly to atmosphere through stocks or ducts. (0) ☐ Solid, particulate matter (•)Mists of Aerosols a. FORMS Permit File Plan Revie Fee Letter Fees Special Conditions A- APC File Permit Certificate of Operation |