Military Construction Appropriations for 1981: Justification of the budget estimates, Active ForcesU.S. Government Printing Office, 1980 - United States |
From inside the book
Results 1-5 of 100
Page 37
... INSULATION STORM WINDOWS 250 BERTHING PIER IMPROVEMENTS 5,850 NSB NEW LONDON 16 , 200 THAMES RIVER TRIDENT * DREDGE THAMES RIVER TRIDENT THAMES RIVER TRIDENT 4,400 4,400 NAVY 20,600 AIR NATIONAL GUARD BRADLEY ANG BASE FIRE STATION BASE ...
... INSULATION STORM WINDOWS 250 BERTHING PIER IMPROVEMENTS 5,850 NSB NEW LONDON 16 , 200 THAMES RIVER TRIDENT * DREDGE THAMES RIVER TRIDENT THAMES RIVER TRIDENT 4,400 4,400 NAVY 20,600 AIR NATIONAL GUARD BRADLEY ANG BASE FIRE STATION BASE ...
Page 49
... INSULATION - STORM WINDOWS UPGRD BLDG FOR RANGE + ADP FORT RITCHIE MD 3,800 1,500 2,550 230 260 8,340 44,430 ARMY NAVY NSRDC ANNAPOLIS VENTILATION IMPS 500 EGRESS IMPS 100 OIL SPILL PREVENT MEASURES 410 NSROC ANNAPOLIS 1,010 NATC ...
... INSULATION - STORM WINDOWS UPGRD BLDG FOR RANGE + ADP FORT RITCHIE MD 3,800 1,500 2,550 230 260 8,340 44,430 ARMY NAVY NSRDC ANNAPOLIS VENTILATION IMPS 500 EGRESS IMPS 100 OIL SPILL PREVENT MEASURES 410 NSROC ANNAPOLIS 1,010 NATC ...
Page 52
... INSULATION : STORM WINDOWS STEAM : CONDENSATE SYS IND WASTE COLL : TREAT MCB CAMP LEJUENE MCAS CHERRY POINT ORD EQUIP MAINT FACILITY ARMORY BULK LIME STRG HAND FACS IND WASTE COLL : TREAT MCAS CHERRY POINT * AUTHORIZED IN PRIOR YEAR 330 ...
... INSULATION : STORM WINDOWS STEAM : CONDENSATE SYS IND WASTE COLL : TREAT MCB CAMP LEJUENE MCAS CHERRY POINT ORD EQUIP MAINT FACILITY ARMORY BULK LIME STRG HAND FACS IND WASTE COLL : TREAT MCAS CHERRY POINT * AUTHORIZED IN PRIOR YEAR 330 ...
Page 54
... INSULATION - STORM WINDOWS 1,550 RADIOLOGICAL FAC ADD 1,850 ENERGY CONTROL SYSTEM MISC WATER POLL ABAT - WPC 1,600 1,750 PICATINNY ARSENAL NEW JERSEY 7,950 ARMY 10,990 NAVY NWS EARLE REACTION FORCE FAC ADDITION 180 * PIER IMPROVEMENTS ...
... INSULATION - STORM WINDOWS 1,550 RADIOLOGICAL FAC ADD 1,850 ENERGY CONTROL SYSTEM MISC WATER POLL ABAT - WPC 1,600 1,750 PICATINNY ARSENAL NEW JERSEY 7,950 ARMY 10,990 NAVY NWS EARLE REACTION FORCE FAC ADDITION 180 * PIER IMPROVEMENTS ...
Page 58
... INSULATION : STORM WINDOWS ENERGY CONSERVATION IMPR SPCC MECHANICSBURG NDAMCONTC PHILADELPHIA BUILDING ALTERATIONS NDAMCONTC PHILADELPHIA NSY PHILADELPHIA 560 3,850 3,000 230 3,000 10,640 16,790 720 150 240 2,400 2,790 170 170 OIL SPILL ...
