Page 88
... QUANTITIES 420 ENERGY CONTROL SYSTEM- FT BENNING 130 FORT BENNING GA 16,580 FORT GORDON INSUL STRM WIND INSUL STRM WIND INSTALL REMOTE CTRL SWITCH ADJ FRESH AIR QUANTITY STEAM PLT MOD FORT GORDON 900 1,600 250 360 250 3,360 FT STEWART ...
... QUANTITIES 420 ENERGY CONTROL SYSTEM- FT BENNING 130 FORT BENNING GA 16,580 FORT GORDON INSUL STRM WIND INSUL STRM WIND INSTALL REMOTE CTRL SWITCH ADJ FRESH AIR QUANTITY STEAM PLT MOD FORT GORDON 900 1,600 250 360 250 3,360 FT STEWART ...
Page 181
... QUANTITIES FORT BENNING GA GEORGIA ENERGY CONTROL SYSTEM- FT BENNING FORT GORDON GEORGIA INSUL STRM WIND FORT GORDON GEORGIA INSUL STRM WIND FORT GORDON GEORGIA INSTALL REMOTE CTRL SWITCH FORT GORDON GEORGIA ADJ FRESH AIR QUANTITY FORT ...
... QUANTITIES FORT BENNING GA GEORGIA ENERGY CONTROL SYSTEM- FT BENNING FORT GORDON GEORGIA INSUL STRM WIND FORT GORDON GEORGIA INSUL STRM WIND FORT GORDON GEORGIA INSTALL REMOTE CTRL SWITCH FORT GORDON GEORGIA ADJ FRESH AIR QUANTITY FORT ...
Page 203
... Quantities Energy Control System Steam Plant Modification Fort Gillem .650 .130 .420 .660 2.600 Convert Building to Criminal ... Quantity .360 Install Remote Control Switch .250 Steam Plant Modification .250 Fort Stewart 36.556 Battalion ...
... Quantities Energy Control System Steam Plant Modification Fort Gillem .650 .130 .420 .660 2.600 Convert Building to Criminal ... Quantity .360 Install Remote Control Switch .250 Steam Plant Modification .250 Fort Stewart 36.556 Battalion ...
Page 404
... Quantity Cost ( $ 000 ) Shop Building No. 1 SF 20,996 59.50 1,249 Shop Building No. 2 SF 22,236 59.50 1,323 Shop Building SF 27,301 46.35 1,266 Solar LS 640 Bn Storage Buildings ( 2 ) LS 147 Oil Houses ( 5 ) LS 43 Dispatch Offices ( 3 ) ...
... Quantity Cost ( $ 000 ) Shop Building No. 1 SF 20,996 59.50 1,249 Shop Building No. 2 SF 22,236 59.50 1,323 Shop Building SF 27,301 46.35 1,266 Solar LS 640 Bn Storage Buildings ( 2 ) LS 147 Oil Houses ( 5 ) LS 43 Dispatch Offices ( 3 ) ...
Page 424
... Quantity Cost ( $ 000 ) Shop ( 1 / 11th Inf Bn ) SF 18,284 81.50 1,490 Shop ( 4th Engr Bn ) SF 28,404 85.95 2,442 Shop ( 43rd Supt . Grp ) SF 27,348 83.50 2,283 Shop ( Armor Bn ) SF 23,124 89.80 2,076 Unusual Foundation LS 319 Oil ...
... Quantity Cost ( $ 000 ) Shop ( 1 / 11th Inf Bn ) SF 18,284 81.50 1,490 Shop ( 4th Engr Bn ) SF 28,404 85.95 2,442 Shop ( 43rd Supt . Grp ) SF 27,348 83.50 2,283 Shop ( Armor Bn ) SF 23,124 89.80 2,076 Unusual Foundation LS 319 Oil ...
Common terms and phrases
1981 MILITARY CONSTRUCTION ADDITIONAL PERSONNEL NECESSARY AIR FORCE AIR NATIONAL GUARD APPROPRIATION REQUEST ACTIVE ARMY DEPOT Barracks BLDG CATEGORY CODE COMPONENT ARMY FY CONSTRUCTION PROJECT DATA COST ESTIMATES ITEM COST TO OPERATE COST Total DATE 15 Jan Date Design Complete Date Design Started DATE FY DESIGN DATA Estimated Energy Conservation Equipment Nomenclature ESTIMATED LIFE-CYCLE COST ESTIMATES ITEM U/M EXISTING FACILITY FISCAL YEAR 1981 Fort Hood Fort Polk FY 1981 MILITARY GERMANY INCLUDED IN FOLLOWING Inspection & Overhead INSTALLATION AND LOCATION ITEM U/M QUANTITY KELLY AFB MEMO-NON-ADD MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT NATO NUMBER OF ADDITIONAL OPERATE AND MAINTAIN Percent Complete Primary Facility Production of Plans PROJECT DATA ARMY PROJECT NUMBER PROJECT TITLE PROPOSED FACILITY QUANTITY UNIT COST Real Property Rock Island Arsenal Standard or Definitive storage Total Contract Cost Total Request Rounded U/M QUANTITY UNIT UNIT COST COST UNSPECIFIED WORLDWIDE Water Pollution WORLDWIDE UNSPECIFIED
Popular passages
Page 1501 - ... the Secretary of Defense determines that deferral of such construction for inclusion in the next Military Construction Authorization Act would be inconsistent with interests of national security, and in connection therewith to acquire, construct, convert, rehabilitate, or install permanent or temporary public works, including land acquisition, site preparation, appurtenances, utilities, and equipment...
Page 1334 - ... subject to the availability of space and facilities, and the capabilities of the professional staff.
Page 327 - MILITARY CONSTRUCTION, ARMY For acquisition, construction, installation, and equipment of temporary or permanent public works, military installations, facilities, and real property for the Army as currently authorized by law...
Page 1501 - ... if the Secretary of Defense determines that deferral of such construction for inclusion in the next military construction authorization Act would be Inconsistent with interests of national security, and in...
Page 1123 - LF 1,100 10. Mission or Major Functions: Maintain and operate facilities and provide services and material to support operations of a Marine Aircraft Wing, or units thereof, and other activities and units as designated by the Commandant of the Marine Corps in coordination with the Chief of Naval Operations.
Page 749 - The mission of this installation is to conduct basic and applied research and scientific and engineering investigations pertaining to operations in cold environments, methods and techniques of using various energy forms and systems to obtain information about surface and subsurface features, and to perform environmental and such other research in support of mission activities.
Page 1501 - Navy, or his designee, shall notify the Committees on Armed Services of the Senate and House of Representatives, immediately upon reaching a final decision to implement, of the cost of construction of any public work undertaken under this section, including those real estate actions pertaining thereto.
Page 1108 - California, is to provide housing, training facilities, logistical support, and certain administrative support for Fleet Marine Force units and other units assigned...
Page 687 - None b. Major Planned Next Three Years: None 10. MISSION OR MAJOR FUNCTIONS: Provides administrative and logistical support to Headquarters Army Aviation Research and Development Command, Headquarters, Troop Support and Aviation Material Readiness Command and to other Army and non-Army elements in the St.
Page 547 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY C.