B. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE .... D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE E. DESIGN DATA (Estimated) 1. STATUS a. Date Design Started. 2. 16 ($000) 0 (PEOPLE) 1,306 NA ($000) May 81 35 100 Aug 82 No X F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature Procuring Fiscal Year (month and year) Cost ($000) Reinforced concrete footings and floor slab, masonry walls, structural steel frame and roof system with built-up roof. Utilities and necessary support. All electrical, structural and mechanical required to provide an effective, functional facility. Includes gymnasium, sauna, exercise and locker rooms, latrines, mechanical and storage space. 11. REQUIREMENT: 20,850 SF ADEQUATE: 10,950 SF SUBSTANDARD: 0 PROJECT: Construction of a gymnasium to provide space for physical conditioning and indoor sports. REQUIREMENT: A facility is required to provide adequate space for physical conditioning and recreation for assigned base personnel. To support the Air Force physical fitness program and maintain morale at a high standard, it is essential to provide a complete and diversified sports program. CURRENT SITUATION: Existing gymnasium can only accommodate a limited sports program. One basketball court; a small weight lifting room and one locker and shower room are all that is available. No other indoor sport facilities are available within the area. Frequent inclement weather emphasizes the need for an indoor sports program. IMPACT IF NOT PROVIDED: Physical fitness and recreational sports programs will remain on a limited scale, adversely affecting the morale and exercise needs of assigned personnel. DD DEC MAY A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT 32 ($000) 0 (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 1,512 D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE E. DESIGN DATA (Estimated) NA ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM OTHER APPROPRIATIONS: AIR FORCE DD FORM 1390 SUPPLEMENTAL DATA GEILENKIRCHEN NATO BASE, GERMANY A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR): Permanent Facilities ( B. SIMILAR UNUSED SPACE: Real Property Categories 740-000 Community Support Facilities Quantity/Unit of None C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS: |