Military Construction Appropriations for 1981: Justification of the budget estimates, Active ForcesU.S. Government Printing Office, 1980 - United States |
From inside the book
Results 1-5 of 100
Page 211
... Personnel Housing Modernization Unaccompanied Officer Personnel .630 Housing 1.050 Electrical Distribution System 1.200 Naval Security Group Activity , Winter Harbor 1.150 Ocean Surveillance Building Addition 1.150 AIR FORCE Loring Air ...
... Personnel Housing Modernization Unaccompanied Officer Personnel .630 Housing 1.050 Electrical Distribution System 1.200 Naval Security Group Activity , Winter Harbor 1.150 Ocean Surveillance Building Addition 1.150 AIR FORCE Loring Air ...
Page 336
... personnel compensation Total personnel compensation 134 , 350 160 , 503 163 , 983 Travel and transportation of persons 22 O Transportation of things 2,530 1,300 3,511 23.2 Communications , utilities and other rent 3,163 4,257 4,390 24.0 ...
... personnel compensation Total personnel compensation 134 , 350 160 , 503 163 , 983 Travel and transportation of persons 22 O Transportation of things 2,530 1,300 3,511 23.2 Communications , utilities and other rent 3,163 4,257 4,390 24.0 ...
Page 406
... personnel at Fort Bragg . CURRENT SITUATION : The barracks to be modernized does not provide the re- quired privacy and security for the troops ' personal belongings . Personnel are billeted in open bays or squad rooms without dayrooms ...
... personnel at Fort Bragg . CURRENT SITUATION : The barracks to be modernized does not provide the re- quired privacy and security for the troops ' personal belongings . Personnel are billeted in open bays or squad rooms without dayrooms ...
Page 472
... personnel . CURRENT SITUATION : The buildings to be modernized were built between 1927 and 1957. The limitation of existing designs preclude furnishing any of the personnel the privacy and floor space currently authorized . Bachelor ...
... personnel . CURRENT SITUATION : The buildings to be modernized were built between 1927 and 1957. The limitation of existing designs preclude furnishing any of the personnel the privacy and floor space currently authorized . Bachelor ...
Page 515
... personnel housed nearby . No facilities exist for personnel to be billeted in the east wing of the cantonment area . Barracks for the east wing were authorized and appropriated in FY 1980 . IMPACT IF NOT PROVIDED : No facilities will be ...
... personnel housed nearby . No facilities exist for personnel to be billeted in the east wing of the cantonment area . Barracks for the east wing were authorized and appropriated in FY 1980 . IMPACT IF NOT PROVIDED : No facilities will be ...
Common terms and phrases
1981 MILITARY CONSTRUCTION ADDITIONAL PERSONNEL NECESSARY AIR FORCE AIR NATIONAL GUARD APPROPRIATION REQUEST ACTIVE ARMY DEPOT Barracks BLDG CATEGORY CODE COMPONENT ARMY FY CONSTRUCTION PROJECT DATA COST ESTIMATES ITEM COST TO OPERATE COST Total DATE 15 Jan Date Design Complete Date Design Started DATE FY DESIGN DATA Estimated Energy Conservation Equipment Nomenclature ESTIMATED LIFE-CYCLE COST ESTIMATES ITEM U/M EXISTING FACILITY FISCAL YEAR 1981 Fort Hood Fort Polk FY 1981 MILITARY GERMANY INCLUDED IN FOLLOWING Inspection & Overhead INSTALLATION AND LOCATION ITEM U/M QUANTITY KELLY AFB Maintenance MEMO-NON-ADD MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT NATO NUMBER OF ADDITIONAL OPERATE AND MAINTAIN Percent Complete Primary Facility Production of Plans PROJECT DATA ARMY PROJECT NUMBER PROJECT TITLE QUANTITY UNIT COST Real Property Rock Island Arsenal Standard or Definitive storage SUPPLEMENTAL DATA Total Contract Cost Total Request Rounded U/M QUANTITY UNIT UNIT COST COST UNSPECIFIED WORLDWIDE Water Pollution WORLDWIDE UNSPECIFIED
Popular passages
Page 1493 - ... the Secretary of Defense determines that deferral of such construction for inclusion in the next Military Construction Authorization Act would be inconsistent with interests of national security, and in connection therewith to acquire, construct, convert, rehabilitate, or install permanent or temporary public works, including land acquisition, site preparation, appurtenances, utilities, and equipment...
Page 1326 - ... subject to the availability of space and facilities, and the capabilities of the professional staff.
Page 319 - MILITARY CONSTRUCTION, ARMY For acquisition, construction, installation, and equipment of temporary or permanent public works, military installations, facilities, and real property for the Army as currently authorized by law...
Page 1493 - ... if the Secretary of Defense determines that deferral of such construction for inclusion in the next military construction authorization Act would be Inconsistent with interests of national security, and in...
Page 1115 - LF 1,100 10. Mission or Major Functions: Maintain and operate facilities and provide services and material to support operations of a Marine Aircraft Wing, or units thereof, and other activities and units as designated by the Commandant of the Marine Corps in coordination with the Chief of Naval Operations.
Page 741 - The mission of this installation is to conduct basic and applied research and scientific and engineering investigations pertaining to operations in cold environments, methods and techniques of using various energy forms and systems to obtain information about surface and subsurface features, and to perform environmental and such other research in support of mission activities.
Page 1493 - Navy, or his designee, shall notify the Committees on Armed Services of the Senate and House of Representatives, immediately upon reaching a final decision to implement, of the cost of construction of any public work undertaken under this section, including those real estate actions pertaining thereto.
Page 1100 - California, is to provide housing, training facilities, logistical support, and certain administrative support for Fleet Marine Force units and other units assigned...
Page 679 - None b. Major Planned Next Three Years: None 10. MISSION OR MAJOR FUNCTIONS: Provides administrative and logistical support to Headquarters Army Aviation Research and Development Command, Headquarters, Troop Support and Aviation Material Readiness Command and to other Army and non-Army elements in the St.
Page 539 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY C.