Page images
PDF
EPUB
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

wing including a tactical fighter group with F-4 and F-16 aircraft; a tactical air support squadron with OV-10 aircraft; and an aerospace rescue and recovery squadron with CH-53/HH-53 aircraft.

AIR FORCE
COMPONENT

A.

DD FORM 1390 SUPPLEMENTAL DATA
FY 19 83 MILITARY CONSTRUCTION PROGRAM

OSAN AIR BASE, KOREA
INSTALLATION/LOCATION

PACAF COMMAND

($000)

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

1,572

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]
[blocks in formation]

Reinforced concrete/steel arch shelters with reinforced concrete footings, foundations and floor slabs, and steel doors; rigid concrete access taxiways and aprons; flexible concrete shoulders; security fencing/lighting and storm drainage; utilities and necessary support. Includes aircraft sheltered parking space adjacent to main operational ramp.

11. REQUIREMENT: As required.

PROJECT: Construction of three hardened aircraft shelters and access pavements.

REQUIREMENT: Osan Air Base is a main operational base for the U.S. Air Force and is essential to the successful execution of contingency plans for the defense of South Korea. Without the protection afforded by hardened shelters, aircraft are vulnerable to ground and air attack by hostile forces. The PACAF goal is to provide protective shelters for all permanently assigned fighter aircraft as well as for those which would deploy intheater during a crisis.

CURRENT SITUATION: The requirement for hardened shelters is being satisfied incrementally. Nine new shelters are being constructed under an FY 80 MCP project. There are 59 shelters without protective doors; 50 existing shelters are being fitted with protective doors, 28 under the FY 81 MCP and 22 under the FY 82 MCP. The remaining nine shelters will be provided with doors in an outyear program once siting/configuration problems are resolved. Approval of this FY 83 project will leave a deficit of 12 shelters at Osan to be programmed in future program years.

IMPACT IF NOT PROVIDED: Combat aircraft will be exposed to ground and air attack and the phased correction of this deficiency will be delayed.

90-276 0-82--47

MAY

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

D.

($000)

NA (PEOPLE)

NA

($000)

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

[ocr errors][merged small][merged small]

E. DESIGN DATA (Estimated)

1. STATUS

a. Date Design Started.

Feb 79

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment

Nomenclature

Procuring
Appropriation

Fiscal Year
Appropriated
Or Requested

None

Dec 82

(month and year)

Cost ($000)

FORM

DD 1391c

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO

DU.S. G.P.0. 1977-241-130/12 15

« PreviousContinue »