Page images
PDF
EPUB

1. COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROGRAM Air Force 3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTR.

COST INDEX

UNITED STATES AIR SPANGDAHLEM AIR BASE, GERMANY

FORCES IN EUROPE

1.16 6. PERSONNEL

PERMANENT
STUDENTS

SUPPORTED
STRENGTH

TOTAL

[ocr errors]
[ocr errors]

ENLIGTIO

OVLAR

[ocr errors]
[ocr errors]

OVILA

[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

610-711 Data Processing Facility 6,700 SF 1,820 Sep 81

Aug 82 Subtotal-Major Construction

1,820 131-138 Add to and Alter Digital 1,000 SF 410 Sep 81 Aug 82

European Backbone Facility (See Page 72 )
Subtotal-Minor Construction
(Specified)

410
Total

2,230 9. Future Projects: (a) Included in Following Program (FY 84): None

(b) Typical Planned Next Three Years: 171-476 Small Arms Range

LS

760 211-193 Sound Suppressor Support

LS

500 214-425 Transportation Maintenance 29,000 SF 3,425

Facility 219-944 Civil Engineer Complex 43,700 SF 2,884 852-269 POL Operations Parking

7,000 SY 458 10. Mission or Major Functions: This base hosts a tactical fighter wing. Responsible headquarters and is host unit for USAFE assigned to Spangdahlem Air Base and three tactical fighter squadrons operating F-4 aircraft in support of contingency and war plans.

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

SPANGDAHLEM AIR BASE, GERMANY

INSTALLATION/LOCATION

USAFE
COMMAND

($000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

2,644

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

GJA

2. DATE

1 COMPONENT

FY 19_83 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3 INSTALLATION AND LOCATION

4. PROJECT TITLE

[blocks in formation]

10. DESCRIPTION OF PROPOSED CONSTRUCTION Reinforced concrete footings and floor slab, walls, and roof, special air conditioning for environmental control, raised computer flooring, fire protection systems, utilities and necessary support. Includes computer and remote terminal rooms, tape library, supply, storage, maintenance and administrative areas.

Air Conditioning - 30 Tons 11. REQUIREMENT: 6,700 SF ADEQUATE: 0

SUBSTANDARD: 1,400 SF PROJECT: Construction of a new data processing facility. REQUIREMENT: A properly sized and configured facility is required to house the new Phase IV computer. The Phase IV computer acquisition program affects every USAF installation and represents a $50 million annual savings Air Force wide by replacing obsolete Burroughs 3500/3700/4700 and Univac 1050-II computers. It is necessary to support essential weapon system maintenance and supply activities, and permit more effective management of personnel, financial, engineering, and equipment resources at base level. The computer system is scheduled for delivery in July 1984. CURRENT SITUATION: The two existing computers to be replaced by the Phase IV computer are located in two separate facilities. The current physical limitation of these facilities will not permit installation of the new Phase IV computer. There is no other facility available that meets the required space criteria. Construction of a new facility is necessary to adequately accommodate the new computer equipment and associated support functions. IMPACT IF NOT PROVIDED: We will have no place to house the expensive computer now on order.

MAY

COMPONENT

2. DATE FY 19.83 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION

[blocks in formation]

18 ($000)

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY...

0
(PEOPLE)

[ocr errors]

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

NA
($000)

D.

[ocr errors]

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

NA

($000)

[blocks in formation]

Sep 81

35

100 Aug 82

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost
($ 000)

Phase IV Computer 3080

FY 85*

1,200 * Equipment to be leased with 3400 funds from date of delivery until purchased. DD, 13910 PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO
BU.s. G.P.O. 1977-241.730/12 15

SA

1. COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROGRAM Air Force 3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTR

COST INDEX

UNITED STATES AIR TORREJON AIR BASE, SPAIN

FORCES IN EUROPE

1.3 6. PERSONNEL

PERMANENT
STUDENTS

SUPPORTED
STRENGTH:

TOTAL

[ocr errors]

CIVALI

[ocr errors]

OVILIAN

[ocr errors]

INLOTED

[ocr errors]
[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]

PROJECT TITLE

(S000)

START

COMPLETE

CODE

SCOPE 211-193 Sound Suppressor Support

LS 1,100 Jul 81 Sep 82 214-467 Refueling Vehicle Complex

LS 1,200 Aug 79 Dec 81 721-312 Unaccomp Enl Pers Hsg

286 PN 1,700 Aug 81

Aug 82 Subtotal Major Construction

4,000 116-661 Arm/Disarm Pad (See Page 79) 13,700 SY 600 Oct 81

Sep 82 800-000 Energy Conservation (See Page 79) LS 650 Jul 81 Jun 82

Investment Program Subtotal-Minor Construction (Specified)

1,250 Total

5,250 9. Future Projects: (a) Included in Following Program (FY 84): 116-661 Arm/Disarm Pad

LS

698 Total

698 (b) Typical Planned Next Three Years: 131-661 Approach Lighting

3,000 LF 302 211-154 POMO

7,800 SF 641 214-425 Vehicle Maintenance Shop 30,700 SF 2,244 214-425 Vehicle Maintenance

LS 2,629 Facility 10. Mission or Major Functions: This base hosts a numbered Air Force headquarters which provides management, command, control and direction for USAFE units located in Southern Europe, a tactical fighter wing headquarters which provides management, command, control and direction for USAFE units at Torrejon Air Base and three tactical fighter squadrons operating F-4C aircraft in support of contingency and war plans.

« PreviousContinue »