Page images
PDF
EPUB
[blocks in formation]

B.

ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY......

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

....

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

E. DESIGN DATA (Estimated)

1. STATUS

a. Date Design Started.

2.

16 ($000)

0

(PEOPLE)

1,306
($000)

NA

($000)

May 81

[blocks in formation]

35

100

Aug 82

[blocks in formation]
[blocks in formation]

No X

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment

Nomenclature

Procuring
Appropriation

Fiscal Year
Appropriated
Or Requested

(month and

year)

Cost ($000)

[blocks in formation]
[blocks in formation]

Reinforced concrete footings and floor slab, masonry walls, structural steel frame and roof system with built-up roof. Utilities and necessary support. All electrical, structural and mechanical required to provide an effective, functional facility. Includes gymnasium, sauna, exercise and locker rooms, latrines, mechanical and storage space.

11.

REQUIREMENT: 20,850 SF ADEQUATE: 10,950 SF SUBSTANDARD: 0 PROJECT: Construction of a gymnasium to provide space for physical conditioning and indoor sports.

REQUIREMENT: A facility is required to provide adequate space for physical conditioning and recreation for assigned base personnel. To support the Air Force physical fitness program and maintain morale at a high standard, it is essential to provide a complete and diversified sports program. CURRENT SITUATION: Existing gymnasium can only accommodate a limited sports program. One basketball court; a small weight lifting room and one locker and shower room are all that is available. No other indoor sport facilities are available within the area. Frequent inclement weather emphasizes the need for an indoor sports program.

IMPACT IF NOT PROVIDED: Physical fitness and recreational sports programs will remain on a limited scale, adversely affecting the morale and exercise needs of assigned personnel.

DD DEC
1 DEC 7% 1391

MAY

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

32 ($000)

0

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

1,512
($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT

E. DESIGN DATA (Estimated)

NA ($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

F.

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE

PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

90-276 0-82-52

AIR FORCE
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

GEILENKIRCHEN NATO BASE, GERMANY
INSTALLATION/LOCATION

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

Permanent Facilities (
Temporary Facilities (

B.

SIMILAR UNUSED SPACE:

[blocks in formation]

Real Property Categories

740-000

Community Support Facilities

Quantity/Unit of
Measure

None

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]
« PreviousContinue »