Military Construction Appropriations for 1983: Hearings Before a Subcommittee of the Committee on Appropriations, House of Representatives, Ninety-seventh Congress, Second Session, Subcommittee on Military Construction Appropriations, Part 2U.S. Government Printing Office, 1982 - United States |
From inside the book
Page 61
... COST ESTIMATES ENERGY CONSERVATION ITEM TOTAL ENERGY CONSERVATION OTHER ENERGY CONSERVATION ITEMS INCLUDED IN MINOR CONSTRUCTION U / M QUANTITY UNIT COST COST ( S000 ) LS 47,960 47,960 ( NON - ADD ) ( 11,560 ) 10. DESCRIPTION OF ...
... COST ESTIMATES ENERGY CONSERVATION ITEM TOTAL ENERGY CONSERVATION OTHER ENERGY CONSERVATION ITEMS INCLUDED IN MINOR CONSTRUCTION U / M QUANTITY UNIT COST COST ( S000 ) LS 47,960 47,960 ( NON - ADD ) ( 11,560 ) 10. DESCRIPTION OF ...
Page 176
... COST ESTIMATES ITEM U / M QUANTITY UNIT COST COST ( 5000 ) MATERIALS LABORATORY SUPPORTING FACILITIES ELECTRIC TRANSFORMER UTILITIES SITE IMPROVEMENTS ROADS , PARKING AND WALKS SF 87,200 189.00 16,481 2,195 LS ( 1,070 ) KVA 12,500 30.00 ...
... COST ESTIMATES ITEM U / M QUANTITY UNIT COST COST ( 5000 ) MATERIALS LABORATORY SUPPORTING FACILITIES ELECTRIC TRANSFORMER UTILITIES SITE IMPROVEMENTS ROADS , PARKING AND WALKS SF 87,200 189.00 16,481 2,195 LS ( 1,070 ) KVA 12,500 30.00 ...
Page 179
... COST ESTIMATES ITEM U / M QUANTITY UNIT COST COST ( 5000 ) ALTER FTD COMPUTER FACILITY SUPPORTING FACILITIES SF 24,600 62.00 1,525 ELECTRIC SUBTOTAL CONTINGENCY ( 10 % ) TOTAL CONTRACT COST TOTAL REQUEST LS 282 ( 282 ) 1,807 181 1,988 ...
... COST ESTIMATES ITEM U / M QUANTITY UNIT COST COST ( 5000 ) ALTER FTD COMPUTER FACILITY SUPPORTING FACILITIES SF 24,600 62.00 1,525 ELECTRIC SUBTOTAL CONTINGENCY ( 10 % ) TOTAL CONTRACT COST TOTAL REQUEST LS 282 ( 282 ) 1,807 181 1,988 ...
Page 199
... COST ESTIMATES ITEM U / M QUANTITY UNIT COST COST ( 5000 ) Flight Test Support Complex Addition to Bldg 1623 LS 3,251 SF 20,800 54.00 ( 1,123 ) Systems Test Engineering Facility Alterations to Bldg 1623 SF 20,800 66.00 ( 1,373 ) Power ...
... COST ESTIMATES ITEM U / M QUANTITY UNIT COST COST ( 5000 ) Flight Test Support Complex Addition to Bldg 1623 LS 3,251 SF 20,800 54.00 ( 1,123 ) Systems Test Engineering Facility Alterations to Bldg 1623 SF 20,800 66.00 ( 1,373 ) Power ...
Page 279
... COST ESTIMATES ITEM U / M QUANTITY UNIT COST COST ( 5000 ) READINESS TRAINING FACILITY SUPPORTING FACILITIES ELECTRIC EMERGENCY POWER SF 54,600 95.00 5,187 1,430 LS ( 180 ) LS ( 300 ) UTILITIES LS ( 200 ) RELOCATION LS ( 100 ) SITE ...
... COST ESTIMATES ITEM U / M QUANTITY UNIT COST COST ( 5000 ) READINESS TRAINING FACILITY SUPPORTING FACILITIES ELECTRIC EMERGENCY POWER SF 54,600 95.00 5,187 1,430 LS ( 180 ) LS ( 300 ) UTILITIES LS ( 200 ) RELOCATION LS ( 100 ) SITE ...
Other editions - View all
Common terms and phrases
1391c PREVIOUS EDITION 1983 MILITARY CONSTRUCTION ADDITIONAL PERSONNEL NECESSARY AIR FORCE BASE Air Force FY Air Pollution aircraft Appropriated Or Requested CATEGORY CODE CIVILIAN OFFICER ENLISTED COMPONENT AIR FORCE CONSTRUCTION PROJECT DATA COST ESTIMATES ITEM COST TO OPERATE DATA AIR FORCE Date Design Complete Date Design Started DATE FY DESCRIPTION OF PROPOSED DESIGN DATA Estimated EDITION IS OBSOLETE Energy Conservation ENLISTED CIVILIAN OFFICER Equipment Nomenclature ESTIMATED LIFE-CYCLE COST ESTIMATES ITEM U/M EXISTING FACILITY FORCE 3 INSTALLATION FY 1983 MILITARY INCLUDED IN FOLLOWING INSPECTION AND OVERHEAD INSTALLATION AND LOCATION MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT NUMBER OF ADDITIONAL OFFICER ENLISTED CIVILIAN OPERATE AND MAINTAIN OPERATE THE PROPOSED Percent Complete Production of Plans PROJECT COST S000 PROJECT DATA AIR PROJECT NUMBER PROJECT TITLE PROPOSED FACILITY QUANTITY UNIT COST Reinforced concrete REQUIREMENT Standard or Definitive storage STRATEGIC AIR COMMAND Subtotal-Major Construction U/M QUANTITY UNIT UNIT COST COST USAF Water Pollution
Popular passages
Page 52 - Projects have been sited to avoid or reduce the risk of flood loss, minimize the impact of floods or human safety, health and welfare, preserve and enhance the natural and beneficial values of wetlands and minimize the destruction, loss or degradation of wetlands.
Page 1332 - Guard installations have been developed, reviewed, and selected for early economic payoff and maximum reduction of energy consumption. Projects include improvement to existing facilities and utilities systems to upgrade design, eliminate waste, and install energy-saving devices. Criteria for all new facility construction in the...
Page 871 - FACILITY 665 ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT. NA ($000) E. DESIGN DATA (Estimated) 1 . STATUS a. Date Design Started J"1 j| ' b. Percent Complete as of January l, 1982 -^ c. Percent Complete as of October 1, 19^".
Page 1600 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C.
Page 653 - To acquire in fee or restrictive easement the necessary land interest for expanded clear zones at the ends of the runway. REQUIREMENT: As part of the Air Installation Compatible Use Zones (AICUZ) program, expanded clear zones have been delineated and identified for property rights acquisition to prevent development in this high accident potential area. CURRENT SITUATION: Expanding developments accompanying recent population growth in urban areas have resulted in progressive encroachment upon Air...
Page 773 - FACILITY 250 ($000) B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C.
Page 1222 - B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE PROPOSED FACILITY — ($000) D.