A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY... B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT 18 ($000) 0 (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 1,432 ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE NA ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Fiscal Year Cost ($000) PAGE NO PREVIOUS EDITION IS OBSOLETE IN THE USAF. DU.S. G.P.O. 1977-241-130/12 15 Includes upgrade All electrical, structural, and mechanical work necessary to upgrade existing housing to acceptable standards of livability. of baths, interroom noise attenuation, improved personnel safety and energy conservation features. Also includes bedrooms, lounges, centralized storage, laundry, and support space. Grade Mix: 268 E1-E4 18 E5-E6 11. ON BASE REQUIREMENT: 1402 PN ADEQUATE: 286 PN SUBSTANDARD: 1144 PN PROJECT: Alter an existing unaccompanied enlisted housing facility. REQUIREMENT: A major Air Force objective is to provide unaccompanied enlisted personnel with housing that will be conducive to their proper rest, relaxation and personal well being. Properly designed and furnished quarters which provide some degree of individual privacy are essential to the successful accomplishment of the increasingly complicated and important jobs these personnel must perform. The lack of such quarters is an irritant to these personnel and a known contributor to low re-enlistment rates. The Air Force should remove this irritant to maintain an effective force of experienced airmen. CURRENT SITUATION: The facility to be upgraded was constructed in 1958. It has inadequate lighting, poor insulation and sound attenuation, obsolete electrical and mechanical systems and central latrines. This project is phase two of a four phase program which will eventually provide upgraded quarters to meet the full programming need for the base. When this project is completed, 41% of that goal will be reached. IMPACT IF NOT FUNDED: Substandard living conditions will persist at the base and the morale, productivity and career satisfaction of the enlisted force will continue to be degraded. MAY A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.. 3. NOBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AUTO MAINTAIN THE ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE DATE EOTIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL SE PROVIDED FROM OTHER APPROPRIATIONS: Equipment Nomenclature None Procuring Fiscal Year Cost ($OCC) 90-276 0-82-56 1,720 11, 030 Future Projects: (a) Included in Following Program (Y 84): 740-633 411-000 10. Mission or Major Functions: This base hosts a tactical fighter wing which is responsible for management, command, control and direction for USAFE units located at RAF Upper Heyford and three tactical fighter squadrons operating F-111E aircraft in support of contingency and war plans. DD FORM 1390 SUPPLEMENTAL DATA AIR FORCE RAF UPPER HEYFORD, UNITED KINGDOM A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR): Permanent Facilities ( B. SIMILAR UNUSED SPACE: USAFE COMMAND ($000) 5,701 5,701) 0 ) C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS: |