... INSULATION : STORM WINDOWS ENERGY CONSERVATION IMPR SPCC MECHANICSBURG NDAMCONTC PHILADELPHIA BUILDING ALTERATIONS NDAMCONTC PHILADELPHIA NSY PHILADELPHIA 560 3,850 3,000 230 3,000 10,640 16,790 720 150 240 2,400 2,790 170 170 OIL SPILL ...
Common terms and phrases
1981 MILITARY CONSTRUCTION ADDITIONAL PERSONNEL NECESSARY AIR FORCE AIR NATIONAL GUARD APPROPRIATION REQUEST ACTIVE ARMY DEPOT Barracks BLDG CATEGORY CODE COMPONENT ARMY FY CONSTRUCTION PROJECT DATA COST ESTIMATES ITEM COST TO OPERATE COST Total DATE 15 Jan Date Design Complete Date Design Started DATE FY DESIGN DATA Estimated Energy Conservation Equipment Nomenclature ESTIMATED LIFE-CYCLE COST ESTIMATES ITEM U/M EXISTING FACILITY FISCAL YEAR 1981 Fort Hood Fort Polk FY 1981 MILITARY GERMANY INCLUDED IN FOLLOWING Inspection & Overhead INSTALLATION AND LOCATION ITEM U/M QUANTITY KELLY AFB MEMO-NON-ADD MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT NATO NUMBER OF ADDITIONAL OPERATE AND MAINTAIN Percent Complete Primary Facility Production of Plans PROJECT DATA ARMY PROJECT NUMBER PROJECT TITLE PROPOSED FACILITY QUANTITY UNIT COST Real Property Rock Island Arsenal Standard or Definitive storage Total Contract Cost Total Request Rounded U/M QUANTITY UNIT UNIT COST COST UNSPECIFIED WORLDWIDE Water Pollution WORLDWIDE UNSPECIFIED
Popular passages
Page 1501 - ... the Secretary of Defense determines that deferral of such construction for inclusion in the next Military Construction Authorization Act would be inconsistent with interests of national security, and in connection therewith to acquire, construct, convert, rehabilitate, or install permanent or temporary public works, including land acquisition, site preparation, appurtenances, utilities, and equipment...
Page 1334 - ... subject to the availability of space and facilities, and the capabilities of the professional staff.
Page 327 - MILITARY CONSTRUCTION, ARMY For acquisition, construction, installation, and equipment of temporary or permanent public works, military installations, facilities, and real property for the Army as currently authorized by law...
Page 1501 - ... if the Secretary of Defense determines that deferral of such construction for inclusion in the next military construction authorization Act would be Inconsistent with interests of national security, and in...
Page 1123 - LF 1,100 10. Mission or Major Functions: Maintain and operate facilities and provide services and material to support operations of a Marine Aircraft Wing, or units thereof, and other activities and units as designated by the Commandant of the Marine Corps in coordination with the Chief of Naval Operations.
Page 749 - The mission of this installation is to conduct basic and applied research and scientific and engineering investigations pertaining to operations in cold environments, methods and techniques of using various energy forms and systems to obtain information about surface and subsurface features, and to perform environmental and such other research in support of mission activities.
Page 1501 - Navy, or his designee, shall notify the Committees on Armed Services of the Senate and House of Representatives, immediately upon reaching a final decision to implement, of the cost of construction of any public work undertaken under this section, including those real estate actions pertaining thereto.
Page 1108 - California, is to provide housing, training facilities, logistical support, and certain administrative support for Fleet Marine Force units and other units assigned...
Page 687 - None b. Major Planned Next Three Years: None 10. MISSION OR MAJOR FUNCTIONS: Provides administrative and logistical support to Headquarters Army Aviation Research and Development Command, Headquarters, Troop Support and Aviation Material Readiness Command and to other Army and non-Army elements in the St.
Page 547 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY C.