Page images
PDF
EPUB
[blocks in formation]

OPERATION AND MAINTENANCE, GENERAL

For expenses necessary for the preservation, operation, maintenance, and care of existing river and harbor, flood control, and related works, including such sums as may be necessary for the maintenance of harbor channels provided by a State, municipality or other public agency, outside of harbor lines, and serving essential needs of general commerce and navigation; financing the United States share of the cost of operation and maintenance of the remedial works in the Niagara River; activities of the California Debris Commission; administration of laws pertaining to preservation of navigable waters; surveys and charting of northern and north

91

1 Selected resources as of June 30 are as follows:

Stores..

Unpaid undelivered orders.
Advances...

Total selected resources.----

1966 1963 1964 1965 200 200 180 306 12,837 12,185 10,614 8,711

2

13,019 12,491 10,814 8,911

This appropriation finances operation and maintenance of existing projects and other related activities. 1. Navigation projects.--In 1966 operation and mainteprojects and 31 locks, dams, and canals.

2. Flood control projects.--In 1966, 144 flood control reservoirs and 18 local flood protection projects will be operated and maintained. Other completed flood control projects will be inspected to determine the adequacy

of maintenance by local interests.

[subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][merged small][merged small][subsumed][subsumed][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][graphic][merged small][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][merged small][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][subsumed][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

31.0 Equipment........

6

[ocr errors]

300

400

100

100

[blocks in formation]

114 90 90

1. Executive direction and management.-The Office, 4,001 Chief of Engineers, and 10 division offices supervise work decentralized in 37 district offices. One division office and the district offices are financed from other appropriations.

920

134

$6,360 $6,391

For expenses necessary for general administration and related functions in the Office of the Chief of Engineers and offices of the Division Engineers; activities of the Board of Engineers for Rivers and Harbors and the Coastal Engineering Research Center; commercial statistics; and miscellaneous investigations; [$15,575,000] $16,662,000. (22 U.S.C. 266; 33 U.S.C. 426-426h, 541, 701, 703, 704; Public Works Appropriation Act, 1965.)

Program and Financing" (in thousands of dollars)

Identification code

2. River and Harbor Board.-The Board reviews reports on proposed projects and makes advisory recommendations to the Chief of Engineers.

3. Coastal Engineering Research Center.--The Center plans and conducts research in the field of coastal engineering, develops standards, and reviews technical reports as directed by the Chief of Engineers.

4. Commercial statistics.-Data on waterborne commerce are collected, compiled, and published.

5. Special investigations.-Investigations are made and reports prepared pursuant to congressional and other special requests for information on the civil works program.

Object Classification (in thousands of dollars)

[blocks in formation]

Total selected resources_-_

98

[blocks in formation]

11,739

11.5

08-10-3124-0-1-401

[blocks in formation]

Other personnel compensation..

Positions other than permanent..

12,677 13,027

33

26

33

[blocks in formation]

42

Pay to commissioned officers...

[blocks in formation]

419

[blocks in formation]

Total personnel compensation.

[blocks in formation]

(a) Office, Chief of Engineers...

5,262

5,627

(b) Division offices..

5,756

[blocks in formation]

2. River and Harbor Board.

578

670

22.0 Transportation of things..

Personnel benefits, military personnel...... 21.0 Travel and transportation of

880

969

[blocks in formation]

persons.

576

613

707

3. Coastal Engineering Research Center.....

[blocks in formation]

24.0

4. Commercial statistics..

[blocks in formation]

25.1

5. Special investigations.......

[blocks in formation]

23.0 Rent, communications, and utilities..

25

30

303

305

310

77

80

100

122

183

183

25.2

318

325

330

Services of other agencies.

[blocks in formation]

25.3 Payments to "Revolving fund, Corps of

162

160

160

[blocks in formation]

10 Total obligations...............

14,984

16,163

Equipment.............

49

55

[ocr errors]

989

675

60

[blocks in formation]

Financing:

[blocks in formation]

16,662

25 Unobligated balance lapsing..........

16

[blocks in formation]

Personnel Summary

16,662

[blocks in formation]

Total number of permanent positions.. Full-time equivalent of other positions.. Average number of all employees......

[blocks in formation]

increases..

588

Average GS salary..

8.0

Average salary of ungraded positions.

$7,890

8.0 $8,190

$8.265

$6,288

$6,360

$6,391

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

collected.

78,323

78,160

77,060

-2

78,321

78,160

77,060

6.922

8,600

8,760

-8,600

-8.760

-8,220

76,643

78,000

77,600

The Corps of Engineers-Civil is responsible for the flood control program for the lower Mississippi Valley 1. General investigations.-Two flood control studies will from Cape Girardeau, Mo., to the Gulf of Mexico, includ-be completed, and four will be continued. Basic data ing the main alluvial stream, the basins of the St. Francis subsequently used in planning and designing projects are and White, lower Arkansas, Yazoo, Tensas, and Atchafalaya Rivers, and Bayou Lafourche, and the alluvial lands around Lake Pontchartrain. The adopted plan calls for raising and strengthening about 1,600 miles of existing levees along the main river, for enlarging or constructing some 1,700 miles of levees on tributaries and in side basins, for channel improvement by bank stabilization and by dredging a navigation channel 12 feet deep and 300 feet wide from Baton Rouge, La., to Cairo, Ill., and for five flood-detention reservoirs on minor tributaries.

3. Construction.-The estimated total cost of flood control and related improvements in the lower Mississippi of which $1,370 million has been appropriated through River and its alluvial valley is estimated at $1,911 million, 1965. The funds requested will be applied to continuation of 10 features.

4. Maintenance.-Provision is made for operation and maintenance of major features of the project.

The following tabulation sets forth the program for each activity:

750-100-65-25

[blocks in formation]
« PreviousContinue »