Page images
PDF
EPUB
[ocr errors][ocr errors][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Program and Financing (in thousands of dollars)

476,590

4,769

481,359

Budget plan (amounts for research, development, test, and evaluation actions programed)

-4,769

Total number of permanent positions.. Full-time equivalent of other positions. Average number of all employees.. Average GS grade..

Average GS salary..

Average salary of ungraded positions..

1964 actual 1965 estimate 1966 estimate

-1,152

475,438

496,688

2,000

498,688

RESEARCH, DEVELOPMENT, TEST, AND EVALUATION, DEFENSE AGENCIES

-2,000

496,688

Personnel Summary

500,400

2,000

502,400

For expenses of activities and agencies of the Department of Defense (other than the military departments and the Office of Civil Defense), necessary for basic and applied scientific research, development, test, and evaluation; advanced research projects as may be designated and determined by the Secretary of Defense, pursuant to law; maintenance, rehabilitation, lease, and operation of facilities and equipment, as authorized by law, to remain available until expended; [$498,715,000 $500,400,000: Provided, That such amounts as may be determined by the Secretary of Defense to have been made available in other appropriations available to the Department of Defense during the current fiscal year for programs related to advanced research may be transferred to and merged with this appropriation to be available for the same purposes and time period: Provided further, That such amounts of this appropriation as may be determined by the Secretary of Defense may be transferred to carry out the purposes of advanced research to those appropriations for military functions under the Department of Defense which are being utilized for related programs, to be merged with and to be available for the same time period as the appropriation to which transferred, and not to exceed $1,000,000 may be transferred to the appropriation for "Salaries and expenses," Coast and Geodetic Survey, Department of Commerce, fiscal year 1966, for the expenses of the Worldwide Seismological Network Program.

[Not to exceed $990,000 of this appropriation may be transferred to the appropriation "Salaries and expenses", Coast and Geodetic Survey, Department of Commerce, fiscal year 1965 for the expenses of the Worldwide Seismological Network Program.] (78 Stat. 473; Department of Defense Appropriation Act, 1965; 78 Stat. 1024; Supplemental Appropriation Act, 1965.) Authorizing legislation to be proposed.

-2,000

500,400

1964 actual

467,877

5,095

472,972

1964 actual

-4,769

-117,819

27,446 53 26,600 8.5 $8,338 $6,881

458

124,596

475,438

1965 estimate

Obligations

1965 estimate

491,700

2,000

493,700

27,445 53 26,964 8.5 $8,843 $7,045

-2,000

-124,596

1.152

128,432

496,688

1966 estimate

27,444 53 27,059 8.5 $8,878 $7,065

1966 estimate

490,000

2,000

492,000

-2,000

-128,432

138,832

500,400

[blocks in formation]

24.0 Printing and reproduction..

25.1 Other services..

Note. Reconciliation of budget plan to obligations:

Total budget plan..

Deduct portion of plan to be obligated in subsequent years.
Add obligations of prior year budget plans..

Total obligations____

Object Classification (in thousands of dollars)

26.0 Supplies and materials.

31.0 Equipment....

32.0 Lands and structures.

41.0 Grants, subsidies, and contributions..

Total direct obligations

Reimbursable obligations: 25.1 Other services..

99.0

Total obligations....

1964 actual

2,708
0

136

2,844

226

1,724

3,860

1,014

165 443,292 4,049

10,409

35

259

467,877

472,972

5,132
14

186

5,332

442

Budget plan

(amounts for research, development, test, and
evaluation actions programed)

2,569

3,362

1,925 605 453,913 4,851 16,651 50 2,000

491,700

5,095 2,000

493,700

1964 actual 1965 estimate

434,000

1965 1966 estimate estimate

-1,014

36,510

5,942

475,438

6,749
30

149

6,928

584

2,525

2,925

2,035 550 453,737 4,784 14,882 50 1,000

490,000

2,000

492,000

498,715

-2,000

-4,100

-34

4,107

496,688

1966 estimate

500,400

500,400

1964 actual
481, 359
124,596
116, 209
472,972

1964 actual

1965 estimate
498, 688
128, 432
123, 444

Total number of permanent positions.
Full-time equivalent of other positions..
Average number of all employees
Average GS grade.

Average GS salary....

Average salary of ungraded positions.

