Page images
PDF
EPUB

1. COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROGRAM Air Force 3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTR

COST INDEX

UNITED STATES AIR ZWEIBRUCKEN AIR BASE, GERMANY

FORCES IN EUROPE.

1.6 6. PERSONNEL

PERMANENT
STUDENTS

SUPPORTED
STRENGTH:

TOTAL

[ocr errors]

INLESTID

CIVILIAN

OFFICE

ENLISTED CIVILIAN

[ocr errors]

INLETED

OVILLAN

[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

610-711 Alter Data Processing

7,000 SF 1,020 Sep 81 Sep 82 Facility Subtotal-Major Construction

1,020 800-000 Energy Conservation Invest

LS

510 Dec 80 Jun 81 ment Program (See Page 73 ) Subtotal-Minor Construction (Specified)

510 Total

1,530 9. Future Projects: (a) Included in Following Program (FY 84): None

(b) Typical Planned Next Three Years: 136-661 Approach Lights

1,500 SF

862 141-453 Base Operations

8,715 SF 1,237 141-743 Base Photo Lab

4,097 SF 797 211-193 Sound Suppressor Support

LS

1,000 841-165 Water Treatment Plant

146 TD 1,485 10. Mission or Major Functions: This base hosts a wing headquarters which is responsible for management, command, control and direction for USAFE units assigned to the base and a tactical reconnaissance squadron operating RF-4C aircraft in support of tactical forces in the theater of operations.

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

ZWEIBRUCKEN AIR BASE GERMANY

INSTALLATION/LOCATION

USAFE
COMMAND

(5000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

701

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION All electrical structural, and mechanical required to provide an effective, functional facility. Includes computer and remote terminal rooms, tape library, supply, storage, maintenance, and administrative areas. 11. REQUIREMENT: 7,000 SF ADEQUATE: 2,793 SUBSTANDARD: 0 SF PROJECT: Alteration of an existing data processing facility. REQUIREMENT: A properly sized and configured facility is required to house the new Phase IV computer. The Phase IV computer acquisition program affects every USAF installation and represents a $50 million annual savings Air Force wide by replacing obsolete Burroughs 3500/3700/4700 and Univac 1050-II computers. It is necessary to support essential weapon system maintenance and supply activities, and permit more effective management of personnel, financial, engineering, and equipment resources at Base Level. The computer system is scheduled for delivery in March 1984. CURRENT SITUATION: The two existing computers to be replaced by the Phase IV computer are located in two separate facilities. The current physical limitation of these facilities will not permit installation of the new Phase IV computer. There is no other facility available that meets the required space criteria. Alteration of one of the existing facilities is necessary to adequately accommodate the new computer equipment and associated support functions. IMPACT IF NOT

PROVIDED: We will have no place to house the expensive conputer now on order.

MAY

[ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors]

ESTIMATED ANNUAL COST TO C?E?ATE TEE P?OPOSED FACILI...,

18 (5000)

B.

N3 ER OF DITIONAL PERSOAXEL VECESS:13Y TO CEZ CUT
THE FUNCTION 0: THE PROPOSED FACILITY.....

[ocr errors][merged small]

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE 4) MAINIAIS DE
PROPOSED FACILIT..

NA (5000)

D.

ESTIVSED LIFE-CYCLE COST TO OPEPATE AJ MAINTAIN TO
EXISTING FACILITI IF NEN ESCILITI IS A REPLACEMENT,

NA (5000)

2.

DESIGN DATA (Estina:ed)

1.

STATUS

Date Desiga Started.......
Percent Coapiete as of January 1, 1982
Percze: Complete as of cotober 1, 1982
Date Desiga Corplece.

Sep 81

35

b.

100

d.

Sep 82

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITE TEIS PROJECT WHICH WILL 33
PROVIDD FROM OTEER. APPROPRIATIO:S:

Fiscal Year
Equipment

Procuring
Appropriated

Cost
Noseaclature
Appropriation

0: Becuested (5000) Phase IV Computer

3080

FY85*

1,300 *Equipment to be leased with 3400 funds from date of delivery until purchase. DD, 13910

ЕС

PREVIOUS EDITIOVISOOSOLETE IN THE USAT.

PAGE MO

[blocks in formation]
« PreviousContinue »