... Maintenance Unit Facility Add to Gymnasium 45 100 35 Aircraft Maintenance Area Lighting 35 Subtotal Chanute AFB ATC 136 Gymnasium 95 Energy Conservation Investment Program 60 Add to and Alter Water Treatment Plant 75 Scott AFB MAC 207 ...
... Maintenance Unit Facility Add to Gymnasium 45 100 35 Aircraft Maintenance Area Lighting 35 Subtotal Chanute AFB ATC 136 Gymnasium 95 Energy Conservation Investment Program 60 Add to and Alter Water Treatment Plant 75 Scott AFB MAC 207 ...
Page 39
... Maintenance Unit Facility 980 980 Sound Suppressor Support 670 670 90 Vehicle Maintenance Shop 1,900 1,900 Data Processing Facility Add to Water System 370 4,550 370 4,550 90 25 ( 35 % By March ) 10 ( 35 % By May ) Subtotal 21,920 ...
... Maintenance Unit Facility 980 980 Sound Suppressor Support 670 670 90 Vehicle Maintenance Shop 1,900 1,900 Data Processing Facility Add to Water System 370 4,550 370 4,550 90 25 ( 35 % By March ) 10 ( 35 % By May ) Subtotal 21,920 ...
Page 46
... Maintenance Hangars 670 670 100 ADAL Fuel System Maintenance Dock 2,200 2,200 Vehicle Maintenance Complex 1,900 1,900 033 35 35 Refueling Vehicle Maintenance Shop 900 900 Add to and Alter Data Processing Facility 1,000 1,000 Energy ...
... Maintenance Hangars 670 670 100 ADAL Fuel System Maintenance Dock 2,200 2,200 Vehicle Maintenance Complex 1,900 1,900 033 35 35 Refueling Vehicle Maintenance Shop 900 900 Add to and Alter Data Processing Facility 1,000 1,000 Energy ...
Page 47
... Maintenance Facility 439 10 ( 35 % By March ) Subtotal Kadena AB PAF 381 Aircraft Corrosion Control Facility Vehicle Maintenance Shop Add to Munitions Maintenance Shop Jet Fuel Storage , Phase III Alter Unaccompanied Enlisted Personnel ...
... Maintenance Facility 439 10 ( 35 % By March ) Subtotal Kadena AB PAF 381 Aircraft Corrosion Control Facility Vehicle Maintenance Shop Add to Munitions Maintenance Shop Jet Fuel Storage , Phase III Alter Unaccompanied Enlisted Personnel ...
Page 97
... MAINTENANCE SHOP . Construct a munitions maintenance shop to replace a substandard facil- ity . The facility is required for the maintenance , inspection , testing and assembly of non - nuclear muni- tions used on the A - 10's assigned ...
... MAINTENANCE SHOP . Construct a munitions maintenance shop to replace a substandard facil- ity . The facility is required for the maintenance , inspection , testing and assembly of non - nuclear muni- tions used on the A - 10's assigned ...
Other editions - View all
Common terms and phrases
1391c PREVIOUS EDITION 1983 MILITARY CONSTRUCTION ADDITIONAL PERSONNEL NECESSARY AIR FORCE BASE Air Force FY Air Pollution aircraft Appropriated Or Requested CATEGORY CODE CIVILIAN OFFICER ENLISTED COMPONENT AIR FORCE CONSTRUCTION PROJECT DATA COST ESTIMATES ITEM COST TO OPERATE DATA AIR FORCE Date Design Complete Date Design Started DATE FY DESCRIPTION OF PROPOSED DESIGN DATA Estimated EDITION IS OBSOLETE Energy Conservation ENLISTED CIVILIAN OFFICER Equipment Nomenclature ESTIMATED LIFE-CYCLE COST ESTIMATES ITEM U/M EXISTING FACILITY FORCE 3 INSTALLATION FY 1983 MILITARY INCLUDED IN FOLLOWING INSPECTION AND OVERHEAD INSTALLATION AND LOCATION MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT NUMBER OF ADDITIONAL OFFICER ENLISTED CIVILIAN OPERATE AND MAINTAIN OPERATE THE PROPOSED Percent Complete Production of Plans PROJECT COST S000 PROJECT DATA AIR PROJECT NUMBER PROJECT TITLE PROPOSED FACILITY QUANTITY UNIT COST Reinforced concrete REQUIREMENT Standard or Definitive storage STRATEGIC AIR COMMAND Subtotal-Major Construction U/M QUANTITY UNIT UNIT COST COST USAF Water Pollution
Popular passages
Page 52 - Projects have been sited to avoid or reduce the risk of flood loss, minimize the impact of floods or human safety, health and welfare, preserve and enhance the natural and beneficial values of wetlands and minimize the destruction, loss or degradation of wetlands.
Page 1332 - Guard installations have been developed, reviewed, and selected for early economic payoff and maximum reduction of energy consumption. Projects include improvement to existing facilities and utilities systems to upgrade design, eliminate waste, and install energy-saving devices. Criteria for all new facility construction in the...
Page 871 - FACILITY 665 ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT. NA ($000) E. DESIGN DATA (Estimated) 1 . STATUS a. Date Design Started J"1 j| ' b. Percent Complete as of January l, 1982 -^ c. Percent Complete as of October 1, 19^".
Page 1600 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C.
Page 653 - To acquire in fee or restrictive easement the necessary land interest for expanded clear zones at the ends of the runway. REQUIREMENT: As part of the Air Installation Compatible Use Zones (AICUZ) program, expanded clear zones have been delineated and identified for property rights acquisition to prevent development in this high accident potential area. CURRENT SITUATION: Expanding developments accompanying recent population growth in urban areas have resulted in progressive encroachment upon Air...
Page 773 - FACILITY 250 ($000) B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C.