SUBSTANDARD: 25,800 LF All electrical and structural work required to upgrade base electrical systems from 10KV to 20KV. Includes primary distribution systems, substations, transformers, switchgear and controls (US share only) 11. REQUIREMENT: 25,800 LF ADEQUATE: 0 PROJECT: A primary distribution system for the flightline area to replace an undersized and deteriorated distribution line. REQUIREMENT: Provides for the installation of an underground Primary Distribution System, alteration and addition of substation facilities and the upgrading of electrical equipment to provide a distribution and supply system in the flightline area for the current and projected power demand. CURRENT SITUATION: The existing electrical distribution system that services the flightline, is inadequate and unreliable. This system is primarily composed of underground cables that were installed more than twenty (20) years ago and sized for the electrical load of that time. Over the years many new facilities have been constructed which has increased the electrical load. As a result, the system cannot meet present load requirements during periods of peak demand. Old switchgears and substations do not meet the current standards and are potential hazards for the maintenance personnel. IMPACT IF NOT PROVIDED: Electrical service in the flight line area will remain unreliable and cause excessive costs for upkeep and be a hazard to personnel maintaining the system. ADDITIONAL: The work included in this project is in support of facilities not in the NATO inventory and is not eligible for NATO funding. A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT 5 ($000) 0 (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 4,415 ($000) NA ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Fiscal Year Mar 83 (month and year) Cost ($000) FORM DD, 1391c PREVIOUS EDITION IS OBSOLETE IN THE USAF. PAGE NO BU.S. G.P.O. 1977-241-130/12 15 5,830 9. Future Projects: (a) Included in Following Program (FY 84): (b) Typical Planned Next Three Years: None 126-925 POL Upgrade 10. Mission or Major Functions: This base hosts a wing headquarters which is responsible for management, command, control and direction for USAFE units assigned to this base and those units assigned to nearby RAF Woodbridge and three tactical fighter squadrons operating A-10 aircraft in support of contingency and war plans. A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR): 1,277 C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS: All electrical, structural, and mechanical work necessary to upgrade existing housing to acceptable standards of livability. Includes central baths, interroom noise attenuation, improved personnel safety and energy conservation feature. Also includes bedrooms, closets, lounges, centralized storage, laundry, and support space. Grade Mix: 94 E1-E4. SUBSTANDARD: 789 PN 11. REQUIREMENT: 1680 PN ADEQUATE: 501 PN PROJECT: Alter an existing unaccompanied enlisted housing facility. REQUIREMENT: A major Air Force objective is to provide unaccompanied enlisted personnel with housing that will be conducive to their proper rest, relaxation and personal well being. Properly designed and furnished quarters which provide some degree of individual privacy are essential to the successful accomplishment of the increasingly complicated and important jobs these personnel must perform. The lack of such quarters is an irritant to these personnel and a known contributor to low re-enlistment. rates. The Air Force should remove this irritant to maintain an effective force of experienced airmen. CURRENT SITUATION: The facility to be upgraded was constructed in 1960. It has inadequate lighting, poor insulation and sound attenuation, obsolete electrical and mechanical systems. This project is phase three of a nine phase program which will eventually provide upgraded quarters to meet the full programming need for the base. When this project is completed, 35% of that goal will be reached. IMPACT IF NOT PROVIDED: Substandard living conditions will persist at the base and the morale, productivity and career satisfaction of the enlisted force will continue to be degraded. |