wing including a tactical fighter group with F-4 and F-16 aircraft; a tactical air support squadron with OV-10 aircraft; and an aerospace rescue and recovery squadron with CH-53/HH-53 aircraft. AIR FORCE A. DD FORM 1390 SUPPLEMENTAL DATA OSAN AIR BASE, KOREA PACAF COMMAND ($000) ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR): 1,572 C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS: Reinforced concrete/steel arch shelters with reinforced concrete footings, foundations and floor slabs, and steel doors; rigid concrete access taxiways and aprons; flexible concrete shoulders; security fencing/lighting and storm drainage; utilities and necessary support. Includes aircraft sheltered parking space adjacent to main operational ramp. 11. REQUIREMENT: As required. PROJECT: Construction of three hardened aircraft shelters and access pavements. REQUIREMENT: Osan Air Base is a main operational base for the U.S. Air Force and is essential to the successful execution of contingency plans for the defense of South Korea. Without the protection afforded by hardened shelters, aircraft are vulnerable to ground and air attack by hostile forces. The PACAF goal is to provide protective shelters for all permanently assigned fighter aircraft as well as for those which would deploy intheater during a crisis. CURRENT SITUATION: The requirement for hardened shelters is being satisfied incrementally. Nine new shelters are being constructed under an FY 80 MCP project. There are 59 shelters without protective doors; 50 existing shelters are being fitted with protective doors, 28 under the FY 81 MCP and 22 under the FY 82 MCP. The remaining nine shelters will be provided with doors in an outyear program once siting/configuration problems are resolved. Approval of this FY 83 project will leave a deficit of 12 shelters at Osan to be programmed in future program years. IMPACT IF NOT PROVIDED: Combat aircraft will be exposed to ground and air attack and the phased correction of this deficiency will be delayed. 90-276 0-82--47 MAY A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ($000) NA (PEOPLE) NA ($000) ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE E. DESIGN DATA (Estimated) 1. STATUS a. Date Design Started. Feb 79 F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature Procuring Fiscal Year None Dec 82 (month and year) Cost ($000) FORM DD 1391c PREVIOUS EDITION IS OBSOLETE IN THE USAF. PAGE NO DU.S. G.P.0. 1977-241-130/12 15 |