Military Construction Appropriations for 1981: Justification of the budget estimates, Active ForcesU.S. Government Printing Office, 1980 - United States |
From inside the book
Results 1-5 of 100
Page 224
... .240 Window Alterations - Building 400 .240 Tobyhanna Army Depot .950 Insulate Permanent Buildings .680 Solar Energy Hot Water Heating .270 .620 30.697 PROJECT LISTING AUTHORITY REQUESTED OF CONGRESS IN THE FISCAL YEAR 38 224.
... .240 Window Alterations - Building 400 .240 Tobyhanna Army Depot .950 Insulate Permanent Buildings .680 Solar Energy Hot Water Heating .270 .620 30.697 PROJECT LISTING AUTHORITY REQUESTED OF CONGRESS IN THE FISCAL YEAR 38 224.
Page 336
... Permanent positions Positions other than permanent Other personnel compensation Total personnel compensation 134 , 350 160 , 503 163 , 983 Travel and transportation of persons 22 O Transportation of things 2,530 1,300 3,511 23.2 ...
... Permanent positions Positions other than permanent Other personnel compensation Total personnel compensation 134 , 350 160 , 503 163 , 983 Travel and transportation of persons 22 O Transportation of things 2,530 1,300 3,511 23.2 ...
Page 369
... permanent and temporary buildings . 35 permanent barracks and BOQ buildings will be retrofitted by installa- tion of all weather insulating panels in portions of windows , installation of storm windows , and weatherstripping . Temporary ...
... permanent and temporary buildings . 35 permanent barracks and BOQ buildings will be retrofitted by installa- tion of all weather insulating panels in portions of windows , installation of storm windows , and weatherstripping . Temporary ...
Page 370
... permanent build- ings and the central heating plant . Work is to include the installation of central console equipment and installation of sensing and control equipment . Telephone lines will be utilized to allow for sensing from a ...
... permanent build- ings and the central heating plant . Work is to include the installation of central console equipment and installation of sensing and control equipment . Telephone lines will be utilized to allow for sensing from a ...
Page 371
... permanent and temporary buildings . Fifty- three permanent barracks and BOQ buildings will be retro- fitted by installation of all weather insulating panels in portions of windows , installation of storm windows , and weatherstripping ...
... permanent and temporary buildings . Fifty- three permanent barracks and BOQ buildings will be retro- fitted by installation of all weather insulating panels in portions of windows , installation of storm windows , and weatherstripping ...
Common terms and phrases
1981 MILITARY CONSTRUCTION ADDITIONAL PERSONNEL NECESSARY AIR FORCE AIR NATIONAL GUARD APPROPRIATION REQUEST ACTIVE ARMY DEPOT Barracks BLDG CATEGORY CODE COMPONENT ARMY FY CONSTRUCTION PROJECT DATA COST ESTIMATES ITEM COST TO OPERATE COST Total DATE 15 Jan Date Design Complete Date Design Started DATE FY DESIGN DATA Estimated Energy Conservation Equipment Nomenclature ESTIMATED LIFE-CYCLE COST ESTIMATES ITEM U/M EXISTING FACILITY FISCAL YEAR 1981 Fort Hood Fort Polk FY 1981 MILITARY GERMANY INCLUDED IN FOLLOWING Inspection & Overhead INSTALLATION AND LOCATION ITEM U/M QUANTITY KELLY AFB Maintenance MEMO-NON-ADD MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT NATO NUMBER OF ADDITIONAL OPERATE AND MAINTAIN Percent Complete Primary Facility Production of Plans PROJECT DATA ARMY PROJECT NUMBER PROJECT TITLE QUANTITY UNIT COST Real Property Rock Island Arsenal Standard or Definitive storage SUPPLEMENTAL DATA Total Contract Cost Total Request Rounded U/M QUANTITY UNIT UNIT COST COST UNSPECIFIED WORLDWIDE Water Pollution WORLDWIDE UNSPECIFIED
Popular passages
Page 1493 - ... the Secretary of Defense determines that deferral of such construction for inclusion in the next Military Construction Authorization Act would be inconsistent with interests of national security, and in connection therewith to acquire, construct, convert, rehabilitate, or install permanent or temporary public works, including land acquisition, site preparation, appurtenances, utilities, and equipment...
Page 1326 - ... subject to the availability of space and facilities, and the capabilities of the professional staff.
Page 319 - MILITARY CONSTRUCTION, ARMY For acquisition, construction, installation, and equipment of temporary or permanent public works, military installations, facilities, and real property for the Army as currently authorized by law...
Page 1493 - ... if the Secretary of Defense determines that deferral of such construction for inclusion in the next military construction authorization Act would be Inconsistent with interests of national security, and in...
Page 1115 - LF 1,100 10. Mission or Major Functions: Maintain and operate facilities and provide services and material to support operations of a Marine Aircraft Wing, or units thereof, and other activities and units as designated by the Commandant of the Marine Corps in coordination with the Chief of Naval Operations.
Page 741 - The mission of this installation is to conduct basic and applied research and scientific and engineering investigations pertaining to operations in cold environments, methods and techniques of using various energy forms and systems to obtain information about surface and subsurface features, and to perform environmental and such other research in support of mission activities.
Page 1493 - Navy, or his designee, shall notify the Committees on Armed Services of the Senate and House of Representatives, immediately upon reaching a final decision to implement, of the cost of construction of any public work undertaken under this section, including those real estate actions pertaining thereto.
Page 1100 - California, is to provide housing, training facilities, logistical support, and certain administrative support for Fleet Marine Force units and other units assigned...
Page 679 - None b. Major Planned Next Three Years: None 10. MISSION OR MAJOR FUNCTIONS: Provides administrative and logistical support to Headquarters Army Aviation Research and Development Command, Headquarters, Troop Support and Aviation Material Readiness Command and to other Army and non-Army elements in the St.
Page 539 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY C.