434,000

-1,014

36,510

5,942

475,438

472,972

-4,769

468,203

352,081 -436,307

383,977

493, 700
Personnel Summary

Obligations

1965 estimate

1966 estimate
502, 400
138,832
128, 432

492,000

1964 actual

616
0

498,715

-2,000

-4,100

358

7.9 $7,706 $5,621

[blocks in formation]

1966 estimate

500,400

912 1 670 8.0

500,400

492,000

-2,000

490,000

453,007

-483,007

460,000

1965 1966 estimate estimate

894 4 866 8.0 $8,030 $8,110 $5,630 $5,659

EMERGENCY FUND, DEFENSE

For transfer by the Secretary of Defense, with the approval of the Bureau of the Budget, to any appropriation for military fune tions under the Department of Defense available for research, development, test, and evaluation, or procurement or production related thereto, to be merged with and to be available for the same purposes, and for the same time period, as the appropriation to which transferred; [$125,000,000 $150,000,000, and, in addition, not to exceed $150,000,000, to be used upon determination by the Secretary of Defense that such funds can be wisely, profitably, and practically used in the interest of national defense and to be derived by transfer from such appropriations available to the Department of Defense for obligation during the current fiscal year as the Secretary of Defense may designate: Provided, That any appropriations trans

[ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

1,779

1,779

150,000

-15,491

-35,270

-96,950

-36,510

-18,300
-3,000

36,000

400

2,600 18,300

1,779

1965 1966 estimate estimate

MILITARY CONSTRUCTION PROGRAM

118,293

118,293

125,000

-8,600

-34,800

-4,107

14,800 20,000

2,000

2,000

2,000

150,000

150,000

150,000

MILITARY CONSTRUCTION

The direct military construction programs for the Armed Forces, both Regular and Reserve, shown in the individual schedules of this title are summarized in the following table (in thousands of dollars):

118,293 150,000

118,293

150,000 93.293 -93,293 -213,293 25,000 30,000

1964 actual 1965 estimate 1966 estimate
897,396 862,361 1,225,900
43,200 30,300 42,500
46,925 18,200 88,200

987,521

910,861 1,356,600

Most of the appropriations required for the military construction accounts are dependent on the enactment of authorizing legislation. The details of this legislation have been completed and are being submitted to the Congress for early consideration.

1. Major construction. This category provides for acquisition of land for and construction of military projects in the United States and overseas as authorized in currently effective military construction acts and the new authorization referred to above. These authorizations include construction projects as defined in Department of Defense Directive 7040.2 where the estimated cost of such construction generally exceeds $25 thousand per project. Under this category the major program elements proposed for 1966 are as follows:

Strategic retaliatory forces.-Provision has been made for upgrading the previously authorized Minuteman sites and for improvement to the Titan II sites. Funds are also included for facilities to permit realignment and to insure safe and continued operation of the manned bomber force. Continental air and missile defense forces.-Structures to provide site relocation, additions and improvements for the Nike-Hercules air defense missile system are proposed, including further work to provide this system with protection against radiation fallout. Funds are provided for the construction of operational, training, maintenance, personnel, and other facilities to maintain the capability of interceptor aircraft.

General purpose forces.-For the Army elements of these forces the program provides for construction of airfield runways, parking aprons and hangars, tactical equipment maintenance shops, hardstands, and troop housing complexes with associated structures at major unit training stations in the United States and in several overseas areas. For naval and marine air squadrons, naval fleet units, and marine ground forces, construction of operational and personnel support facilities at air stations and waterfront installations in the United States and overseas is provided. The Air Force portion of this program provides for construction of operational, training, maintenance, supply and personnel facilities, at bases in the United States and overseas, for the tactical forces. Some of these facilities will support F-4 aircraft entering the inventory, and others a capability for special air warfare operations.

Sealift and airlift forces.-Additional operational and maintenance facilities will be provided to increase the effectiveness of the transport aircraft assigned to the Tactical Air Command and the Military Air Transport Command.

Reserve forces.-The facilities required for the training of the Reserve Forces include: armories, training centers and summer camps, nonarmory facilities such as maintenance shops and warehouses; and aviation facilities such as airfield pavements, maintenance shops, and training buildings. Under the realignment plan of the Army Guard and Reserve, all facilities required to support these forces will be financed in the Military Construction, Army National Guard appropriation beginning 1966.

Army's research construction effort will be devoted to Research and development.-A major portion of the facilities supporting development of the Nike-X missile system. Another major Army project is the medical biological research laboratory at Fort Detrick, Md. The significant Navy projects include a chemistry laboratory at the Naval Research Laboratory, Washington, D.C., and an underwater weapons laboratory associated with the Naval Ordnance Test Station, Calif. Air Force construction includes a science material laboratory at

MILITARY CONSTRUCTION Continued

Wright-Patterson Air Force Base, Ohio; an electronics laboratory at Griffiss Air Force Base, N.Y., and facilities for continued improvement of both the Atlantic and Pacific missile ranges. Funds are also included for a Titan III launch complex at Vandenberg Air Force Base, Calif.

General support. This grouping includes operational and training facilities, communication facilities, maintenance and production facilities, supply facilities, hospital and medical facilities, administrative facilities, troop housing and community facilities, and utilities and ground improvements. Such projects, although important to the effective functioning of the armed services, are not related directly to any one particular force or weapon system and, in fact, provide common support for any number of forces or systems. This grouping also covers all construction needs of the following Defense agencies: Defense Atomic Support Agency, Defense Communications Agency, Defense Intelligence Agency, Defense Supply Agency, National Security Agency, and the Advanced Research Projects Agency.

The estimate for Military Construction, Defense Agencies, includes $50 million to be used for the construction of facilities which may be required by the military services to meet emergency situations. When these requirements arise, funds in the needed amounts as determined by the Secretary of Defense will be transferred to the construction accounts of the military departments.

