Page images
PDF
EPUB
[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY......

0

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

4,415

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT,

NA

($000)

[blocks in formation]

Oct 81

15

100 Sen_82

C. d.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost (5000)

[merged small][subsumed][ocr errors][merged small][merged small][merged small]

1. COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROGRAM Air Force 3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTA

COST INDEX

UNITED STATES AIR RAF BENTWATERS. UNITED KINGDOM

FORCES IN EUROPE

5 6. PERSONNEL

PERMANENT
STUDENTS

SUPPORTED
STRENGTH:

ENLISTED

TOTAL

[ocr errors]

CIVILIAN

OPTICIA

ENLITIO

CIVILIAN

OFICER

OVILIAN

[blocks in formation]

CODE

PROJECT TITLE

SCOPE

(5000)

[blocks in formation]

721-312 Alter Unaccompanied Enlisted 94 PN 1,250 Feb 81 Jun 82

Personnel Housing 740-674 Gymnasium

21,000 SF 3,250 Sep 81 Jul 82 Subtotal-Major Construction

4,500 442-765 Warehouse (See Page 80 ) 3,434 SF 310 Jul 81 Jul 82 610-711 Alter Data Processing

6,120 SF 840 May 81 Jul 82 Facility (See Page 80 ) 800-000 Energy Conservation

LS

180 Jul 80 Sep 82 Investment Program (See Page 80 ) Subtotal-Minor Construction (Specified)

1,330 Total

5,830 9. Future Projects: (a) Included in Following Program (FY 84): None

(b) Typical Planned Next Three Years: 126-925 POL Upgrade

LS 2,331 211-174 Aircraft Maintenance

2,700 SF 458 Branch 422-758 Warehouse

35,451 SF 1,832 442-758 A-10 Equipment Warehouse 15,000 SF 694 740-618 Officers Open Mess

16,000 SF 1,360 10. Mission or Major Functions: This base hosts a wing headquarters which is responsible for management, command, control and direction for USAFE units assigned to this base and those units assigned to nearby RAF Woodbridge and three tactical fighter squadrons operating A-10 aircraft in support of contingency and war plans.

[blocks in formation]

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

RAF BENTWATERS, UNITED KINGDOM

INSTALLATION/ LOCATION

USAFE
COMMAND

(5000).

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

1,277

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION
All electrical, structural, and mechanical work necessary to upgrade
existing housing to acceptable standards of livability. Includes central
baths, interroom noise attenuation, improved personnel safety and energy
conservation feature. Also includes bedrooms, closets, lounges, centra-
lized storage, laundry, and support space.
Grade Mix: 94 E1-E4.
11.

REQUIREMENT : 1680 PN ADEQUATE: 501 PN SUBSTANDARD: 789 PN
PROJECT: Alter an existing unaccompanied enlisted housing facility.
REQUIREMENT : A major Air Force objective is to provide unaccompanied
enlisted personnel with housing that will be conducive to their proper
rest, relaxation and personal well being. Properly designed and furnished
quarters which provide some degree of individual privacy are essential to
the successful accomplishment of the increasingly complicated and impor-
tant jobs these personnel must perform. The lack of such quarters is an
irritant to these personnel and a known contributor to low re-enlistment .
rates. The Air Force should remove this irritant to maintain an effective
force of experienced airmen.
CURRENT SITUATION: The facility to be upgraded was constructed in 1960.
It has inadequate lighting, poor insulation and sound attenuation, obso-
lete electrical and mechanical systems. This project is phase three of a
nine phase program which will eventually provide upgraded quarters to meet
the full programming need for the base. When this project is completed,
35% of that goal will be reached.
IMPACT IF NOT PROVIDED: Substandard living conditions will persist at the
base and the morale, productivity and career satisfaction of the enlisted
force will continue to be degradeda
1391

425

[ocr errors]

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTEO

PAGE NO

[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY,

[ocr errors][merged small]

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY......

1,580 ($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT

NA

(5000)

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost (5000)

None

DD, ORA 13910

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO U.S. G.P.0. 1971-241.130/1219

« PreviousContinue »