Military Construction Appropriations for 1983: Hearings Before a Subcommittee of the Committee on Appropriations, House of Representatives, Ninety-seventh Congress, Second Session, Subcommittee on Military Construction Appropriations, Part 2U.S. Government Printing Office, 1982 - United States |
From inside the book
Page 33
... Storage 5 ( 35 % By April ) McClellan AFB LOG 93 Integration Support Facility 10 ( 35 % By February ) OSH- Depot Maintenance Facility Fire Protection 35 Alter Jet Fuel Storage 35 Moffett NAS SYS 131 Unaccompanied Enlisted Per- sonnel ...
... Storage 5 ( 35 % By April ) McClellan AFB LOG 93 Integration Support Facility 10 ( 35 % By February ) OSH- Depot Maintenance Facility Fire Protection 35 Alter Jet Fuel Storage 35 Moffett NAS SYS 131 Unaccompanied Enlisted Per- sonnel ...
Page 46
... Storage Area AFE 496 Zweibrucken AB Alter Munitions Maintenance Facility Alter Data Processing Facility Energy Conservation Investment Program 900 900 35 AFE 499 1,020 1,020 510 510 35 35 100 Subtotal 42,073 42,073 Guam Andersen AFB SAC ...
... Storage Area AFE 496 Zweibrucken AB Alter Munitions Maintenance Facility Alter Data Processing Facility Energy Conservation Investment Program 900 900 35 AFE 499 1,020 1,020 510 510 35 35 100 Subtotal 42,073 42,073 Guam Andersen AFB SAC ...
Page 80
... STORAGE : Sixteen underground JP - 4 storage tanks , 50,000 gallons each ( 1190 BBL ) are not equipped with any vapor control system as required by Yuba County Air Pollution Control District ( YCAPCD ) Rule 3.9 . During the " Smog ...
... STORAGE : Sixteen underground JP - 4 storage tanks , 50,000 gallons each ( 1190 BBL ) are not equipped with any vapor control system as required by Yuba County Air Pollution Control District ( YCAPCD ) Rule 3.9 . During the " Smog ...
Page 92
... STORAGE : Construct an 5840 SF addition to the existing Electronic Countermeasures ( ECM ) pod for maintenance and storage . The existing facility lacks suf- ficient space for the handling and storage of test items , administra- tive ...
... STORAGE : Construct an 5840 SF addition to the existing Electronic Countermeasures ( ECM ) pod for maintenance and storage . The existing facility lacks suf- ficient space for the handling and storage of test items , administra- tive ...
Page 107
... STORAGE : Construct a 15,000 barrel JP - 4 storage tank to meet operational requirements in support of Holloman's training mission . issues have increased 25 percent since 1979 to meet increases in F - 15 & T - 38 training sorties ...
... STORAGE : Construct a 15,000 barrel JP - 4 storage tank to meet operational requirements in support of Holloman's training mission . issues have increased 25 percent since 1979 to meet increases in F - 15 & T - 38 training sorties ...
Other editions - View all
Common terms and phrases
1391c PREVIOUS EDITION 1983 MILITARY CONSTRUCTION ADDITIONAL PERSONNEL NECESSARY AIR FORCE BASE Air Force FY Air Pollution aircraft Appropriated Or Requested CATEGORY CODE CIVILIAN OFFICER ENLISTED COMPONENT AIR FORCE CONSTRUCTION PROJECT DATA COST ESTIMATES ITEM COST TO OPERATE DATA AIR FORCE Date Design Complete Date Design Started DATE FY DESCRIPTION OF PROPOSED DESIGN DATA Estimated EDITION IS OBSOLETE Energy Conservation ENLISTED CIVILIAN OFFICER Equipment Nomenclature ESTIMATED LIFE-CYCLE COST ESTIMATES ITEM U/M EXISTING FACILITY FORCE 3 INSTALLATION FY 1983 MILITARY INCLUDED IN FOLLOWING INSPECTION AND OVERHEAD INSTALLATION AND LOCATION MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT NUMBER OF ADDITIONAL OFFICER ENLISTED CIVILIAN OPERATE AND MAINTAIN OPERATE THE PROPOSED Percent Complete Production of Plans PROJECT COST S000 PROJECT DATA AIR PROJECT NUMBER PROJECT TITLE PROPOSED FACILITY QUANTITY UNIT COST Reinforced concrete REQUIREMENT Standard or Definitive storage STRATEGIC AIR COMMAND Subtotal-Major Construction U/M QUANTITY UNIT UNIT COST COST USAF Water Pollution
Popular passages
Page 52 - Projects have been sited to avoid or reduce the risk of flood loss, minimize the impact of floods or human safety, health and welfare, preserve and enhance the natural and beneficial values of wetlands and minimize the destruction, loss or degradation of wetlands.
Page 1332 - Guard installations have been developed, reviewed, and selected for early economic payoff and maximum reduction of energy consumption. Projects include improvement to existing facilities and utilities systems to upgrade design, eliminate waste, and install energy-saving devices. Criteria for all new facility construction in the...
Page 871 - FACILITY 665 ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT. NA ($000) E. DESIGN DATA (Estimated) 1 . STATUS a. Date Design Started J"1 j| ' b. Percent Complete as of January l, 1982 -^ c. Percent Complete as of October 1, 19^".
Page 1600 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C.
Page 653 - To acquire in fee or restrictive easement the necessary land interest for expanded clear zones at the ends of the runway. REQUIREMENT: As part of the Air Installation Compatible Use Zones (AICUZ) program, expanded clear zones have been delineated and identified for property rights acquisition to prevent development in this high accident potential area. CURRENT SITUATION: Expanding developments accompanying recent population growth in urban areas have resulted in progressive encroachment upon Air...
Page 773 - FACILITY 250 ($000) B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C.
Page 1222 - B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE PROPOSED FACILITY — ($000) D.