2. Minor construction.-Provision is made for construction of permanent and temporary projects that are not.

[blocks in formation]
[blocks in formation]

1964 actual

4. Supporting activities.-Provision is made for activities such as the defense access road program and minor land acquisitions.

Loran stations.-These funds are advanced to the Coast Guard for construction of loran stations in areas essential to the defense of the United States. Loran transmitting stations permit safe and effective operation of ships, submarines, and aircraft of the military services in all kinds of weather by an electronic system of navigation which provides continuous navigational positions by means of intersecting lines of position.

General and special funds:

MILITARY CONSTRUCTION, ARMY

For acquisition, construction, installation, and equipment of temporary or permanent public works, military installations, and facilities for the Army as currently authorized in military public works or military construction Acts, and in sections 2673 and 2675 of title 10, United States Code, [$300,393,000 $441,400,000, to remain available until expended. (Military Construction Appropriation Act, 1965; additional authorizing legislation to be proposed for $388,998,000.)

Program and Financing (in thousands of dollars)

Budget plan (amounts for construction actions programed)

185,868
7,000
17,000

600

210,468

395,877

606,345

-12,299 -383,452 -126

-9,822

200,646

[blocks in formation]
[blocks in formation]
[ocr errors][subsumed][subsumed][subsumed][ocr errors][ocr errors][ocr errors]
[blocks in formation]
[blocks in formation]

1966 estimate
543,900
241, 610
222, 710

617,007

525,000

1 Reimbursements from non-Federal sources are principally derived from the Capehart housing program (69
Stat. 646).

Object Classification (in thousands of dollars)

Total direct obligations....

Reimbursable obligations:
Personnel obligations..

12.0 Personnel benefits..
21.0 Travel and transportation of

25.1 Other services..

32.0 Lands and structures.

Note. Reconciliation of budget plan to obligations:
Total budget plan..

Deduct portion of budget plan to be obligated in subsequent years.
Add obligations of prior year budget plans..

Total obligations.............

persons

Total reimbursable obligations......

Total, Army.......

ALLOCATION ACCOUNTS

750-100-65-21

Personnel compensation:
Permanent positions...

Other personnel compensation...
Total personnel compensation. -

1964 actual

16,463
1,235

Program and Financing (in thousands of dollars)—Continued

Budget plan
(amounts for construction actions programed)

652

619

870

301

14,412

39,170
1,189

43,826
875
1,940 1,867

42,299

46,568

35

1

36

1965 1966 estimate estimate

1964 actual 1965 estimate 1966 estimate

1,282

1,500

1,000

3,000

900 25,000 100

354
5,114

355
10,000
13,323 20,000
115, 193
132
8

168,676

17.151 17.778

1,314

44,591 785 1,859 47,235

355 15,000 25,000

186,069 296,133

2,000

1,500

3,500

1,000 34,845 150

23

1

24

266,357 398,575

29,417

29,457

25,836
1,714 2,014 2,014
80
80
80
28,907 30,000 30,000
390,897 198,489 63,449
447,434 260,000 125,000

616,110 526,357 523,575

23

1

24

[blocks in formation]

1964 actual

ALLOCATION ACCOUNTS-Continued

12.0 Personnel benefits..

21.0 Travel and transportation of persons.

22.0 Transportation of things.
25.1 Other services.
25.2

Services of other agencies.
26.0 Supplies and materials....
31.0 Equipment...

32.0 Lands and structures..

617,007 -395,877

221,130

-55,491

46,300

211,939

Obligations are distributed as follows:
Defense Military, Army..
Office of Emergency Planning...
Commerce, Bureau of Public Roads.
Department of State..
Interior, Bureau of Mines.

ARMY

Object Classification (in thousands of dollars)-Continued

Total number of permanent positions..
Full-time equivalent of other positions.
Average number of all employees.
Average GS grade........

Average GS salary....

Average salary of ungraded positions..

ALLOCATION ACCOUNTS

Total number of permanent positions.
Average number of all employees..
Average GS grade....

Average GS salary__

Personnel Summary

1964 actual

Obligations

1965 estimate 1966 estimate

5,578

204

616,110

17 830 47

3

5,434

8.7

617,007

$8,320

$3,849

5

5

8.9 $8,635

[merged small][ocr errors][merged small]

530,000

-175,000

355,000

-46,300

-108,700

3

4

808

3,592

97 3,643

530,000

200,000

1 Average number of persons: 1964, 143; 1965, 145; 1966, 145.

5,827

101 5,705

8.7 $8,391

$3,826

526,357
25
3,618

3

3

8.9 $9,111

1965 1966 estimate estimate

1

1

2

1

18

525,000

-95,000

430,000

108,700

-278,700

260,000

1,374

1,425

525,000

523,575

25 1,400

5,889

101 5,787 8.7 $8,475

$3,826

1

1

23

3

3

8.9 $9,229

« PreviousContinue »